15.09.2015 Views

(QMS) Operational Plan - Haldimand County

(QMS) Operational Plan - Haldimand County

(QMS) Operational Plan - Haldimand County

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Corporation of <strong>Haldimand</strong> <strong>County</strong> Quality Management System (<strong>QMS</strong>) <strong>Operational</strong> <strong>Plan</strong><br />

f) <strong>Operational</strong> Performance<br />

Discussions with W & WW Supervisors is required for clarity of<br />

where all maintenance programs are documented<br />

All maintenance programs have been performed as per<br />

maintenance sheets, work orders and daily logs<br />

Any identified deficiencies or areas needing attention have been<br />

recorded and included as a capital project repair/replacement or<br />

scheduled for routine maintenance or included under annual<br />

operational budget for repair/<br />

g) Raw water supply and drinking water quality trends<br />

Results are provided from Accredited Operating Authority (Veolia<br />

Water) on a routine basis. <strong>County</strong> reviews and provides feedback<br />

as needed.<br />

<strong>County</strong> has monthly data/operations review meetings with<br />

operating authority and reiterated the importance of collecting,<br />

monitoring and reporting all raw water results<br />

<strong>County</strong> has requested sampling outside of regulatory requirements<br />

be conducted on raw water for Crypto/Giardia to improve<br />

characterization of raw water for log removal for disinfection<br />

practices (also a Continual Improvement)<br />

A Memorandum of Understanding exists between <strong>Haldimand</strong><br />

<strong>County</strong> and City of Hamilton that identifies both municipalities level<br />

of responsibility for water supply, treatment, monitoring and<br />

maintenance. This document is reviewed, at a minimum, annually<br />

with changes noted and final sign off by Senior Management from<br />

both Municipalities.<br />

h) Follow-up on action items from previous management review<br />

N/A<br />

i) The status of management action items identified between reviews<br />

N/A<br />

j) Changes that could affect the <strong>QMS</strong><br />

Changes to the contracted operating authority<br />

Regulatory process changes for disinfection practices for Caledonia<br />

/ Cayuga distribution system<br />

Changes to infrastructure as a result of expansions or studies may<br />

identify new risks and operational challenges<br />

k) The resources needed to maintain the <strong>QMS</strong><br />

The Existing DW<strong>QMS</strong> Capital Account will be closed effective<br />

December 31, 2012<br />

An Annual Operating Expense has been identified going forward to<br />

05-Feb-13 ELECTRONIC PLAN IS CURRENT - PRINTED PLAN IS UNCONTROLLED COPY PAGE 56

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!