- Page 1: Rolling ShoresCommunityAssessment R
- Page 4 and 5: 1.0 Introduction1.1 BACKGROUNDThe C
- Page 7 and 8: 1.3 REPORT PURPOSEThis report is a
- Page 9: 2.0 Existing Conditions2.1 INTRODUC
- Page 13 and 14: Photo 1: Wastewater effluent surfac
- Page 15 and 16: 3.0 Alternatives Analysis3.1 INTROD
- Page 17 and 18: 3.2.2 Private ISTS ProgramIn a priv
- Page 19 and 20: ISTS rules dictate that systems tha
- Page 21 and 22: with CAR ID#13 is allowed to build
- Page 23 and 24: Table 4: Estimated Permitting Flow
- Page 25 and 26: etained at all individual propertie
- Page 27 and 28: • Lower operation and maintenance
- Page 29 and 30: 4.0 Cost Comparison of Alternatives
- Page 31 and 32: The replacement wastewater system A
- Page 33 and 34: asis, other considerations such as
- Page 35 and 36: analysis over a 25-year period show
- Page 37 and 38: 5.0 Summary and Recommendations5.1
- Page 39 and 40: • Chisago County would continue t
- Page 41 and 42: Project LocationRush Lake 7.5 Minut
- Page 43 and 44: 920940920920920920940930920920920!A
- Page 45: 13Note: CAR ID#13 will be a holding
- Page 48 and 49: Appendix ABackground Information
- Page 50 and 51: pores and channels. As a result the
- Page 52 and 53: The trench is the most common of th
- Page 54 and 55: DRAFT - 5/30/12Septic System Improv
- Page 56 and 57: CAR ID#Property Information Drainfi
- Page 58 and 59: 03.01358.15!>SB 1948.71503.01358.16
- Page 60 and 61:
!(03.01358.13!(!A!>SB 1939.30703.01
- Page 62 and 63:
!>!A03.01358.11!. !.03.01358.12!>SB
- Page 64 and 65:
03.00047.1003.00047.00!(SUMP OUT925
- Page 66 and 67:
03.01358.06!ACambridge Dr!>SB 1939.
- Page 68 and 69:
!A03.01358.04Cambridge Dr!A03.01358
- Page 70 and 71:
!(!>SB 1939.98903.01358.02!ASB 1940
- Page 72 and 73:
!>03.01358.18470th St!>SB 4935.649S
- Page 75 and 76:
Appendix DSoil Borings
- Page 77 and 78:
Date Completed:Completed By:Project
- Page 79 and 80:
Date Completed:Completed By:Project
- Page 81 and 82:
Date Completed:Completed By:Project
- Page 83 and 84:
Date Completed:Completed By:Project
- Page 85 and 86:
Date Completed:Completed By:Project
- Page 87 and 88:
Date Completed:Completed By:Project
- Page 89 and 90:
Date Completed:Completed By:Project
- Page 91 and 92:
Date Completed:Completed By:Project
- Page 93 and 94:
Date Completed:Completed By:Project
- Page 95 and 96:
Date Completed:Completed By:Project
- Page 97 and 98:
Date Completed:Completed By:Project
- Page 99 and 100:
Appendix EFlow Calculations
- Page 101 and 102:
LISTS Final Permitting FlowWorkshee
- Page 103 and 104:
MSTS Final Permitting FlowWorksheet
- Page 105 and 106:
ESTIMATED LISTS CLUSTER CAPITAL COS
- Page 107 and 108:
ESTIMATED CLUSTER MSTS CAPITAL COST
- Page 109 and 110:
OPERATION AND MAINTENANCE FOR CLUST
- Page 111 and 112:
Appendix GChisago County Letters
- Page 113 and 114:
Compliance Inspection FormExisting
- Page 115 and 116:
Property address: Cambridge Dr, Har
- Page 117 and 118:
Easement and property research find
- Page 119:
#210968• Signed June 27, 1988•