13.07.2015 Views

VSMP-General-Permit - City of Hopewell, Virginia

VSMP-General-Permit - City of Hopewell, Virginia

VSMP-General-Permit - City of Hopewell, Virginia

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Necessary Documents: Minutes from the Planning Commission andCouncil meetings.Measurable goals: N/A.Items to be reported in the Annual Report: N/A.Modifications per required Admin Update: TSDMinimum Control Measure: Construction Site Storm Run<strong>of</strong>fSection II.B.4.b.6– Site Inspection and Enforcement:<strong>Hopewell</strong>’s Construction Inspector works directly for the <strong>City</strong> Engineer andis an integral part <strong>of</strong> the construction inspection process including landdisturbing activities. Our DPW <strong>Permit</strong>s Construction Inspector is certified asa DCR Erosion and Sediment Control Inspector (certification #877). Hiscertification expires in 2010. He will renew his certification status throughthe online process and thereby maintain current certification status.<strong>Hopewell</strong> has several options available to ensure compliance and takeenforcement action for non-compliance such as Planning Commission,<strong>City</strong> Planner, and <strong>City</strong> Engineer review and approval. We can withholdbuilding permits and/or not issue certificates <strong>of</strong> occupancy, placed claimagainst project bonds, and take legal action, if necessary.Schedule and Evaluation: Construction plans are reviewed and requiredto have appropriate notes posted on them that adequately detail DCRErosion and Sediment Control requirements for the type <strong>of</strong> land disturbingactivity involved.Responsible Party: The <strong>City</strong> Engineer, the <strong>City</strong> Planner, and theConstruction InspectorNecessary Documents: A copy <strong>of</strong> DCR Erosion and Sediment ControlManual (green book) and the Construction Inspector’s certification. Inaddition please refer to the A-Series attachments to this permit programplan which is a more comprehensive summary <strong>of</strong> the <strong>City</strong> performanceplan. The same attachments are readily available as a source <strong>of</strong> publicinformation. They can be obtained at the permitting <strong>of</strong>fices <strong>of</strong> The <strong>City</strong>Engineer and Director <strong>of</strong> Development31

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!