05.09.2015 Views

Operation of Aircraft

Annex 6, Part I

Annex 6, Part I

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Attachment E<br />

it has been demonstrated, in view <strong>of</strong> the flight<br />

consequences <strong>of</strong> the failure and the probability and<br />

consequences <strong>of</strong> subsequent failures, that no substantial<br />

degradation <strong>of</strong> safety results from continuation <strong>of</strong> the<br />

planned flight; and<br />

c) changes impacting the status <strong>of</strong> items on the minimum<br />

equipment list, the communications and navigation<br />

facilities, fuel and oil supply, en-route alternate<br />

aerodromes or aeroplane performance, make appropriate<br />

adjustments to the flight plan.<br />

8. <strong>Operation</strong>al authorization<br />

In authorizing the operation <strong>of</strong> an aeroplane with two powerunits<br />

on an extended range route in accordance with Chapter 4,<br />

4.7.2, the State <strong>of</strong> the Operator should, in addition to the<br />

requirements previously set forth in this Attachment, ensure<br />

that:<br />

Annex 6 — <strong>Operation</strong> <strong>of</strong> <strong>Aircraft</strong><br />

a) the operator’s past experience and compliance record is<br />

satisfactory;<br />

b) the operator has demonstrated that the flight can<br />

continue to a safe landing under the anticipated<br />

degraded operating conditions which would arise from:<br />

1) total loss <strong>of</strong> thrust from one power-unit; or<br />

2) total loss <strong>of</strong> power-unit generated electric power; or<br />

3) any other condition which the State <strong>of</strong> the Operator<br />

considers to be equivalent in airworthiness and<br />

performance risk;<br />

c) that the operator’s crew training programme is adequate<br />

for the proposed operation; and<br />

d) that documentation accompanying the authorization<br />

covers all relevant aspects.<br />

ATT E-3 1/11/01

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!