Table 40: Intersection Operations - Diversion Scenario<br />

4<br />

Intersection and Movement<br />

First Street &<br />

High Street<br />

EB<br />

Control<br />

Weekday<br />

AM Peak Hour<br />

delay LOS v/c<br />

67 E 1.03<br />

WB 52 D 1.03<br />

signal<br />

NB 72 E 1.01<br />

SB 77 E 1.03<br />

Intersection Improvements<br />

• no improvements required beyond<br />

those recommended under 2020<br />

total conditions (ie. exclusive NB<br />

and SB right turn lanes are not<br />

required)<br />

overall signal 66 E 1.02<br />

9<br />

Tenth Line &<br />

Mountain Road<br />

EB<br />

WB<br />

51<br />

41<br />

D<br />

D<br />

1.00<br />

0.96<br />

signal<br />

NB 51 D 0.97<br />

SB 41 D 0.80<br />

• exclusive EB right turn lane<br />

• permitted and protected phasing<br />

for the NB left turn movement<br />

overall signal 46 D 0.95<br />

10<br />

Tenth Line &<br />

Sixth Street<br />

EB<br />

WB<br />

21<br />

25<br />

C<br />

C<br />

0.64<br />

0.74<br />

signal<br />

NB 38 D 0.98<br />

SB 46 D 0.88<br />

• signalization<br />

• exclusive EB & WB right turn lanes<br />

• exclusive NB and SB left turn lanes<br />

• permitted and protected phasing<br />

for the WB and NB left turns<br />

overall signal 33 C 0.83<br />

6.4.1 Mountain Road & Tenth Line<br />

This intersection, already identified for temporary signals by the Town, has already been analyzed<br />

under signalization for the 2020 and 2030 total conditions. The results are presented again in Table<br />

41 alongside the results of the roundabout analysis. The initial analysis considers single lanes for all<br />

approaches and, hence, a single lane roundabout.<br />

The roundabout and signalized scenarios provide similar operating conditions under both horizon<br />

years, with poor conditions (level of service F) occurring in 2030 given the projected total traffic<br />

volumes. The poor operating conditions are a result of the high volume of traffic and the single lane<br />

approaches. It is noted that in considering signalization and 2030 total volumes, the addition of<br />

exclusive westbound and eastbound left turn lanes and an exclusive northbound right turn lane are<br />

recommended to accommodate the 2030 total volumes<br />

Transportation Study<br />

Town of Collingwood<br />

Page 62<br />

July 9, 2012