VSMP-General-Permit - City of Hopewell, Virginia
VSMP-General-Permit - City of Hopewell, Virginia
VSMP-General-Permit - City of Hopewell, Virginia
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
The Department <strong>of</strong> Public Works through the <strong>City</strong> Engineers <strong>of</strong>fice,administers to a Land Disturbance <strong>Permit</strong>ting (LDP) program that closely orexactly mirrors the E & S Green Handbook guidelines set forth by DCR. The<strong>City</strong> Engineer and <strong>City</strong> Planner have completed the DCR PlanReviewer/Program Administrator certifications. The design review &permitting inspection programs are both audited annually by the localDCR authorities. Based on the February 2009 audit, the <strong>City</strong> had notedareas to improve on and was deemed inconsistent. A corrective actionplan was filed. The program administration adjustments were made. The<strong>City</strong> was notified by DCR in May <strong>of</strong> 2010 that the latest audit found the<strong>City</strong> to be fully consistent in all grading categories.The DPW <strong>Permit</strong>ting E & S program inspector has remained DCR certifiedand just recently was recertifiedThe DPW <strong>Permit</strong> Inspector, under the supervision <strong>of</strong> the <strong>City</strong> Engineer,carries out weekly site inspections on all ongoing and outstanding LDPprojects. Within 48 hours <strong>of</strong> a significant weather event the same DPW<strong>Permit</strong> Inspector performs a site inspection / assessment on all ongoingLDP projects.The DPW <strong>Permit</strong> Inspector keeps a chronological diary log book on all theactive and incomplete non-active LDP projects.The DPW <strong>Permit</strong> Inspector communicates the inspection assessment andall noted corrections to the Responsible Land Disturber (RDL). The <strong>Permit</strong>Inspector’s written report is provided on the <strong>of</strong>ficial DPW <strong>City</strong> <strong>of</strong> <strong>Hopewell</strong>Inspection Form, which is a mirror image <strong>of</strong> the Sample DCR form. The<strong>of</strong>ficial inspection form outlines the needed corrections, addresses thetime or urgency the corrections need to be performed, andconsequences if not.All <strong>of</strong> the above inspection LDP documentation is kept in the DPW <strong>Permit</strong>inspectors log book, which remains ready for review by DCR <strong>of</strong>ficialswhenever requested.Minimum Control Measure: Illicit Discharge Detection and EliminationSection II B.3b.4.- Prevent or minimize to the maximum extent practicable,the discharge <strong>of</strong> hazardous substances or oil in the storm waterdischarges(s) from the regulated small MS4.25