19.08.2015 Views

KITUI SAND DAMS

Sasol - 2004 - Kitui sand dams Construction and ... - SamSamWater

Sasol - 2004 - Kitui sand dams Construction and ... - SamSamWater

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Key.1 W dc 75cm when off the ground and 60cm under the ground..100mm slab (mortar 1:3)2 Main wall of hard cores and cement 9:4:13 -50mm Plaster (Mortar 1:3)4 -Impermeable formation.2re-hSection w-w0.85m15cm plaster100mm slab(1:3)0.5m0.6m 0.4m L BFNB: Section W-w is through the spillway crest. That is why width is 85cm notusual width 75cm.55

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!