21.07.2015 Views

M/s. Orient Ispat Private Limited, Tedesara, Dist ... - Seiaacg.org

M/s. Orient Ispat Private Limited, Tedesara, Dist ... - Seiaacg.org

M/s. Orient Ispat Private Limited, Tedesara, Dist ... - Seiaacg.org

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

9. Regular monitoring of ground level concentration of SO2, NOx, SpM and RSpM(PM10, PM2.5) at at-least four stations shall be carried out in the impact zoneand records nraintained. lf at any stage these levels are found to exceecl theprescribed limits, the plant shall cease all operations till necessary controlmeasures are provided. The location of the monitoring stations and frequency ofmonitoring shall be decided in eonsultation with bhfrattisgarh EnvironmentConservation Board Raipur. The data so collected shall be properly analyzedand periodic reports shall be submitted to Chhattisgarh EhvironmentConservation Board, Raipur, Regional Office, Chhattisgarh EnvironmentConservation Board, Durg-Bhilai, SEIAA, Chhattisgarh and Regional Office,Ministry of Environment & Forests, Government of lndia, Bhopal.10. Project authority shall install separate electric rnetering arrangements with timetotalizer and interlocking arrangement for the running of poilution controldevices. These arrangements shall be made in such a fashion that any nonfunctioningof pollution control device/devices shall immediately stop the electricsupply to the fuel/raw materials supply system and shall remain tripped till thepollution control device/devices are made functional againirectified to achievethe desired efficiency'11. Project authority shall utilize the fly ash bricks/blocks etc. in all constructionactivities.12. Project authority shall take effective steps for safe disposal of solid wastes andsludge. Furnace slag shall be crushed and passed through magnetic separatorto recover the metallic contents and the same shall be utilized as raw material insteel making. Non-metallic contents shall be used in back filling and roadconstruction within plant premises. End cutting from existing rolling mill shall beused as raw material in own induction furnaces for steel making. lron content inthe slag shall be separated before use for low-lying areas filling and roadconstruction only after passing through toxic chemiial leachability potential(TCLP) test. Oily sludge shall be sold to authorized recyclers / re-processors forproper disposal through incineration. Project authority shall obtain authorizailonfrom Board for management and handling of hazardous materials as perHazardous Wastes (Management, Handling and Tran boundary Movement)Rules, 2008.13. All the internal roads shall be made pucca shortly. project authority shall adoptgood house keeping practices.14. Project authority shall take proper action to control the noise pollution. projectauthority shall install appropriate noise barriers /control measures includingacoustic hoods, silencers, enclosures etc. on all sources of noise generation tocontrol the noise. Earplugs/ear muffs etc. shall be provided to the employeeworking in the high noise areas. Leq of /noise levels emanating from machinesshall be limited to 75 dBA. The noise level shall not exceed the limits 75 dB (A)during the daytime and 70 dB (A) during the night time within the factorypremises. Project authority shall take adequate rneasures for control of noiselevel below 85 dB (A) in the work environment. Workers engaged in noisy areasshall be periodically examined to maintain audiometric record and for treatmentfor any hearing loss including rotating them to non-noisy/ less noisy areas.15. Project authority shall provide appropriate arrangements to avoicl air pollution,water pollution, noise pollution etc. during construction phase and duringtransportation of plants/machineries/equipments/ construction materials etc. tothe site For controlling fugitive dust during transportation and constructionworks, regular sprinkling of water in village roads ancj other vulnerable areas ofIV'€il

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!