13.07.2015 Views

VSMP-General-Permit - City of Hopewell, Virginia

VSMP-General-Permit - City of Hopewell, Virginia

VSMP-General-Permit - City of Hopewell, Virginia

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

fighting activities are excluded from the effective prohibitionagainst non-storm water and need only be addressed wherethey are identified as significant sources <strong>of</strong> pollutants to waters <strong>of</strong>the United States.(iv). Guidance: EPA recommends that the plan to detect andaddress illicit discharges include the following four components:procedures for locating priority areas likely to have illicitdischarges; procedures for tracing the source <strong>of</strong> an illicitdischarge; procedures for removing the source <strong>of</strong> thedischarge; and procedures for program evaluation andassessment. EPA recommends visually screening outfalls duringdry weather and conducting field tests <strong>of</strong> selected pollutants aspart <strong>of</strong> the procedures for locating priority areas. Illicit dischargeeducation actions may include drain stenciling, a program topromote, publicize, and facilitate public reporting <strong>of</strong> illicitconnections or discharges, and distribution <strong>of</strong> outreachmaterials.Minimum Control Measure: Illicit Discharge Detection and EliminationSection II.B.3b.1. –Development <strong>of</strong> a Storm Sewer System MapIncluded in this application for MS4 permit is a copy <strong>of</strong> a storm water mapshowing the major outfalls and identifying the body <strong>of</strong> water where thedischarge occurs. This submittal is somewhat <strong>of</strong> a “hurdle” for us but weintend to continue refining the mapping <strong>of</strong> the storm water system toinclude not only the outfalls but eventually the entire drainage system.Schedule and Evaluation: We plan to complete the total system mappingby the PY third annual report due date.Responsible Party: The <strong>City</strong> Engineer working in concert with the GISManager and consultants are responsible to complete updates to themapping our storm water system.Necessary Documents: Copies <strong>of</strong> the map. Attachments: GIS Mapping“B”/ “C” / & “D” show key storm water items related to this plan.Measurable goals: For this application submission, a copy <strong>of</strong> the outfallmap. During future annual reports an update will be submitted detailingour current progress.23

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!