APPENDIX â I (See paragraph â 6) FORM 1 (I) Basic ... - Seiaacg.org
APPENDIX â I (See paragraph â 6) FORM 1 (I) Basic ... - Seiaacg.org
APPENDIX â I (See paragraph â 6) FORM 1 (I) Basic ... - Seiaacg.org
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
espect to local land use plan)1.2 Clearance of existing land, vegetationand buildings?Open Land, with no existingvegetation or building1.3 Creation of new land uses? No1.4 Pre-construction investigations e.g. borehouses, soil testing?No1.5 Construction works? No1.6 Demolition works? No1.7 Temporary sites used for constructionworks orhousing of construction workers?1.8 Above ground buildings, structures orearthworks including linear structures, cutand fill or excavations1.9 Underground works including mining ortunneling?NoYes Activity includesexcavation of earth andcrushing of minedlimestone for use asbuilding materialNo1.10 Reclamation works? No1.11 Dredging? No1.12 Offshore structures? No1.13 Production and manufacturingprocesses?1.14 Facilities for storage of goods ormaterials?1.15 Facilities for treatment or disposal of solidwaste or liquid effluents?1.16 Facilities for long term housing ofoperational workers?No Activity involves onlyexcavation and crushing ofmined limestone, no newgoods produced ormanufactured.No The crushed limestone willbe kept as is on the openland of the proposed site.No No solid or liquid wastegenerated.No Local labourers will beemployed1.17 New road, rail or sea traffic duringconstruction or operation?NoExisting approach road isto be used.4