River. The westernmost third of the site slopes steeply down toward the Potomac rail line alongthe northern property boundary. <strong>Site</strong> elevations range from <strong>10</strong>0 to 140-feet above mean sea level(amsl).FloodplainsInformation from Flood Insurance Rate Maps published by the National Flood InsuranceProgram, which is administered by the Federal Emergency Management Agency (FEMA), wasreviewed for the Subject <strong>Site</strong>. The western portion of the Subject <strong>Site</strong> is located adjacent to a<strong>10</strong>0-year flood zone; however, the site is not located within the <strong>10</strong>0-year flood zone (seeAppendix E).STANDARD <strong>ENVIRONMENTAL</strong> RECORD SOURCESFederal Regulatory Record SourcesCurrent U.S. EPA and tribal regulatory records were reviewed to assist in identifying potentialrecognized environmental conditions in connection with the Subject <strong>Site</strong> or nearby properties.Records were obtained through Environmental Data Resources, Incorporated (EDR). Thedatabase search was performed in accordance with ASTM for the following federal databases:• National Priorities List (NPL) and Proposed NPL sites;• Comprehensive Environmental Response, Compensation, and Liability InformationSystem Report (CERCLIS);• CERCLIS No Further Remedial Action Planned Report (CERCLIS-NFRAP);• Resource Conservation and Recovery information System (RCRIS) Treatment,Storage, and Disposal (TSD) Facilities Report, Large Quantity Generators (LQG)Report, and Small Quantity Generators (SQG) Report;• RCRIS TSDs subject to Corrective Action Report (CORRACTS);• Emergency Response Notification System (ERNS); and• Supplemental federal databases reported by EDR.The federal and tribal regulatory records search was performed in accordance with the ASTM E1527-05 standard (with respect to the databases searched and the search radii). A copy of theEDR report is included as Appendix D. The report provides additional detail on the searcheddatabases, database release dates, and the database listings. No tribal listings were identified inthe searched databases.<strong>Site</strong> <strong>10</strong> 8 Phase I ESA Report

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!