Appendix B<strong>Kinder</strong> <strong>Morgan</strong> Operator Qualification ProgramList of <strong>Covered</strong> <strong>Task</strong>s – Hazardous Liquid Pipelines – Part 195revised 12/4/13No. <strong>Covered</strong> <strong>Task</strong>s RequalificationFrequencyInitialQualificationMethod105.12 Operations of Pipeline System – emergency station shut-in 3 yrs. Knowledge Testand PerformanceEvaluation105.13 Operations of pipeline system - Unit adjustment 3 yrs. Knowledge Testand PerformanceEvaluation105.14 Operations of pipeline system - Tank Management 3 yrs. Knowledge Testand PerformanceEvaluation105.15 Operations of Pipeline System - Monitor communications 3 yrs. Knowledge Testand PerformanceEvaluation105.16 Operations of Pipeline System - Monitor leak detection and lineintegrity3 yrs. Knowledge Testand PerformanceEvaluation105.17 Operations of Pipeline System - Monitor flow rates 3 yrs. Knowledge Testand PerformanceEvaluation105.18 Operations of Pipeline System - Maintain pressures withinallowable limits105.19 Operations of Pipeline System - Manually or remotely open orclose valves3 yrs. Knowledge Testand PerformanceEvaluation3 yrs. Knowledge Testand PerformanceEvaluation105.20 Operations of Pipeline System – Operating pressure test 3 yrs. Knowledge Testand PerformanceEvaluation105.21 Operate pressure relieving devices for launching and receivingfacilities3 yrs. Knowledge Testand PerformanceEvaluation106.01 Maintain and repair power valve actuators 3 yrs. Knowledge Testand PerformanceEvaluation106.02 Lubricate valve actuators 3 yrs. Knowledge Testand PerformanceEvaluation106.03 Lubricate valves 3 yrs. Knowledge Testand PerformanceEvaluationSubsequentRe-qualificationMethodKnowledge Testand PerformanceEvaluationKnowledge Testand PerformanceEvaluationKnowledge Testand PerformanceEvaluationSpan ofControlKnowledge Test 1:1 408Knowledge Testand PerformanceEvaluationKnowledge Testand PerformanceEvaluationKnowledge Testand PerformanceEvaluationDOT Part 195 reference1:1 402c7, 402c8, 402c9,402d, 402e, 406, 4081:1 402c7, 402c8, 402c9,402d, 402e, 406, 4081:1 402c9, 402d, 402e, 408a1:1 402c7, 402c8, 402c9,402d, 402e, 4081:1 402c9, 402d, 402e, 4081:1 402c7, 402c8, 402c9,402d, 402e, 406, 408Knowledge Test 1:1 402c7, 402c8, 402c9,402d, 402e, 406, 408Knowledge Test 1:1 402c7, 402c8, 402c9,402d, 402e, 406, 408Knowledge Test 1:2 426Knowledge Test 1:2 420aKnowledge Test 1:2 420aKnowledge Test 1:2 420aPage 6 of 33
Appendix B<strong>Kinder</strong> <strong>Morgan</strong> Operator Qualification ProgramList of <strong>Covered</strong> <strong>Task</strong>s – Hazardous Liquid Pipelines – Part 195revised 12/4/13No. <strong>Covered</strong> <strong>Task</strong>s RequalificationFrequencyInitialQualificationMethod106.04 Repair valves 3 yrs. Knowledge Testand PerformanceEvaluation106.05 Overpressure safety devices - Inspect, test and calibrate reliefvalves106.06 Overpressure safety devices - pressure switches andtransmitters106.07 Pressure Limiting Devices - Inspect, test and calibratemechanical control valves106.08 Pressure Limiting Devices - Inspect, test and calibrateelectronic/electro-hydraulic control loops3 yrs. Knowledge Testand PerformanceEvaluation3 yrs. Knowledge Testand PerformanceEvaluation3 yrs. Knowledge Testand PerformanceEvaluation3 yrs. Knowledge Testand PerformanceEvaluation106.09 Overfill protective devices – repair and replacement 3 yrs. Knowledge Testand PerformanceEvaluationSubsequentRe-qualificationMethodSpan ofControlDOT Part 195 referenceKnowledge Test 1:2 116, 206, 420, 422, 428Knowledge Test 1:1 116, 206, 262c, 420, 422,428Knowledge Test 1:1 262c, 428aKnowledge Test 1:1 428aKnowledge Test 1:1 428aKnowledge Test 1:1 428cPage 7 of 33