13.07.2015 Views

A Project Approach To Optimize Time and Cost - Petroleumclub.ro

A Project Approach To Optimize Time and Cost - Petroleumclub.ro

A Project Approach To Optimize Time and Cost - Petroleumclub.ro

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

MAC Contracting Measures• Steps Taken to Mitigate MAC Impacts to EPC ContractsUnder a Direct Contract:– Owner I&C Engineer assigned to manage the MAC/EPCinterfaces.– Detailed assignment of <strong>ro</strong>les <st<strong>ro</strong>ng>and</st<strong>ro</strong>ng> responsibilitiesestablished for the MAC <st<strong>ro</strong>ng>and</st<strong>ro</strong>ng> the EPC’s.– MAC personnel assigned to each EPC Team.– All field construction drawings are p<strong>ro</strong>duced by the EPC.– All field construction activities are assigned to the EPC’s.MAC only p<strong>ro</strong>vides assistance <st<strong>ro</strong>ng>and</st<strong>ro</strong>ng> support.– Commissioning <st<strong>ro</strong>ng>and</st<strong>ro</strong>ng> start-up are under EPC cont<strong>ro</strong>l.Slide 26

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!