EM 1110-3-172'll May 84Table 10-3 . Miscellaneous Trickling FilterComponent Design CriteriaFilter Component.UnderdrainsDesign RequirementThe underdrains will have a minimum slope of1 percent . Use the larger size openings forhigh rate filters .Drainage Channels Either central or peripheral drainagechannels will be used . The channels will bedesigned to provide 2 fps minimum velocity atthe average daily application rate to thefilter and so that no more than 50 percent oftheir cross-sectional area will be submerged- under the design hydraulic loading .Wind Break The windbreak will be constructed on the side(if utilized) of the prevailing winter wind. Its lengthwill be three filter diameters for eachfilter diameter it is located away from thefilter's near edge . Its height will be aminimum of 10 feet above the surface of thefilter, plus an additional 0 .1 times thefilter diameter for each filter diameter itis located away from the filter's near edge .Dome Cover Consult approved manufacturers .(if utilized)U . S . Army Corps of Engineers

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!