21.07.2015 Views

APPENDIX – I (See paragraph – 6) FORM 1 (I) Basic ... - Seiaacg.org

APPENDIX – I (See paragraph – 6) FORM 1 (I) Basic ... - Seiaacg.org

APPENDIX – I (See paragraph – 6) FORM 1 (I) Basic ... - Seiaacg.org

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Charge/delay,Detonators type/ DF,etc, powder factor etcj. Blast practice specifyingprecautions against env. Impacts(noise, ground vibration, fly rock etc)k. Brief description of loadingoperation1. Brief description oftransportation operationm. Brief description ofCrushing/Cutting polishing or anyother processing proposed to becarried out in the lease area its likelyenv impact and mitigation measuresBlasting will be carried out in an accurate andsystematic manner and will not be done inun-favoured weather. Blasting will be welldesigned and will be carried out periodicallyand also will be planned to minimizeboulders.Loading and unloading will be donemanually.The transport of the material bytractors/dumpers.Dust suppression will be done by sprinklingof water.Persons working just close to machines willbe provided with ear plugs/ear muffs forfurther protection.6. Scheme for plantation of trees.Sr.noa. Number of existing trees inthe lease areab. Number of trees likely to beuprootedc. Trees to be grown year wise(location should be shown onthe map)NilNil5 Trees Per Year, on whole periphery ofowned land or lease area.7. Scheme for progressive reclamation and rehabilitation of the landdisturbed.a. Depth of the top soil Exposed Rocks With averagedepth of 150 mm.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!