13.07.2015 Views

Forest Management Certification Assessment Report for - Rainforest ...

Forest Management Certification Assessment Report for - Rainforest ...

Forest Management Certification Assessment Report for - Rainforest ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CAR #: 11/06 Reference Standard #: 5.3.1Non-con<strong>for</strong>mance: Description of non-con<strong>for</strong>mance: Tembec’s log quality parameters resultMajor Minor in useable logs that meet MOFR merchantability and utilizationstandards being wasted and left on site and in burn piles, beyond therequirements <strong>for</strong> coarse woody debris. This is not in compliance with theindicator requirement to minimize waste.Corrective Action Request:Tembec shall identify and implement measures to reduce the amount of wood meeting MOFRutilization standards, and not prescribed in site plans to be left to accommodate other ecologicalvalues, that is left on site and in burn piles as waste.Timeline <strong>for</strong> Con<strong>for</strong>mance: By the end of Year 1 of certification.CAR #: 12/06 Reference Standard #: 5.6.1Non-con<strong>for</strong>mance: Description of non-con<strong>for</strong>mance: Tembec’s current timber supplyMajor Minor analyses and AAC determinations are not specific to its operating areasand do not account <strong>for</strong> Tembec’s management activities to meet FSCrequirements and the provisions of their SFMP, and thus, do not meet therequirements of the Indicator.Corrective Action Request:Tembec shall complete an analysis of the timber supply specifically <strong>for</strong> its operating areas inthe Kootenay Lake TSA and Cranbrook TSA. These analyses shall reflect the <strong>for</strong>est inventoryspecific to the area, and project a sustainable level of harvest from the area that is consistentwith implementing the land base reductions, management strategies and operational practicesthat are set out in Tembec’s SFMP.Timeline <strong>for</strong> Con<strong>for</strong>mance: By the end of Year 2 of certification.CAR #: 13/06 Reference Standard #: 6.3.4Non-con<strong>for</strong>mance: Description of non-con<strong>for</strong>mance: Tembec cannot demonstrate at this timeMajor Minor that the habitat requirements <strong>for</strong> early seral dependant species are notcompromised by stand management activities, or that the amount of earlyseral habitat is compatible with natural disturbance regimes.Corrective Action Request:Tembec shall develop and implement a specific strategy to ensure that Tembec’s <strong>for</strong>estmanagement creates and maintains non-tree-dominated early seral stages in a manner that iscompatible with natural disturbance regimes and meets the needs of early-seral-dependentspecies.Timeline <strong>for</strong> Con<strong>for</strong>mance: By the end of Year 2 of certification.Page 43 of 89

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!