4. Components and Electrical Connections4.1 Power Connections, Splices, Tees, and End SealsAll power connections, splices, tees, and end seals in a <strong>Division</strong> 1 location must use the HAK-C-100connection kit, along with a <strong>Division</strong> 1 Nationally Recognized Testing Lab (NRTL) approved junction box,which must be ordered separately.Component matrixAdditional materials requiredNumber of Number of holes Junction boxConnection HAK-C-100 required on the catalog Mounting Pipetype kits required junction box number brackets strapsPower 1 2 HAK-JB2 1 1Splice 2 2 HAK-JB2 1 1Tee 3 3 HAK-JB3 1 1End seal 1 1 HAK-JB2 1 1HAK-JB2 (shown) and HAK-JB3 Junction Boxes.Two .25" dia. mounting holes4.81"4.25"insidedia.4.75"5.50"mountingC L6.13" O.A.2.81"5.23"O.A. (ref.)M100#2 66/6g(150 metric)box/cover threads3.5"dia. openingSealing gasket(standard)1.06"1.94"3.19"3.88".31" typ. 1.75"(2) 3/4-14 NPTconduit hubsNote:• HAK-JB2 and HAK-JB3 junction boxes include an approved hole plug. Kit connections are 3/4" NPT.• Any NRTL listed junction box suitable <strong>for</strong> a hazardous area may be used. However, some junctionboxes may not be compatible with the Raychem universal mounting bracket.15

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!