13.07.2015 Views

VENTURA 150 DELUXE INSTALLATION MANUAL

VENTURA 150 DELUXE INSTALLATION MANUAL

VENTURA 150 DELUXE INSTALLATION MANUAL

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

OperationDuring normal operation the red LED should be on. Power needs to be supplied to the Z-Brane unit for as long as you wish to have the bio-fouling and scale protection. We recommendthat your watermaker be flushed after each use not only to protect the membrane but toprevent corrosion in the feed water system. To achieve full effectiveness thoroughly freshwater flush the watermaker several times before leaving the vessel.The Z-Brane may be de-powered if the system is stored with chemicals or winterized withglycol.Power on LEDHigh VoltageconnectorDO NOT DISCONNECTOR SPLICE ANY OF THEHIGH VOLTAGE WIRING!Contact the factory ifmodifications are required.35

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!