13.07.2015 Views

District of Saanich, Building and Plumbing Bylaw 8627

District of Saanich, Building and Plumbing Bylaw 8627

District of Saanich, Building and Plumbing Bylaw 8627

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Building</strong> <strong>and</strong> <strong>Plumbing</strong> <strong>Bylaw</strong>, 2005, No. <strong>8627</strong>3.4.4 A permit for a temporary building shall be posted on the building.SECTION 4 - ADDITIONAL REQUIREMENTSSUBSECTION 4.1 - BUILDING INSPECTION OR REVIEW4.1.1 Any registered pr<strong>of</strong>essional responsible for inspection or review <strong>of</strong> any portion <strong>of</strong> thework shall, upon request, make copies <strong>of</strong> all inspection or review reports available tothe Manager <strong>of</strong> Inspection Services.SUBSECTION 4.2 - INSPECTION AND TESTING OF PLUMBING SYSTEMS FORSTANDARD BUILDINGS4.2.1 Where a plumbing permit is required, the system shall not be put into use until it hasbeen reviewed <strong>and</strong> tested to the satisfaction <strong>of</strong> the Manager <strong>of</strong> Inspection Services.4.2.2 The plumbing contractor shall notify the Manager <strong>of</strong> Inspection Services when thework is complete <strong>and</strong> ready to be reviewed or tested.4.2.3 The plumbing contractor shall furnish any equipment, material, power or labour thatis necessary for inspection or testing.4.2.4 If any part <strong>of</strong> a plumbing system is covered before it has been reviewed <strong>and</strong>accepted by the Manager <strong>of</strong> Inspection Services, it shall be uncovered if theManager <strong>of</strong> Inspection Services so directs.4.2.5 If any part <strong>of</strong> a plumbing system is not accepted by the Manager <strong>of</strong> InspectionServices after it has been reviewed or tested, the owner or plumbing contractor shallmake any alteration or replacement that is necessary, <strong>and</strong> the work shall besubjected to further inspection or testing.4.2.6 The Manager <strong>of</strong> Inspection Services may inspect an existing plumbing system <strong>and</strong>,where there is reason to suspect that the system is not satisfactory, order it to betested.4.2.7 If any part <strong>of</strong> the system has become or is in a condition that it may becomedangerous or injurious to health, the owner shall make any alteration or replacementordered in writing by the Manager <strong>of</strong> Inspection Services.SUBSECTION 4.3 - MUNICIPAL REQUIREMENTS FOR PLUMBING SYSTEMS4.3.1 Except where an inspection chamber conforming to Schedule “H” <strong>of</strong> the “Subdivision<strong>Bylaw</strong> No. 7452" or any successor bylaw exists, every connection to a sanitaryPage 21 <strong>of</strong> 33

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!