13.07.2015 Views

Domestic Wastewater Treatment Mobilization Construction - AskTOP

Domestic Wastewater Treatment Mobilization Construction - AskTOP

Domestic Wastewater Treatment Mobilization Construction - AskTOP

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

EM 1110-3-17211 May 84A-5 . Activated sludge, plug flow aeration .a . Design requirements and criteria . Design an activated sludgeplant to treat 2 mgd of settled domestic wastewater, assuming thefollowing conditions :Raw wastewater BOD = 250 mg/lBOD removal in primary clarifier = 20 percentFinal effluent BOB = 20 mg/lb . Calculations and results . Design for 50 percent recycle . Therequired activated sludge removal efficiency is calculated as follows :E = Raw BOD x (1 - BOD removed in primary) - effluent BODRaw BOD x (1 - BOD removed in primary)= 2500 - 0 .2) - 20 = 0 .90250(1 - 0 .2)BOD applied = (0 .8) (250) = 200 mg/lConverting to pounds/day :2 x 200 x 8 .34 = 3,340 pounds/day appliedCheck detention time :From table 11-2 :BOD loading = 40 pounds/1,000 cubic feet tank/day,therefore,Tank Vol = 3,340 pounds/day _ = 83,500 cubic feet40 pounds/day/1,000 cubic feet(will provide 7 hour 30 minute aeration at average flow)624,580 gallons x 24 hours/day = 7 .4 hours - O.K .2 x 106 gallons/dayRequired depth = 12 feet SWD + 2 feet freeboardRequired width = 2 x SWD = 2x 12 = 24 feettherefore, Length = Vol = 83,500 = 290 feetWxD 12x24Total tank dimensions 290 feet by 24 feet by 14 feetFrom table 11-3 :A-11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!