Rolling ShoresCommunityAssessment R
- Page 4 and 5:
1.0 Introduction1.1 BACKGROUNDThe C
- Page 7 and 8:
1.3 REPORT PURPOSEThis report is a
- Page 9 and 10:
2.0 Existing Conditions2.1 INTRODUC
- Page 11 and 12:
2.3 FINDINGSThe purpose of the site
- Page 13 and 14:
Photo 1: Wastewater effluent surfac
- Page 15 and 16:
3.0 Alternatives Analysis3.1 INTROD
- Page 17 and 18:
3.2.2 Private ISTS ProgramIn a priv
- Page 19 and 20:
ISTS rules dictate that systems tha
- Page 21 and 22:
with CAR ID#13 is allowed to build
- Page 23 and 24:
Table 4: Estimated Permitting Flow
- Page 25 and 26:
etained at all individual propertie
- Page 27 and 28:
• Lower operation and maintenance
- Page 29 and 30:
4.0 Cost Comparison of Alternatives
- Page 31 and 32:
The replacement wastewater system A
- Page 33 and 34:
asis, other considerations such as
- Page 35 and 36:
analysis over a 25-year period show
- Page 37 and 38:
5.0 Summary and Recommendations5.1
- Page 39 and 40:
• Chisago County would continue t
- Page 41 and 42:
Project LocationRush Lake 7.5 Minut
- Page 43 and 44:
920940920920920920940930920920920!A
- Page 45:
13Note: CAR ID#13 will be a holding
- Page 48 and 49:
Appendix ABackground Information
- Page 50 and 51:
pores and channels. As a result the
- Page 52 and 53:
The trench is the most common of th
- Page 54 and 55:
DRAFT - 5/30/12Septic System Improv
- Page 56 and 57:
CAR ID#Property Information Drainfi
- Page 58 and 59:
03.01358.15!>SB 1948.71503.01358.16
- Page 60 and 61: !(03.01358.13!(!A!>SB 1939.30703.01
- Page 62 and 63: !>!A03.01358.11!. !.03.01358.12!>SB
- Page 64 and 65: 03.00047.1003.00047.00!(SUMP OUT925
- Page 66 and 67: 03.01358.06!ACambridge Dr!>SB 1939.
- Page 68 and 69: !A03.01358.04Cambridge Dr!A03.01358
- Page 70 and 71: !(!>SB 1939.98903.01358.02!ASB 1940
- Page 72 and 73: !>03.01358.18470th St!>SB 4935.649S
- Page 75 and 76: Appendix DSoil Borings
- Page 77 and 78: Date Completed:Completed By:Project
- Page 79 and 80: Date Completed:Completed By:Project
- Page 81 and 82: Date Completed:Completed By:Project
- Page 83 and 84: Date Completed:Completed By:Project
- Page 85 and 86: Date Completed:Completed By:Project
- Page 87 and 88: Date Completed:Completed By:Project
- Page 89 and 90: Date Completed:Completed By:Project
- Page 91 and 92: Date Completed:Completed By:Project
- Page 93 and 94: Date Completed:Completed By:Project
- Page 95 and 96: Date Completed:Completed By:Project
- Page 97 and 98: Date Completed:Completed By:Project
- Page 99 and 100: Appendix EFlow Calculations
- Page 101 and 102: LISTS Final Permitting FlowWorkshee
- Page 103 and 104: MSTS Final Permitting FlowWorksheet
- Page 105 and 106: ESTIMATED LISTS CLUSTER CAPITAL COS
- Page 107 and 108: ESTIMATED CLUSTER MSTS CAPITAL COST
- Page 109: OPERATION AND MAINTENANCE FOR CLUST
- Page 113 and 114: Compliance Inspection FormExisting
- Page 115 and 116: Property address: Cambridge Dr, Har
- Page 117 and 118: Easement and property research find
- Page 119: #210968• Signed June 27, 1988•