excavator/ioacter, tractor anC tripper woulcl be ernployecl for rnlning operalions'Water sprinkling on the haul. i-oad by tanker rnounteci on truck for dt-tst suppres:''ionwould be ensr.ired. During clrilling opei'ai.ion water urill be u:;ed iis flushing agent toreduce blowing of stone p"o*cut iritn .ir. 6500 trees wcuid be pianted in 3 ha area incoming five years. Garlancj drains ano ciieck dams uvculd be consiructed to pretretttsoil er"osicn during rainy season. 13lasiing would be resoi'teil in controlled Frannei'torit,gut" noise po]lutron. Tne person erirployed in drilling cperatian woi!! be wef;eqrippeo with ear plugs, glasses & glgrres. Totai cost cf the project is Rs' 50 lakhs'There are n0 National Parks. wilcl Life sanctuaries and BirclSanctuaries, Protected A.reas under the Wild Life (Pr:otection) Act, 1972, notifiedEco-Sensitive Area, critically Polluted Area as identified by cPCB, lnter-state borderwithin 10 km. As per upprould Mining Plan, no forest land is invoived in the acquiredsiie.The case was considered in the 4th,8th,gtn, 12th and 14lh meeting of5EAC, Chhattisgarh held on 03/05/2008, 30/0612008, 31/0712008, 1210912QO8 and23leglZAOB respectively. Project authority made the presentation befoi"e SEAC'Chhattisgarn in'Ath r"*ting on SOlOOiZggti. SEAC, Chhattisgarh in the 14th meetingheld on Isloglzooa decided to restrict the mining to 5000 tonnes per annum as perthe approved Progressive <strong>Mine</strong> Closure ptan. SgAC, Chhattisgarh considered thismining' activity as category '82' without requiring EIA and public hearing andrecommended for grani oi Environmental Clearance in 11'n meeting held on)lloijlioOe.-r'ro pun'iic consuttation/pubtic hearing is required as per para 7 (i) lllstage (3) (e)'Theproposal and recommendation of state Level Expert AppraisalCommittee, Chhattisgarh was considered in the 6th, Btn, gth and 10th meeting ofsEIAA, Chhattisgarh held on 03/1212008, rcrcUz}Og, 271a4120a9 and 2210912009*rp".iiu.ry. rne"SftAA, Chhattisgarh perused the information submitted by Projectaut'hority. After detailed deliberations, the SEIAA, Chhattisgarh inlOth meeting heldon 2210912009 decided to accept the recommendation of sEAC, Chhattisgarh togrant Environment Clearance. Acc_ordingly, SEIAA, Chhattisgarh hereby accordsEnvironmental Clearance for <strong>Lime</strong> StonJMining - 5,000 tonnes per annum subjectto strict compliance of the terms and conditions mentioned below:-A.il.iltSpecific ConditionsAfter exhausting the first mine pit and before starting mining operations in the;;;l pii: 1-""turition and ptantation works in the exhausted pit shall be carriedout, so as to ensure that reclamation, forest cover and vegetation are visibleduring the first year of mining operations in the next pit. This process wouldilirou,itirr the tasi pit is exhaust"d. Ro"quate rehabilitation of mined pit shall becompleted before any minerals bearing area is worked'Adequate buffer zone shall be maintained between two consecutive mineralbearing dePosits.Fugitive dust generation shall be controlled. Fugitive dust emission shall beretltively moriitored at locations of nearest human habitation (includingschools'and other public amenities located nearest to sources of dustgeneration as applicable) _andperiodic reports_shal! be submitted toLnn.ttirgttn fniiionmeni Conservation Boar!, Raipqr, Regional Office'ahh;tti6;rh Environment Conservation Board, Raipur, SEIAA, Chhattisgarh,,V

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!