19.09.2015 Views

Chatham Conservation Commission The Annex ... - Town to Chatham

Chatham Conservation Commission The Annex ... - Town to Chatham

Chatham Conservation Commission The Annex ... - Town to Chatham

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Chatham</strong> <strong>Conservation</strong> <strong>Commission</strong><br />

<strong>The</strong> <strong>Annex</strong> 261 George Ryder Road<br />

MINUTES June 11, 2008<br />

4:00 PM Work Session & Continued Hearings<br />

Page 3 of 6<br />

proposed repairs <strong>to</strong> an existing revetment at the end of Holway Street. An Order of<br />

Conditions was written<br />

85 Wapoos Trail, Frank Andrew/Frances deGanahl, SE 10-2455: It was moved,<br />

seconded and voted <strong>to</strong> approve the Ryder & Wilcox Inc site plan dated March 5, 2008 for<br />

view pruning and invasive removal at 85 Wapoos Trail. An Order of Conditions was<br />

written.<br />

185 Balfour Lane, Wohl, SE 10-2353: It was moved, seconded and voted <strong>to</strong> approve the<br />

Coastal Engineering Company Inc C2.2.1 plan dated July 30, 2007 revised May 22, 2008<br />

for renovations <strong>to</strong> an existing dwelling at 185 Balfour Lane. An Order of Conditions<br />

was written.<br />

159 Tide Mill Lane, Stello, SE 10: <strong>The</strong> <strong>Commission</strong> reviewed the draft document<br />

denying the pier ramp and float and approving the vista pruning, catwalk, and stairway<br />

down the coastal bank at 159 Tide Mill Lane. It was moved, seconded and voted <strong>to</strong><br />

accept the draft as the final document.<br />

79 Barcliff Ave, Gardner, SE 10-: <strong>The</strong> ZBA had requested comment on the proposal<br />

for 79 Barcliff Avenue. <strong>The</strong> <strong>Commission</strong> reviewed the Clark Engineering plan dated<br />

April 8, 2008 for the replacement of existing stairs down an Inland Bank and the<br />

construction of a catwalk for access <strong>to</strong> Black Pond at the above address.<br />

All proposed work is within an inland conservancy district and within a Bordering<br />

Vegetated Wetland (BVW) fronting Black Pond.<br />

<strong>The</strong> timber stairs are <strong>to</strong> be replaced in kind in theire current location. <strong>The</strong> proposed<br />

catwalk is <strong>to</strong> be 3-ft wide, 48 ft long and will be elevated above the wetland on helical<br />

piers. It will end just short of the edge of the pond with two cantilevered benches.<br />

<strong>The</strong> area of the proposed catwalk is currently an established, but overgrown, path with<br />

planks placed on the wetland substrate. As mitigation for the wrok in the wetland, the<br />

applicant will remove the planks and remove an old, decrepit shack from the wetland.<br />

<strong>The</strong> <strong>Commission</strong> finds that this project can be conditioned <strong>to</strong> avoid adverse impact <strong>to</strong> the<br />

BVW.<br />

286-296 Shore Rd, CBI, SE 10- <strong>The</strong> ZBa had requested comment on the proposal for<br />

installation of utilities at 286-296 Shore Road. <strong>The</strong> <strong>Commission</strong> has reviewed the Coastal<br />

Engineering Company Inc plan dated August 20, 2007, revised February 23, 2008, for the<br />

proposed installation of water and power lines <strong>to</strong> end upon a recently permitted seasonal<br />

pier at the above address.<br />

All proposed work is within coastal dune, coastal beach and over Land Under the Ocean.