13.07.2015 Views

A Project Approach To Optimize Time and Cost - Petroleumclub.ro

A Project Approach To Optimize Time and Cost - Petroleumclub.ro

A Project Approach To Optimize Time and Cost - Petroleumclub.ro

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

MAC Contracting Options• MAC directly contracted by Owner, utilizing anoptimum combination of reimbursable <st<strong>ro</strong>ng>and</st<strong>ro</strong>ng> lumpsum compensations• MAC selected by Owner <st<strong>ro</strong>ng>and</st<strong>ro</strong>ng> sub-contracted bya single EPC for the entire p<strong>ro</strong>ject scope• MAC selected by Owner <st<strong>ro</strong>ng>and</st<strong>ro</strong>ng> sub-contractedseparately by each EPC ContractorSlide 22

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!