13.07.2015 Views

Wind Energy Feasibility Study - Town Of Orleans

Wind Energy Feasibility Study - Town Of Orleans

Wind Energy Feasibility Study - Town Of Orleans

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

4.6 Interconnection ( For reference only)The interconnection between wind turbines and step up transformers is an undergroundcabling system will be as per the local code requirements and utility interconnectionrequirements for Induction generators.4.7 Tower FacilitiesOne standard 10A 220V general-purpose single phase electric outlet is installed in the base ofthe tower, in close proximity to the main internal light switch. The main internal light switchoperates all lights within the tower. Lights are installed to provide adequate lighting in allareas within the wind turbine tower, at the base and at the top.One standard 10A 220V general-purpose single-phase electric outlet is provided in thenacelle.17

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!