13.07.2015 Views

VSMP-General-Permit - City of Hopewell, Virginia

VSMP-General-Permit - City of Hopewell, Virginia

VSMP-General-Permit - City of Hopewell, Virginia

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

(B) Requirements for construction site operators to implementappropriate erosion and sediment control best managementpractices;(C) Requirements for construction site operators to control waste suchas discarded building materials, concrete truck washout,chemicals, litter, and sanitary waste at the construction site thatmay cause adverse impacts to water quality;(D) Procedures for site plan review which incorporate consideration <strong>of</strong>potential water quality impacts;(E) Procedures for receipt and consideration <strong>of</strong> information submittedby the public, and(F) Procedures for site inspection and enforcement <strong>of</strong> controlmeasures.(iii) Guidance: Examples <strong>of</strong> sanctions to ensure compliance includenon-monetary penalties, fines, bonding requirements and/orpermit denials for non-compliance. EPA recommends thatprocedures for site plan review include the review <strong>of</strong> individualpreconstruction site plans to ensure consistency with localsediment and erosion control requirements. Procedures for siteinspections and enforcement <strong>of</strong> control measures could includesteps to identify priority sites for inspection and enforcementbased on the nature <strong>of</strong> the construction activity, topography,and the characteristics <strong>of</strong> soils and receiving water quality. Youare encouraged to provide appropriate educational andtraining measures for construction site operators. You may wishto require a stormwater pollution prevention plan forconstruction sites within your jurisdiction that discharge into yoursystem.Minimum Control Measure: Construction Site Storm Run<strong>of</strong>fSection II.B.4.b.1 – Erosion and Sediment Control Ordinance<strong>City</strong> <strong>of</strong> <strong>Hopewell</strong> Ordinance (Section14) requires that the standards andformat <strong>of</strong> Chapter 3 <strong>of</strong> the current edition <strong>of</strong> the <strong>Virginia</strong> Erosion andSediment Control Handbook be used to control erosion.The <strong>City</strong> Engineer requires A&E firms to place Erosion and SedimentControl notes than basically placed the language from <strong>Virginia</strong> SedimentControl requirements onto construction drawings prior to his planapproval.27

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!