Community Assessment Report - Onsite Sewage Treatment ...
Community Assessment Report - Onsite Sewage Treatment ...
Community Assessment Report - Onsite Sewage Treatment ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
!A!>SB 1936.26503.01358.10!(!(!(SUMP OUTLET927.456!>SB 1935.70703.01358.11!A03.01358.12Soil Boring Date:___________Completed by:_____________Elevation:________________HorizonEndDepth Horizon NotesColor:___________________Texture:_________________Notes:_________________________________________Color:___________________Texture:_________________Notes:_________________________________________Color:___________________Texture:_________________Notes:_________________________________________Color:___________________Texture:_________________Notes:_________________________________________Color:___________________Texture:_________________Notes:_________________________________________Color:___________________Texture:_________________Notes:_________________________________________Property Address: 47210 CAMBRIDGE DR PID(S): 03.01358.11Engineers - ScientistsBusiness Professionalswww.wenck.comWenck1800 Pioneer Creek CenterMaple Plain, MN 55359-04291-800-472-223240 20 0 40Feet ±Potential Future ISTS Area !> Soil Boring(Not final and not forconstruction)!@ Drainfield!( Septic Tank!( Other!( Pump Tank!ADeep Well") Holding Tank!A Shallow WellWell SetbackNote: All points located near center of referenced objectExisting SSTS Type:_________________ Depth of sand in mound:___________________Depth to bottom of effluent dispersal area:_______________________ Elevation:____________Depth to seasonally saturated soils from soil boring:________________ Elevation:____________Existing Separation:_______________ Existing Tank Compliance (Compliant/Noncompliant)Dispersal/<strong>Treatment</strong> area compliance status: (ITPHS, Failure to protect groundwater, Compliant)Notes:_____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________For Wenck Data Tracking only, data in blue box does not relate to ISTS compliance.Setbacks met: (yes/no) Future:____________________________________________Setback not met from tanks to: Well___ Buildings (10’)___ Property Line (10’)___ OHW (75’):___Setback met from absorption area to: Well___ Buildings (20’)___ Property Line (10’)___ OHW (75’):___Path: L:\2797\01\mxd\Inspection Maps\03-01358-11 Blank Map.mxd