13.07.2015 Views

Community Assessment Report - Onsite Sewage Treatment ...

Community Assessment Report - Onsite Sewage Treatment ...

Community Assessment Report - Onsite Sewage Treatment ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

03.01358.14!(!(!(SUMP OUTLET!A!>SB 1941.94403.01358.1503.01358.16Soil Boring Date:___________Completed by:_____________Elevation:________________HorizonEndDepth Horizon NotesColor:___________________Texture:_________________Notes:_________________________________________Color:___________________Texture:_________________Notes:_________________________________________Color:___________________Texture:_________________Notes:_________________________________________Color:___________________Texture:_________________Notes:_________________________________________Color:___________________Texture:_________________Notes:_________________________________________Color:___________________Texture:_________________Notes:_________________________________________Property !> Address: 47070 CAMBRIDGE DR PID(S): 03.01358.15Engineers - ScientistsBusiness Professionalswww.wenck.comWenck1800 Pioneer Creek CenterMaple Plain, MN 55359-04291-800-472-223240 20 0 40Feet ±Potential Future ISTS Area !> Soil Boring(Not final and not forconstruction)!@ Drainfield!. Mound!( Other!( Septic Tank!A Deep Well!( Pump Tank!A Shallow Well") Holding TankWell SetbackNote: All points located near center of referenced objectExisting SSTS Type:_________________ Depth of sand in mound:___________________Depth to bottom of effluent dispersal area:_______________________ Elevation:____________Depth to seasonally saturated soils from soil boring:________________ Elevation:____________Existing Separation:_______________ Existing Tank Compliance (Compliant/Noncompliant)Dispersal/<strong>Treatment</strong> area compliance status: (ITPHS, Failure to protect groundwater, Compliant)Notes:_____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________For Wenck Data Tracking only, data in blue box does not relate to ISTS compliance.Setbacks met: (yes/no) Future:____________________________________________Setback not met from tanks to: Well___ Buildings (10’)___ Property Line (10’)___ OHW (75’):___Setback met from absorption area to: Well___ Buildings (20’)___ Property Line (10’)___ OHW (75’):___Path: L:\2797\01\mxd\Inspection Maps\03-01358-15 Blank Map.mxd

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!