21.07.2015 Views

APPENDIX I (See paragraph - 6) FORM 1 - Seiaacg.org

APPENDIX I (See paragraph - 6) FORM 1 - Seiaacg.org

APPENDIX I (See paragraph - 6) FORM 1 - Seiaacg.org

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

pisciculture as well as this water reservoir will besurrounded by tree plantations which will help inrecharging the ground water and can also be usedfor irrigation purpose.1.11 Dredging? No No dredging activity will be involved.1.12 Offshore structures? No No offshore structures are envisaged in theproposed project.1.13 Production and manufacturing No Manual mining will be done..processes?1.14 Facilities for storage of goods ormaterials?1.15 Facilities for treatment or disposalof solid waste or liquid effluents?1.16 Facilities for long term housing ofoperational workers?1.17 New road, rail or sea traffic duringconstruction or operation?NoNoNoNoThere is no sub grade mineral which will begenerated during mining operations. There is noconsideration for stacking of sub grade mineral.There is no material which can be called as wasterock.No, there shall not be any facility for long termhousing of the labours as all the labours will comefrom the near by villages.Haul road will be constructed for mining activities.1.18 New road, rail, air waterborne or No NAother transport infrastructureincluding new or altered routes andstations, ports, airports etc?1.19 Closure or diversion of existing No NAtransport routes or infrastructureleading to changes in trafficmovements?1.20 New or diverted transmission lines No NAor pipelines?1.21 Impoundment, damming, No No river or big nallah lies in the lease area.culverting, realignment or otherchanges to the hydrology ofwatercourses or aquifers?1.22 Stream crossings? No No stream crossing is involved.1.23 Abstraction or transfers of waterfrom ground or surface waters?Yes The water require for proposed plant will bedrawn from bore well.1.24 Changes in water bodies or the landsurface affecting drainage or runoff?1.25 Transport of personnel or materialsfor construction, operation ordecommissioning?1.26 Long‐term dismantling ordecommissioning or restorationworks?NoYesYesNo changes in water bodies and land surface areanticipated as the site is more or less flat withoutmany undulations and will not affect drainage orrunoff.Transport arrangement will be made for staffcoming from distant villages/towns where theycommute for work.At the end of the life of the mine it is proposedthat area to be water filled and used forpisciculture as well as this water reservoir will besurrounded by tree plantations which will help inrecharging the ground water and can also be usedfor irrigation purpose.1.27 Ongoing activity during No No such works are envisaged

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!