13.07.2015 Views

A Project Approach To Optimize Time and Cost - Petroleumclub.ro

A Project Approach To Optimize Time and Cost - Petroleumclub.ro

A Project Approach To Optimize Time and Cost - Petroleumclub.ro

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<st<strong>ro</strong>ng>P<strong>ro</strong>ject</st<strong>ro</strong>ng> Execution - Engineering– Design Specifications for field instruments <st<strong>ro</strong>ng>and</st<strong>ro</strong>ng> valves, analytical, field packages(metering systems, tank management systems, BMS, gantry automation, etc).– Foundation Fieldbus basic segment design– Asset Management System Specification– Specification of Machinery Health Monitoring systems– Define major third party interfaces <st<strong>ro</strong>ng>and</st<strong>ro</strong>ng> common communications st<st<strong>ro</strong>ng>and</st<strong>ro</strong>ng>ard– DeltaV & DeltaV SIS System architecture– Create/update I/O database <st<strong>ro</strong>ng>and</st<strong>ro</strong>ng> data exchange mechanism (INtools)– FDS of Cont<strong>ro</strong>l Application / Safety Application– Specification of advanced cont<strong>ro</strong>l applications– Hardware specification <st<strong>ro</strong>ng>and</st<strong>ro</strong>ng> Cont<strong>ro</strong>l loop design– Generation of C&E diagrams <st<strong>ro</strong>ng>and</st<strong>ro</strong>ng> Cont<strong>ro</strong>l narratives– Issue system HW + SW testing <st<strong>ro</strong>ng>and</st<strong>ro</strong>ng> integrated testing specifications– Operator Training System SpecificationSlide 17

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!