39980 16-Jan-13<br />

31775 23-Aug-12<br />

22025 04-Apr-12<br />

18383 17-Feb-12<br />

10922 30-Jul-11<br />

50'+40' portion damaged need repair. R/C/E under preparation.<br />

Repair required due to gradient, last repair was done in 03, 2008<br />

EE reported, road is patchless.<br />

WBM patches done. PC patches left due to cold weather will be<br />

completed upto 15.03.2012<br />

Constructed 1994. Path 4 karam. Crust 150mm. PC done 3/2008.<br />

Patch required (EC 45 K)<br />

2) H - 1704 Kalka Bar Godam Road To Pargian Kalka<br />

0.89 km.<br />

61828 17-Jan-14<br />

60923 06-Jan-14<br />

60573 02-Jan-14<br />

60471 31-Dec-13<br />

57236 31-Oct-13<br />

57100 30-Oct-13<br />

47798 30-May-13<br />

44577 09-Apr-13<br />

40871 13-Feb-13<br />

36352 26-Oct-12<br />

10919 14-Oct-11<br />

10890 30-Jul-11<br />

Tender with Chief Engineer for decision of rates.<br />

Returned for reduction of rates.<br />

Work Plan-2: Tender in head office with C.E.<br />

D/E technically sanctioned for Rs. 79,20,926/-. (2nd priority).<br />

No tender received on 30.10.2013 , now re-invited and due to be<br />

received on 15.11.2013.<br />

Tender invited for 30.10.2013.<br />

Balance work will be got completed upto 20.06.2013.<br />

paver blocks in 280 mtr laid on 23.3.13 ,Heavy patch work required<br />

in 610 mtr. Exp. 8.36 lacs<br />

Paver block laid in 240m out of 280m.<br />

AA for Rs. 9.30 lacs on 9/10/2012. Work awarded on 19.10.12 to<br />

Sh. Rahul Sahgal.<br />

SE proposes: Paver blocks in 300 m (cost 8.60 lacs).<br />

Constructed 1995. Crust 150mm. 75mm WBM + PC done in 8/2008.<br />

3) H - 1710 Bataur To H.M.T Colony Panchkula<br />

2.10 km.<br />

61829 17-Jan-14<br />

57755 13-Nov-13<br />

57101 30-Oct-13<br />

55897 01-Oct-13<br />

44623 09-Apr-13<br />

44836 09-Apr-13<br />

40876 13-Feb-13<br />

31797 23-Aug-12<br />

10983 14-Oct-11<br />

Rates approved on 06.01.14. Work allotted on 08.1.14.<br />

Sent to CE office for approval of rates.<br />

Tender case sent to CE for approval of rates.<br />

Tender re-invited for 15.10.2013<br />

Patch work done on 24.03.13 in A/R 2012-13. Good condition in 1<br />

km and motorable in 1.1 km. Exp. 1.47 lacs.<br />

EE reported, Road is patchless.<br />

Taken in A/R 2012-13.<br />

under transfer to MC.<br />

Constructed 2001. Path 4 karam. Crust 150mm. Patch + PC done in<br />

2/2007. Patches (400 sqm) done on 10/8/2011 to 6/9/2011 (30k).<br />

2. New Construction<br />

Sub Total:<br />

4.02 km.<br />

New Construction - Awarded<br />

1) H - 4724 Approach Road Of Naggal Stadium Panchkula<br />

0.76 km.<br />

61835 17-Jan-14<br />

59776 11-Dec-13<br />

E/M of Ashwani Kumar forfeited and tender called on 15.01.14. No<br />

tender received on 15.01.14. now tender to be recalled on 05.02.14.<br />

Earth not available.<br />

Monday, January 20, 2014 Page 14 of 24