21.07.2015 Views

M/s. Agrawal Minerals, Vill - Kharkena, Dist. - Bilaspur ... - Seiaacg.org

M/s. Agrawal Minerals, Vill - Kharkena, Dist. - Bilaspur ... - Seiaacg.org

M/s. Agrawal Minerals, Vill - Kharkena, Dist. - Bilaspur ... - Seiaacg.org

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

(x)(xi)(xii)(xiii)(xiv)(xv)Project proponent shall take effective steps for safe disposal of solid wastesand sludge. Project proponent shall obtain authorization from Board formanagement and handiing of hazardous materials as per Hazardous wastes(Management, Handiing and Transboundary Movement) Rules, 2008.Ail the internal roads shail be made pucca before commissioning of theplant. The project proponent shall adopt good house keeping practices.Froject proponent shall take proper action to control the noise pollution.Project proponent shall insiall appropriate noise barriers lcontrol measuresincluding acoustic hoods, silencers, enclosures etc. on all sources of noisegeneration to control the noise. Earplugs/ear muffs etc. shall be provided tothe employee working in the area of generator halls and other high noiseareas. Leq of /noise levels emanating from turbines shall be limited to 75 dB(A). The noise level shall not exceed the limits 75 dB (A) during the day{imeand 70 dB (A) during the night-time within the factory premises. Projectproponent shall take adequate measures for control of noise level below 85dB (A) in the work environment. Workers engaged in noisy areas such asturbine area, air compressors etc. shall be periodically examined to maintainaudiometric record and for treatment for any hearing loss including rotatingthem to non-noisy/ less noisy areas.Project proponent shall provide appropriate arrangements to avoid airpollution, water pollution, noise pollution etc. during construction phase andduring transportation of plants/machineries/equipments/constructionmaterials etc. to the propose site. For controlling fugitive dust duringtransportation and construction works, regular sprinkling of water in villageroads'and other vulnerable areas of the plant shall also be ensured. Theemission from vehicles engaged for transportation of plants/machineries/equipments/construction materials etc. to the site shall be ensured withinprescribed vehicle emission norms. First aid and sanitation anangementsshall be made for the,drivers and other contract workers during constructionphase.The construction of effluent treatment plant and installation of air pollutioncontrol equipments shall be taken up simultaneously with othercivil/mechanical works at the propose site. The progress of the activitiesrelated to the project shall be submitted periodically to ChhattisgarhEnvironment Conservation Board, Raipur, Regional Office, ChhattisgarhEnvironment Conservation Board, <strong>Bilaspur</strong>, SEIAA, Chhattisgarh andRegional Office, Ministry of Environment & Forests, Govemment of lndia,Bhopal.Project proponent shall provide adequate number of influent and effluentquality monitoring stations/points in consultation with ChhattisgarhEnvironment Conservation Board. Regular monitoring shall be canied outfor relevant parameters. Regular monitoring of surface and ground waterquality including heavy metals (l-lg, Cr, As, Pb) shall be undertaken aroundproject area to ascertain the change in the water quality, il any, due toleaching of contaminants from disposal arealproject area. Result and datacollected shall be analyzed to ascertain the status of water quali$ andfindings shall be submitted. Continuous monitoring of ground watet level andIV/14-

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!