WZ - All India Radio
WZ - All India Radio
WZ - All India Radio
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
2.13.2Routine Test :-a) Measurement of Insulation Resistanceb) Measurements of Resistance of windingc) Oil dielectric strength test.d) Out put voltage teste) Measurement of No load loss & current,full load Loss & current.f) Measurement of Impedance voltage/shortcircuit impedanceg) Measurement of efficiency & regulationat various loads.2.13.3 Functional Test:-a) Test on different Tapping Positionsb) A heat run test (Temperature rise test)will be conducted at works ofmanufacturer in presence of client,without any charge.c) Any other test found necessary as perspecs and site conditions.2.13.4 Type Test:-Tenederer must process and produce type testcertificate for similar capacity/equipment. Iftype test certificate is not available then tenderershall have to conduct the following tests atManufacturer in the presence of indenter at theirown expenses:-a) Lightning Impulse Testb) Dynamic Short Circuit Test.SECTION - IIITECHNICAL PARAMETERS AND OTHER PARTICULARS TO BE SUPPLIED BY THE TENDERERS AGAINST AIR REQUIREMENTS AS GIVENBELOW.3.1 KVA RATING3.2 Rated Voltagea) H.V. windingb) L.V. windingDesktop/tenderxmer /750kva/AHMD/MUM//PANJIPage 48 of 64