08.09.2015 Views

TRANSPORTATION STUDY

TRANSPORTATION STUDY - Town of Collingwood

TRANSPORTATION STUDY - Town of Collingwood

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

9: Old Mountain Road & Balsam Street 2010 Existing Conditions<br />

HCM Signalized Intersection Capacity Analysis<br />

AM Peak Hour<br />

Movement EBL EBR NBL NBT SBT SBR<br />

Lane Configurations<br />

Volume (vph) 44 117 213 513 659 39<br />

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900<br />

Total Lost time (s) 6.0 6.0 3.0 6.0 6.0<br />

Lane Util. Factor 1.00 1.00 1.00 0.95 0.95<br />

Frt 1.00 0.85 1.00 1.00 0.99<br />

Flt Protected 0.95 1.00 0.95 1.00 1.00<br />

Satd. Flow (prot) 1789 1601 1789 3579 3549<br />

Flt Permitted 0.95 1.00 0.23 1.00 1.00<br />

Satd. Flow (perm) 1789 1601 425 3579 3549<br />

Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95<br />

Adj. Flow (vph) 46 123 224 540 694 41<br />

RTOR Reduction (vph) 0 87 0 0 8 0<br />

Lane Group Flow (vph) 46 36 224 540 727 0<br />

Turn Type Perm pm+pt<br />

Protected Phases 4 5 2 6<br />

Permitted Phases 4 2<br />

Actuated Green, G (s) 16.0 16.0 27.0 27.0 16.3<br />

Effective Green, g (s) 16.0 16.0 27.0 27.0 16.3<br />

Actuated g/C Ratio 0.29 0.29 0.49 0.49 0.30<br />

Clearance Time (s) 6.0 6.0 3.0 6.0 6.0<br />

Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0<br />

Lane Grp Cap (vph) 520 466 400 1757 1052<br />

v/s Ratio Prot c0.03 c0.08 0.15 c0.20<br />

v/s Ratio Perm 0.02 0.20<br />

v/c Ratio 0.09 0.08 0.56 0.31 0.69<br />

Uniform Delay, d1 14.2 14.1 8.9 8.4 17.1<br />

Progression Factor 1.00 1.00 1.00 1.00 1.00<br />

Incremental Delay, d2 0.3 0.3 1.8 0.5 3.7<br />

Delay (s) 14.5 14.5 10.7 8.8 20.9<br />

Level of Service B B B A C<br />

Approach Delay (s) 14.5 9.4 20.9<br />

Approach LOS B A C<br />

Intersection Summary<br />

HCM Average Control Delay 15.0 HCM Level of Service B<br />

HCM Volume to Capacity ratio 0.43<br />

Actuated Cycle Length (s) 55.0 Sum of lost time (s) 15.0<br />

Intersection Capacity Utilization 47.9% ICU Level of Service A<br />

Analysis Period (min) 15<br />

c Critical Lane Group<br />

Synchro 7 - Report<br />

Page 3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!