37<br />

Tangible Progress: FEED and Contracting Activities<br />

� Offshore Front-End-Engineering-Design (FEED):<br />

– Conducted in <strong>Shell</strong> offices, Aberdeen during<br />

March 2004 to February 2005<br />

� Onshore FEED:<br />

– Conducted by JGC, primarily in the London<br />

offices of MW Kellogg (joint venture of JGC &<br />

KBR), during March 2004 – May 2005<br />

– Close to 500,000 man-hours<br />

� Investment Decision<br />

– July 2006<br />

� EPC Contracting:<br />

– Multiple contractor strategy<br />

– Several bids awarded (Sep. 2006)