13.07.2015 Views

ERRAC PROPOSALS FOR THE 3RD CALL OF FP7 - ACRI

ERRAC PROPOSALS FOR THE 3RD CALL OF FP7 - ACRI

ERRAC PROPOSALS FOR THE 3RD CALL OF FP7 - ACRI

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

European Rail Research Advisory CouncilCommon data protocols for end applications or end devices Review existing application profiles, operational requirements and use cases and analyzetheir potential for migration towards harmonized functional interface specifications (FIS) fortrue interoperability of end devices to avoid obsolescence problems Develop FIS for end applications like brake control, door control or propulsion control etc. validate FIS in a simulation environment (laboratory tests) Disseminate the FIS for further processing in industry specifications7. Headline‣ Standardisation of conventional signalling systems to accelerate a EuropeanETCS rollout.Funding scheme: Large scale collaborative project – Level 2Estimation of requested EC funding: 5 million EUR..Short descriptionThe aim of the research will be to develop formal specifications and test cases for conventionalsignalling systems in line with the relevant European norms to facilitate the introduction of ETCSsystems. The project will build on experiences gained within ETCS projects and the results ofexisting research work where the methodical basis as well as functional requirements has beenestablished. It will lead to standardisation processes involving national and Europeanstandardisation bodies as well as national safety authorities.Activities will include:1. The formal definition of static and dynamic requirements of signalling systems withagreement between railways and signalling suppliers on a common allocation of functions tosub-systems and/or to adjacent systems such as traffic management systems or radio blockcentres.2. Development of test cases for conventional signalling systems which are in line with the testcases for the ETCS equipment and a concept for building a test centre to support Europeanlegislation with respect to e.g. EG 352/2009, EG/57/2008, etc.3. Implementation of standard interfaces in a real demonstration project to validate thespecification.<strong>ERRAC</strong> Project ManagementDennis Schut – UIC<strong>ERRAC</strong> SecretariatGiorgio Travaini - UNIFEwww.errac.org<strong>ERRAC</strong> ChairmanMr Andrew Mc NaughtonNetwork Rail<strong>ERRAC</strong> Vice-ChairmanMr Dan OttebornBombardier Transportation<strong>ERRAC</strong> Vice-ChairmanProf. Manuel S. PereiraTechnical University of Lisbon

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!