13.07.2015 Views

DMC-FT20EE DMC-FT20EF DMC-FT20EG DMC ... - Panasonic

DMC-FT20EE DMC-FT20EF DMC-FT20EG DMC ... - Panasonic

DMC-FT20EE DMC-FT20EF DMC-FT20EG DMC ... - Panasonic

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Measuring condition (For <strong>DMC</strong>-FT20, <strong>DMC</strong>-TS20)*Attach "L" size of absorption pad.[Exhaust Air]5. Operate the measurement switch of the air-leak tester to exhaust air inside the product for 90 seconds.[Stand-by]6. After a laps of 15 seconds, take a note (Record) that the pressure value indicated on the indication panel.[Measurement]7. Confirm that the pressure value fluctuations during measurement process are within the testing specification.The air-leak test is now completed.3. Packing replacement record input:• To enter the repair record, it is necessary to use the "DIAS" software. The maintenance software "DIAS" is available at "TSNWebsite".To download, click on "Support Information from NWBG/VDBG-AVC".*DIAS (DSC Integrated Assist Software)31

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!