13.07.2015 Views

OSHPD Updates - CSHE

OSHPD Updates - CSHE

OSHPD Updates - CSHE

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Tip: Deferred submittals should be minimized to the extent possible to avoidconstruction delays.Stamping and signing of deferred approval documents must complywith the same requirements as for construction documents, as notedin Section 7-115, and in addition 7-126 of the California AdministrativeCode.c. Other InformationProvide other general compliance information as appropriate for theproject including, but not limited to:• Plumbing fixture counts for public, staff, and patients, inaccordance with the California Plumbing Code requirements• Project construction phasing of other work sequences thataffect the project operations or impact code compliance• Other work not included in the project and carried out underother permits if it affects the project• Local zoning conditions of approval related to the project• Parking counts, as needed for local acceptance and Title 24accessibility• A chemical inventory on small projects, if other than newconstruction and remodel projects that alter the existingstructural frame (formerly referred to as “H” projects), to showcompliance with number of control areas and maximumallowable quantities of hazardous materials as listed in CBCTables 307.1(1) and 307.1(2) (see <strong>OSHPD</strong> PIN 8 for requiredinformation and suggested format)Section 3. Plan Design and Review Page 37

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!