KITUI SAND DAMS
Sasol - 2004 - Kitui sand dams Construction and ... - SamSamWater
Sasol - 2004 - Kitui sand dams Construction and ... - SamSamWater
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
L j = Hydraulic Length.This length should cover the distance of the projection of the water flowing over thespill way. This can be determined using either free fall or simplified slop area methodto determine the discharge through the spillway.1 L D = 0.96 (q 1/3. Hs 1/2) (Free Fall Method).q= Q/L s2 Log Q = 0.188+1.33 loqA+0.05 log S + 0.056 (Log S) 2Typical Example.i) Kwa -Ngove.A=8.25m 2 ; S=0.01; H s= 1.5LogQ = 0.188+1.33 loq8.25+0.05 log (10 -2 ) + 0.056 (Log 10 -2 ) 2=1.531.Q=34m 3 /sq = Q/L s = 34m 3 /6.5ms=5.22m 2 /sL Bf =L D =0.96 (q 1/3 .H s 1/2 )=0.96 (5.22 1/3 * 1.5 1/2 )=2.04m.ii) Kwa- Kathata.H f =1.05m; H s =1.35m; W f =2.6m; W b =1.8m; L s =1.8m; S=0.01.A=1/2 × 1.05 × (2.6+1.8) = 2.31m 2LogQ = 0.188+1.33 loq2.31+0.05 log (0.01) + 0.056 (Log 0.01) 2= 0.840Q= 6.91m 3 /sQ = 6.91m 3 s -1 /1.8m =3.84m 2 s -1L Bf = 0.96 (3.84 1/3 × 1.35 1/2 )41