13.07.2015 Views

Community Assessment Report - Onsite Sewage Treatment ...

Community Assessment Report - Onsite Sewage Treatment ...

Community Assessment Report - Onsite Sewage Treatment ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

may have only a nominal $100 annual fee for maintenance, where as a holding tank system canrun into the thousands of dollars annually with full time occupancy. Alternative 2 and 3 O & Mcosts include the costs for the cluster mound systems and STEP collection system O & M (seeAppendix F) as well as the O & M for any properties on ISTS. Alternative 3 costs with nitrogenremoval technology included increase significantly over the cost of operation the MSTS withoutnitrogen removal technology.4.5 PRESENT WORTH ANALYSISAlternatives discussed in this report require different capital costs and operation and maintenancecosts. These options also realize the costs at different times during the life of the infrastructure.Certain options can require more infrastructure (capital) costs at the start of the project; whileother options experience higher maintenance costs throughout the life of the project. Also,infrastructure components have different expected life spans requiring replacement costs atvarying intervals. All of these variables can create misconceptions when trying to compare thecosts of one alternative versus another.A present worth analysis allows the direct comparison of alternatives by converting all futurecosts into present-day dollar amounts. Future expenditures including capital and operation andmaintenance are converted into present-day dollar amounts by using standard financialcalculations, an assumed time-frame for the expense to occur, and a discount rate. The timing forthe expenses was based on typical recurrences for maintenance and average life spans forinfrastructure. The discount rate is generally described as the difference between the availablerate of return on an investment and the average inflation rate. A discount rate of 4% was utilizedin this study in the conversion of future costs to a present worth. After converting future costsinto a present worth, these costs were added to initial capital costs and used in comparing thealternatives.Section 4.5 evaluated operation and maintenance costs of the alternatives, a present worthanalysis also takes inflation and debt service into account. Table 9 summarizes a present worthT:\2797-01 Chisago County\CAR\ROLLINGS SHORES CAR 090712.docx4-6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!