13.07.2015 Views

A Project Approach To Optimize Time and Cost - Petroleumclub.ro

A Project Approach To Optimize Time and Cost - Petroleumclub.ro

A Project Approach To Optimize Time and Cost - Petroleumclub.ro

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

MAC Scope <st<strong>ro</strong>ng>and</st<strong>ro</strong>ng> Contract CompensationCompensationMAC ScopeTRAININGSTART-UPCONSTRUCTIONReimbursable Rates• Difficult to define total requirements <st<strong>ro</strong>ng>and</st<strong>ro</strong>ng>/or• Contractor not in cont<strong>ro</strong>l of schedule,sequence & highly dependent on othercontractor activitiesTrainingCommissioning &Startup SupportConstructionSupervisionDetailed Design& HardwareSupplyFEEDEngineeringDETAIL DESIGN&HARDWARESUPPLYLump Sum• P<strong>ro</strong>visional lump sum for major portion ofcontract• Contractors will bid on a “model” systemconfiguration as defined in ITT• “Model” app<strong>ro</strong>ach keeps all bidders on equal<st<strong>ro</strong>ng>and</st<strong>ro</strong>ng> competitive basis• “Model” will be adjusted to actual systemconfiguration at end of FEED; there will beadditions <st<strong>ro</strong>ng>and</st<strong>ro</strong>ng> deletions as technical definitionimp<strong>ro</strong>ves• Additions <st<strong>ro</strong>ng>and</st<strong>ro</strong>ng> deletions will be incorporatedinto lump sum based on firm-bid schedule ofrates <st<strong>ro</strong>ng>and</st<strong>ro</strong>ng> unit costsOperationsSupport(Lifecycle)FEEDReimbursable Rates• Difficult to define total requirements beforeFEED• MAC must work with multiple contractorswithout cont<strong>ro</strong>l over interfaces, responsetime, <st<strong>ro</strong>ng>and</st<strong>ro</strong>ng> changing requirementsSlide 25

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!