13.07.2015 Views

Covered Task - Kinder Morgan

Covered Task - Kinder Morgan

Covered Task - Kinder Morgan

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Appendix B<strong>Kinder</strong> <strong>Morgan</strong> Operator Qualification ProgramList of <strong>Covered</strong> <strong>Task</strong>s – Hazardous Liquid Pipelines – Part 195revised 12/4/13No. <strong>Covered</strong> <strong>Task</strong>s RequalificationFrequencyPage 3 of 33InitialQualificationMethod103.07 Repair pressurized breakout tanks 3 yrs. Knowledge Testand PerformanceEvaluation103.08 reserved for future use103.09 Non-destructive testing of welds 3 yrs. AOC KnowledgeTest andPerformanceEvaluationSubsequentRe-qualificationMethodSpan ofControlDOT Part 195 referenceKnowledge Test 1:3 205b3, 307, 432cAOC KnowledgeTest andPerformanceEvaluation1:3 228, 234103.10 reserved for future use103.11 Damage Prevention during excavation activities 3 yrs. Knowledge Test Knowledge Test 1:1 442103.12 Inspection activities – welding on pipeline system 3 yrs. Knowledge Test Knowledge Test 1:1 208, 214, 216, 222, 224,226, 228, 230103.13 Inspection activities – non-destructive testing 3 yrs. Knowledge Test Knowledge Test 1:1 234, 234a103.14 Conduct DOT pipeline pressure tests 3 yrs. Knowledge Test Knowledge Test 1:2 Subpart Eand PerformanceEvaluation103.15 CPM Leak detection 3 yrs. Knowledge Test Knowledge Test 1:1 134, 444and PerformanceEvaluation104.01 Inspect buried pipe when exposed 3 yrs. Knowledge Test Knowledge Test 1:1 403a, 442c6, 561, 569and PerformanceEvaluation104.02 Measure damage on pipe – manual measurement 3 yrs. Knowledge Test Knowledge Test 1:1 403a, 585, 587and PerformanceEvaluation104.03 Measure wall thickness of pipe – ultrasonic measurement 3 yrs. Knowledge Test Knowledge Test 1:1 403a, 585, 587and PerformanceEvaluation104.04 Place and maintain permanent line markers 3 yrs. Knowledge Test Knowledge Test 1:4 403a, 410and PerformanceEvaluation104.05 Inspect surface conditions of right-of-way 3 yrs. Knowledge Test Knowledge Test 1:1 403a, 412a, 442and PerformanceEvaluation104.06 Inspection following blasting 3 yrs. Knowledge Test Knowledge Test 1:1 442c6and PerformanceEvaluation104.07 DOT semi-annual inspection of valves 3 yrs. Knowledge Testand PerformanceEvaluationKnowledge Test 1:2 116, 258, 420b

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!