13.07.2015 Views

VSMP-General-Permit - City of Hopewell, Virginia

VSMP-General-Permit - City of Hopewell, Virginia

VSMP-General-Permit - City of Hopewell, Virginia

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Minimum Control Measure: Construction Site Storm Run<strong>of</strong>fSection II.B.4.b.3 – Construction site operators to control waste such asdiscarded building materials, concrete truck washout, chemicals, litter,and sanitary waste at the construction site that may cause adverseimpacts to water qualitySince the reorganization <strong>of</strong> the Engineering Section, transferring fromDevelopment to Public Works and the recent hiring <strong>of</strong> the <strong>City</strong> Engineermajor improvements were realized with regard to E&S control and othergeotechnical concerns. We will ensure that site operators control <strong>of</strong>construction waste such as discarded building materials, concrete truckwashout, chemicals, litter, and sanitary waste are covered either byappropriate drawing notes and/or checklist items attached to eachbuilding permit.Schedule and Evaluation: Made part <strong>of</strong> the construction documents assoon as established.Responsible Party: The <strong>City</strong> Engineer.Necessary Documents: Checklist items or notes added to constructiondrawings. The <strong>City</strong> Engineer’s <strong>of</strong>fice reviews plans and permit submissions.Each permit has attached the review and inspection checklist whichaddresses the site operator’s conformance inspection items {seeattachment AE for the sample form}Measurable goals: These types <strong>of</strong> issues quit showing up out on the jobsite.Items to be reported in the Annual Report: Prior to PY1 annual report notesand/or checklist included in the first annual report and afterwards ifneeded.Modifications per required Admin Update: TSDMinimum Control Measure: Construction Site Storm Run<strong>of</strong>fSection II.B.4.b.4 –Site plan review:29

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!