13.07.2015 Views

District of Saanich, Building and Plumbing Bylaw 8627

District of Saanich, Building and Plumbing Bylaw 8627

District of Saanich, Building and Plumbing Bylaw 8627

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Building</strong> <strong>and</strong> <strong>Plumbing</strong> <strong>Bylaw</strong>, 2005, No. <strong>8627</strong>(b) after the forms for footings <strong>and</strong> foundations are complete, but prior toplacing <strong>of</strong> any concrete therein;(c) after removal <strong>of</strong> formwork from a concrete foundation <strong>and</strong> installation <strong>of</strong>perimeter drain tiles <strong>and</strong> damp-pro<strong>of</strong>ing, but prior to backfilling againstfoundation;(d) when framing <strong>and</strong> sheathing <strong>of</strong> the building is complete, including firestopping,bracing, chimney, duct work, plumbing, gas venting, wiring, butbefore any insulation, lath or other interior or exterior finish is applied whichwould conceal such work;(e) after insulation <strong>and</strong> vapour barrier has been installed <strong>and</strong> before any interiorwall finish is applied <strong>and</strong> after stucco wire has been attached <strong>and</strong> before thestucco has been applied;(f) before a building drain, sanitary or storm sewer is covered <strong>and</strong> if any part <strong>of</strong>plumbing system is covered before it is reviewed <strong>and</strong> approved, it shall beuncovered if the Manager <strong>of</strong> Inspection Services so directs <strong>and</strong> whenconsidered necessary, underground building drains, branches, storm drains<strong>and</strong> sewers shall be retested after the completion <strong>of</strong> all backfilling <strong>and</strong>grading by heavy equipment, all such works shall be carried out in thepresence <strong>of</strong> the Manager <strong>of</strong> Inspection Services;(g) after the building or portion there<strong>of</strong> is complete <strong>and</strong> ready for occupancy, butbefore occupancy takes place <strong>of</strong> the whole or a portion <strong>of</strong> the building;(h) in the case <strong>of</strong> a building demolition, after the completion <strong>of</strong> the demolition;<strong>and</strong>(i) in the case <strong>of</strong> a building deconstruction, after completion <strong>of</strong> thedeconstruction.(3) No aspect <strong>of</strong> the work referred to in Section 2.2.4 (2) <strong>of</strong> this bylaw shall beconcealed until the Manager <strong>of</strong> Inspection Services has accepted it in writing.(4) The requirements <strong>of</strong> Section 2.2.4 (2) <strong>of</strong> this bylaw do not apply to any aspect <strong>of</strong>the work that is the subject <strong>of</strong> a registered pr<strong>of</strong>essional’s Letter <strong>of</strong> Assuranceprovided in accordance with Section 3.2.3 (2).(5) Notwithst<strong>and</strong>ing 2.2.4 (1) <strong>of</strong> this bylaw, the Manager <strong>of</strong> Inspection Services mayattend the site from time to time during the course <strong>of</strong> construction to ascertainthat field reviews are taking place <strong>and</strong> to monitor field reviews undertaken by theregistered pr<strong>of</strong>essionals.Page 9 <strong>of</strong> 33

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!