13.07.2015 Views

Heat-Tracing Systems for Hazardous Division 1 Locations

Heat-Tracing Systems for Hazardous Division 1 Locations

Heat-Tracing Systems for Hazardous Division 1 Locations

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

5.6 HAK-C-100 Connection Kit Installation1. Fasten universal mounting bracket (UMB) on pipe, using appropriate size stainless steel pipe strap,or fabricate and locate suitable mounting plate <strong>for</strong> junction box within 24 inches of desiredconnection on pipe.Threaded inserts2. Thread compression gland half with threaded inserts into end of sealing fitting nearest verticalplug. Disassemble union. Thread female half of union onto nipple. Thread nipple into other end ofsealing fitting nearest angled plug.3. Thread male half of union into box entry. Assemble union halves together. Mount box on bracket.27

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!