Each performance plan year DPW Forces will conduct and complete,random inspections on a minimum <strong>of</strong> 20% <strong>of</strong> the TMDL locations in the <strong>City</strong>{see attachment “C”}Items to be reported in the Annual ReportIn regards to BMP’s, private ponds, other impoundments listed{attachment “B”}, identified TMDL outfall locations {attachment “C”} , andactive land disturbance permits {Attachment “E”} , each year the <strong>City</strong> willprovide:1) the number <strong>of</strong> inspections conducted, and2) results <strong>of</strong> those inspections, and3) updated reporting layers on the GIS Mapping GuidanceModifications per required Admin Update: TSDMinimum Control Measure: Post-construction Stormwater Management inNew Development and RedevelopmentSection II.B.5.b.2 – Ordinance to address post-construction run<strong>of</strong>f:<strong>City</strong> <strong>of</strong> <strong>Hopewell</strong> Ordinance (14-28) requires that the standards andformat <strong>of</strong> Chapter 3 <strong>of</strong> the current edition <strong>of</strong> the <strong>Virginia</strong> Erosion andSediment Control Handbook be used to control erosion.The <strong>City</strong> Engineer requires A&E firms to place Erosion and SedimentControl notes than basically placed the language from <strong>Virginia</strong> SedimentControl requirements onto construction drawings prior to his planapproval.Schedule and Evaluation: Approved construction plans are required tohave the appropriate E&S notes on the drawings.Responsible Party: The <strong>City</strong> Engineer and the <strong>City</strong> Planner.Necessary Documents: Approved construction plans since February 1,2007.Measurable goals: Plans approved with the appropriate E&S notes.Items to be reported in the Annual Report: N/A35

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!