13.07.2015 Views

Forest Management Certification Assessment Report for - Rainforest ...

Forest Management Certification Assessment Report for - Rainforest ...

Forest Management Certification Assessment Report for - Rainforest ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

minimum 7 m machine-free zone along all streams, lakes and wetlands, except where required<strong>for</strong> construction of crossings or other approved infrastructure.Timeline <strong>for</strong> Con<strong>for</strong>mance: By the end of Year 1 of certificationCAR #: 17/06 Reference Standard #: 6.5.7Non-con<strong>for</strong>mance: Description of non-con<strong>for</strong>mance: The team observed diversions of theMajor Minor natural flow of surface water and resulting road and ditch erosion in anumber of locations. This erosion appeared to be a result of inadequateroad maintenance and a lack of seasonal deactivation following logging.This surface erosion along roads that are not active haul roads is “apotential sediment source” as described by the indicator and thus, a noncon<strong>for</strong>mance.Corrective Action Request:Tembec shall have completed an assessment of roads in its operating areas, identified priorityareas <strong>for</strong> seasonal deactivation to reduce road surface erosion, and implemented measures toreduce surface erosion from road surfaces and ditchlines.Timeline <strong>for</strong> Con<strong>for</strong>mance: By the end of Year 1 of certification.CAR #: 18/06 Reference Standard #: 6.5.8Non-con<strong>for</strong>mance: Description of non-con<strong>for</strong>mance: Tembec does not have a summary ofMajor Minor the ECA status in each of their active watersheds. Without thisin<strong>for</strong>mation neither Tembec, nor the assessment team, nor the public canbe sure that ECAs are maintained at less than 25%, or at levelsrecommended otherwise by a hydrological assessment as required by theindicator. Pre-condition 1/06 is imposed to require ECA summaries <strong>for</strong>all watersheds with current operations or operations planned in 2007 andto identify measures to be taken in any watersheds that exceed 25%ECA, prior to certification. CAR 18/06 requires updating of theremaining ECA summaries <strong>for</strong> watersheds in both operating areas.Corrective Action Request:Tembec shall have updated the ECA status reports <strong>for</strong> all the watersheds within its operatingareas in Kootenay Lake and Cranbrook TSA.Timeline <strong>for</strong> Con<strong>for</strong>mance: By the end of Year 1 of certification.Page 86 of 89

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!