Haryana State Agricultural Marketing Board
13.Panchkula - Haryana Marketing Board
13.Panchkula - Haryana Marketing Board
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Haryana</strong> <strong>State</strong> <strong>Agricultural</strong> <strong>Marketing</strong> <strong>Board</strong><br />
Summary of Road Network<br />
Chronology of roads constructed by HSAMB in Panchkula Division:<br />
Roads Completed before 1-9-1999 50 roads 54.17 km<br />
Roads Completed between 1-9-1999 and 31-3-2005 17 roads 15.61 km<br />
Roads Sanctioned prior to 1-4-2005 and Completed after 1-4-2005 1 roads 1.12 km<br />
Roads Sanctioned between 1-4-2005 and 24-9-2009 7 roads 9.98 km<br />
Roads Sanctioned after 24-9-2009 4 roads 1.22 km<br />
Panchkula<br />
Completed Roads under Maintenance<br />
HSAMB Constructed Roads<br />
Total: 79 roads 82.10 km<br />
No SR envisaged 44 roads<br />
36.07<br />
SR Awarded 3 roads<br />
2.93<br />
SR sanctioned but yet to be awarded 1 roads<br />
0.67<br />
SR Un-awarded 3 roads<br />
4.02<br />
New Construction going on<br />
Panchkula<br />
km<br />
km<br />
km<br />
km<br />
Group Total: 51 roads 43.69 km<br />
New Construction - Awarded 1 roads<br />
0.76<br />
New Construction - Unawarded 2 roads<br />
6.06<br />
km<br />
km<br />
Group Total: 3 roads 6.82 km<br />
Other<br />
Dropped 3 roads<br />
1.73<br />
Rejected by Government 1 roads<br />
4.50<br />
Relates to other department 1 roads km<br />
km<br />
km<br />
Group Total: 5 roads 6.23 km<br />
Planned - New Construction<br />
Transferred<br />
PR with AM Office 4 roads<br />
10.08<br />
km<br />
Group Total: 4 roads 10.08 km<br />
Transferred to MC 19 roads<br />
15.78<br />
Transferred to PWD (938 roads) 4 roads<br />
10.92<br />
Transferred to PWD (Individual) 2 roads<br />
4.89<br />
No SR envisaged<br />
km<br />
km<br />
km<br />
Group Total: 25 roads 31.59 km<br />
Division Total: 88 roads 98.41 km<br />
1. Maintenance<br />
1) H - 1695 Barh To Barh Harijan Basti Kalka<br />
0.34 km.<br />
Monday, January 20, 2014 Page 1 of 24
60462 31-Dec-13<br />
47792 30-May-13<br />
44575 09-Apr-13<br />
18360 17-Feb-12<br />
D/E technically sanctioned for Rs. 79,20,926/-. (2nd priority).<br />
AR tender on 29.05.2013 received and work allotted on 29.05.2013.<br />
C.C road in good condition.<br />
Constructed 05/1997 path 3 karam crust 150mm. CC entire done<br />
02/2008. No patches. Good condition<br />
2) H - 1696 Pinjore Nalagarh Road To Kona Harijan Basti Kalka<br />
0.87 km.<br />
60463 31-Dec-13<br />
57757 13-Nov-13<br />
55901 01-Oct-13<br />
53205 14-Aug-13<br />
44627 09-Apr-13<br />
40873 13-Feb-13<br />
32801 17-Sep-12<br />
10910 14-Oct-11<br />
10883 30-Jul-11<br />
D/E technically sanctioned for Rs. 79,20,926/-. (2nd priority).<br />
Work completed except 90 mtr disputed portion (court case)<br />
Work completed except 90mtr due to Hon'ble court stay<br />
400m already completed (Paver block). In rest court case next date<br />
on 21.08.2013. contempt on stay on 09.09.2013.<br />
Work delayed due to dispute. Dispute settled with Distt.<br />
Admistration helps & work started on 21.03.2013.<br />
Work allotted to SH. Mohit Bansal on 01.02.2013.<br />
AA on 14.9.2012 for Rs. 33.43 lacs for pavers and drain in full<br />
length.<br />
SE proposes: 150m paver blocks (7 lacs).<br />
Constructed 1990. Crust 150mm. 100m CC + rest PC done in 2/2008.<br />
3) H - 1697 Pinjore Nalagarh Road To Kholi Rakhwala Kalka<br />
0.48 km.<br />
60464 31-Dec-13<br />
50965 03-Jul-13<br />
47793 30-May-13<br />
36351 26-Oct-12<br />
10895 30-Jul-11<br />
D/E technically sanctioned for Rs. 79,20,926/-. (2nd priority).<br />
477.53 Sqm patch done from 5/6/2013 to 7/6/2013 (Exp 125 k).<br />
AR tender on 29.05.2013 received and work allotted on 29.05.2013.<br />
AA on 17.10.2012 for Rs. 5.52 lacs. Work allotted on 23.10.2012 to<br />
Sh. Krishan kumar.<br />
Constructed 1997. Crust 150mm. PC done in 9/2008. Culvert was<br />
made by Panchayat at a place.on 5/12/2012, pavers laid in 100m<br />
length in 505m width (5.07 lacs).<br />
4) H - 1700 Pinjore Nalagarh Road To Charnia Kalka<br />
0.56 km.<br />
60467 31-Dec-13<br />
50967 03-Jul-13<br />
47796 30-May-13<br />
44835 09-Apr-13<br />
43763 25-Mar-13<br />
31781 23-Aug-12<br />
18083 14-Feb-12<br />
10981 14-Oct-11<br />
D/E technically sanctioned for Rs. 79,20,926/-. (2nd priority).<br />
609.86 Sqm patch done from 2/6/2013 to 4/6/2013 (Exp 148 k).<br />
AR tender on 29.05.2013 received and work allotted on 29.05.2013.<br />
SR required.<br />
EE reported, Road is patchless.<br />
Work allotted on 14.02.2013 for A/R and will be completed upto<br />
31.03.2013.<br />
Road is motorable but repair required due to non disposal of water<br />
and topography , last S/R done in 07, 2008.<br />
E.E reported road is patchless.<br />
Constructed 1994. Path 4 karam. Crust 150mm. Patches (53 sqm)<br />
done on 10/8/2011 to 6/9/2011 (12.2k).<br />
5) H - 1701 Pinjore Nalagarh Road To Khokhran Kalka<br />
0.41 km.<br />
60468 31-Dec-13<br />
47797 30-May-13<br />
D/E technically sanctioned for Rs. 79,20,926/-. (2nd priority).<br />
AR tender on 29.05.2013 received and work allotted on 29.05.2013.<br />
SR required.<br />
Monday, January 20, 2014 Page 2 of 24
44622 09-Apr-13<br />
40840 13-Feb-13<br />
31777 23-Aug-12<br />
22142 04-Apr-12<br />
10942 30-Jul-11<br />
Patch work done on 31.03.13 in A/R 2012-13<br />
Patch work taken in A/R 2012-13.<br />
Road is in good condition upto 0.33 km . Balance length is disputed.<br />
Work completed on 31.03.2012.<br />
Constructed 6/1996. Path 4 karam. Crust 150mm. PC done 2002.<br />
Patch + PC sanctioned on 18/5/2006, allotted on 19/9/2006.<br />
Tender (R & C) on 31/10/11.<br />
6) H - 1705 Kalka Bar Godown Road To Khuda Baksh & Dora Kalka<br />
2.35 km.<br />
60472 31-Dec-13<br />
50982 04-Jul-13<br />
50971 03-Jul-13<br />
45838 18-Apr-13<br />
43811 25-Mar-13<br />
7789 03-Oct-11<br />
10928 30-Jul-11<br />
D/E technically sanctioned for Rs. 79,20,926/-. (2nd priority).<br />
AR work for 2013 - 14 to be done. Work allotted on 29/5/2013.<br />
924.12 Sqm patch done from 3/6/2013 to 11/6/2013 (Exp 240k).<br />
Transferred back from PWD on 17.4.2013 within a list of 550<br />
(76+474) roads.<br />
HSAMB roads likely back from PWD B&R.<br />
Transferred to PWD. PWD RoadID : 9260<br />
Constructed 8/1994. Path 6 karam. Crust 150mm. PC done 4/2008.<br />
7) H - 1706 Kalka Bar Godam Road To Kheranwali Kalka<br />
0.50 km.<br />
60473 31-Dec-13<br />
47799 30-May-13<br />
43793 25-Mar-13<br />
40872 13-Feb-13<br />
36353 26-Oct-12<br />
10913 14-Oct-11<br />
10885 30-Jul-11<br />
D/E technically sanctioned for Rs. 79,20,926/-. (2nd priority).<br />
AR tender on 29.05.2013 received and work allotted on 29.05.2013.<br />
S/R work completed on 21.03.2013.<br />
Tender received on 09.01.2013. work allotted to Sh. Rajesh Kumar<br />
on 08.02.2013.<br />
AA on 23.10.2012 for RS. 3.32 lacs. Work awarded on 25.10.2012 to<br />
Sh. Amritpal.<br />
SE proposes: Patch + PC (3.2 lacs).<br />
Constructed 1994. Crust 150mm. PC done in 6/1999.<br />
8) H - 1707 Khetpurali To Sabilpur Panchkula<br />
0.57 km.<br />
44578 09-Apr-13<br />
39674 01-Jan-13<br />
31778 23-Aug-12<br />
18356 17-Feb-12<br />
10900 30-Jul-11<br />
Road is in good condition.<br />
Tender approved on 28/12/2012 (Sh. Varinder Kumar).<br />
Road is in motorable condition except fH.L. bridge portion.<br />
75mm WBM +PC sanctioned on 18.05.2006 allotted on 19.09.2006,<br />
falls in 2nd priority against combined A/A of Rs. 83.38 lacs dated<br />
18.05.2006. Now previous agency resumed the work & promised to<br />
complete upto 31.03.2012.<br />
Constructed 3/1994. Path 6 karam. Crust 150mm. PC done in 1999.<br />
9) H - 1714 Rehawar To School Panchkula<br />
0.41 km.<br />
60440 31-Dec-13<br />
60271 21-Dec-13<br />
47802 30-May-13<br />
44925 10-Apr-13<br />
D/E sanctioned for Rs. 84,54,164/-. (5th priority)<br />
D/E tech. sanctioned for Rs. 8454164/- for a group of 1724, 1712,<br />
1725, 1726, 1714, 1727, 1715, 1716, 1717, 1718, 1719, 1720, 1721,<br />
1722 & 1723.<br />
AR tender on 29.05.2013 received and work allotted on 29.05.2013.<br />
No need of brick on edge nor any place. The AR of the road be<br />
done. Work be closed, EIC decided.<br />
Monday, January 20, 2014 Page 3 of 24
44616 09-Apr-13<br />
39983 16-Jan-13<br />
31771 23-Aug-12<br />
10879 14-Oct-11<br />
10881 30-Jul-11<br />
Tender received on 04.02.13 for balance work in 5th priority.<br />
Tender in approval process. CC Road in 410 m is in good condition.<br />
Brick on edge on berms is pending.<br />
Tender to be received on 04.02.2013 at risk and cost of Inderpal<br />
and co.<br />
Good condition, C.C. laid , berms pending.<br />
75mm WBM + Cement concrete in entire length was sanctioned on<br />
14/1/2008 (5th priority), allotted on 11/4/2008 (Inder Pal). Work<br />
done except brick on edge on the side. Tenders for brick on edge on<br />
31/10/2011.<br />
Constructed 1/1997. Path 4 karam. Crust 150mm. PC done in 2001.<br />
10) H - 1715 Symtoo To Kanauli Panchkula<br />
1.35 km.<br />
60442 31-Dec-13<br />
60273 21-Dec-13<br />
47803 30-May-13<br />
44926 10-Apr-13<br />
44617 09-Apr-13<br />
40870 13-Feb-13<br />
39984 16-Jan-13<br />
37887 27-Nov-12<br />
31770 23-Aug-12<br />
18364 17-Feb-12<br />
10899 30-Jul-11<br />
D/E sanctioned for Rs. 84,54,164/-. (5th priority)<br />
D/E tech. sanctioned for Rs. 8454164/- for a group of 1724, 1712,<br />
1725, 1726, 1714, 1727, 1715, 1716, 1717, 1718, 1719, 1720, 1721,<br />
1722 & 1723.<br />
AR tender on 29.05.2013 received and work allotted on 29.05.2013.<br />
No need of brick on edge. AR be done. Work be closed.<br />
Tender received on 04.02.13 for balance work in 5th priority.<br />
Tender in approval process. Brick on edge on berms is pending.<br />
Taken in A/R 2012-13.<br />
Tender to be received on 04.02.2013 on risk and cost.<br />
The history of memos shows that officers are misrepresenting<br />
about progress. SE to visit site on 30th Nov. give correct picture<br />
and settle issues regarding need of remains works.<br />
Good condition, C.C. in some portion and berms pending.<br />
In 465m CC (RD885-1350m in vill. Kanauli) and rest PC sanctioned<br />
on 14.01.2008 allotted on 11.04.2008(Inder Pal).<br />
Constructed 3/1989. Path 5 karam. Crust 150mm. PC done in 2002.<br />
11) H - 1717 Tibbi To Shiv Mandir Panchkula<br />
0.46 km.<br />
60444 31-Dec-13<br />
60275 21-Dec-13<br />
50956 03-Jul-13<br />
44583 09-Apr-13<br />
40845 13-Feb-13<br />
31776 23-Aug-12<br />
10987 14-Oct-11<br />
D/E sanctioned for Rs. 84,54,164/-. (5th priority)<br />
D/E tech. sanctioned for Rs. 8454164/- for a group of 1724, 1712,<br />
1725, 1726, 1714, 1727, 1715, 1716, 1717, 1718, 1719, 1720, 1721,<br />
1722 & 1723.<br />
193.42 Sqm patch done from 24/5/2013 to 26/5/2013 (Exp 79 k).<br />
Road is in good condition except 30 mtr stretch is where there are<br />
skin patches and village drain water flows over the road.<br />
Taken in A/R 2012-13. A/R will be done 2013-14.<br />
Repair required in half portion due to street reach , last S/R done in<br />
04, 2010.<br />
Constructed 2001. Path 4 karam. Crust 150mm. Patch + PC in<br />
8/2009. Patches (45 sqm) done in 14/8/2011 to 20/9/2011 (9.8K).<br />
12) H - 1719 Kalka Bargodam Road To Paploha Kalka<br />
0.16 km.<br />
60446 31-Dec-13<br />
60277 21-Dec-13<br />
D/E sanctioned for Rs. 84,54,164/-. (5th priority)<br />
D/E tech. sanctioned for Rs. 8454164/- for a group of 1724, 1712,<br />
1725, 1726, 1714, 1727, 1715, 1716, 1717, 1718, 1719, 1720, 1721,<br />
1722 & 1723.<br />
Monday, January 20, 2014 Page 4 of 24
47804 30-May-13<br />
44584 09-Apr-13<br />
31779 23-Aug-12<br />
18359 17-Feb-12<br />
AR tender on 29.05.2013 received and work allotted on 29.05.2013.<br />
Road is motorable<br />
Road is in motorable position, last S/R done in 08, 2009.<br />
Constructed 03/1994 path 4 karam crust 150mm. PC done 8/2009.<br />
No patches. Good condition<br />
13) H - 1720 Ganeshpur To Bhoriya Mandir Kalka<br />
0.35 km.<br />
60447 31-Dec-13<br />
60278 21-Dec-13<br />
47805 30-May-13<br />
44624 09-Apr-13<br />
18085 14-Feb-12<br />
10988 14-Oct-11<br />
D/E sanctioned for Rs. 84,54,164/-. (5th priority)<br />
D/E tech. sanctioned for Rs. 8454164/- for a group of 1724, 1712,<br />
1725, 1726, 1714, 1727, 1715, 1716, 1717, 1718, 1719, 1720, 1721,<br />
1722 & 1723.<br />
AR tender on 29.05.2013 received and work allotted on 29.05.2013.<br />
Road is in good condition.<br />
E.E reported road is patchless.<br />
Constructed 2001. Path 4 karam. Crust 150mm. Patch + PC in<br />
8/2009. Patches (30 sqm) done in 11/10/2011 to 13/10/2011 (6K).<br />
14) H - 1721 Bhareli To Sangrana Kalka<br />
1.10 km.<br />
60448 31-Dec-13<br />
60279 21-Dec-13<br />
51618 18-Jul-13<br />
50983 04-Jul-13<br />
45509 18-Apr-13<br />
43812 25-Mar-13<br />
8136 03-Oct-11<br />
10931 30-Jul-11<br />
D/E sanctioned for Rs. 84,54,164/-. (5th priority)<br />
D/E tech. sanctioned for Rs. 8454164/- for a group of 1724, 1712,<br />
1725, 1726, 1714, 1727, 1715, 1716, 1717, 1718, 1719, 1720, 1721,<br />
1722 & 1723.<br />
AR Work completed.<br />
AR work for 2013 - 14 to be done. Work allotted on 29/5/2013.<br />
Transferred back from PWD on 17.4.2013 within a list of 550<br />
(76+474) roads.<br />
HSAMB roads likely back from PWD B&R.<br />
Transferred to PWD. PWD RoadID : 9266<br />
Constructed 1997. Path 6 karam. Crust 150mm. PC done 2001.<br />
15) H - 1723 Nanakpur To Sotwala Kalka<br />
0.93 km.<br />
60450 31-Dec-13<br />
60281 21-Dec-13<br />
47298 16-May-13<br />
44628 09-Apr-13<br />
40874 13-Feb-13<br />
24947 14-Jun-12<br />
10918 14-Oct-11<br />
10882 30-Jul-11<br />
D/E sanctioned for Rs. 84,54,164/-. (5th priority)<br />
D/E tech. sanctioned for Rs. 8454164/- for a group of 1724, 1712,<br />
1725, 1726, 1714, 1727, 1715, 1716, 1717, 1718, 1719, 1720, 1721,<br />
1722 & 1723.<br />
Work completed on 30.04.2013, final payment will be paid with in<br />
10 days.<br />
Work allotted to Sh. Rajiv Sharma on 21.01.2013. WBM completed<br />
in 840 mtr (5.48 width) on 24.03.2013 work is in progress and work<br />
will be completed by 15.04.13. Exp. 14.73 lacs<br />
Work allotted on 21.01.2013 & yet to be started.<br />
AA on 11/6/2012 for Rs. 28.48 lacs<br />
SE proposes: Paver Block in 200m (4.67 lacs).<br />
Constructed 1989. Crust 150mm. PC done in 3/2010.<br />
16) H - 1724 Main Road To Basti Naya Nagar Nanak Chand Kalka<br />
0.33 km.<br />
60435 31-Dec-13<br />
60380 30-Dec-13<br />
D/E sanctioned for Rs. 84,54,164/-. (5th priority)<br />
SE reported: work completed on 30.12.2013.<br />
Monday, January 20, 2014 Page 5 of 24
60267 21-Dec-13<br />
57754 13-Nov-13<br />
55900 01-Oct-13<br />
51384 11-Jul-13<br />
50806 03-Jul-13<br />
46906 08-May-13<br />
44927 10-Apr-13<br />
31773 23-Aug-12<br />
22147 04-Apr-12<br />
10898 30-Jul-11<br />
D/E tech. sanctioned for Rs. 8454164/- for a group of 1724, 1712,<br />
1725, 1726, 1714, 1727, 1715, 1716, 1717, 1718, 1719, 1720, 1721,<br />
1722 & 1723.<br />
Previous agency resume the work. WBM in progress. PC completed<br />
upto 16.11.2013.<br />
The original agency resumed the work & work in progress, will be<br />
completed by 15.10.2013<br />
Tenders not received due to technical fault. Now, tenders to be<br />
received on 29.7.2013.<br />
Tender to be received 08.07.2013.<br />
Tender rejected on account of higher rates. Tender to be recalled.<br />
EE reported: 130m PC left.<br />
No brick on edge required.<br />
Premix pending on 130 mtr.<br />
50mtr PC balance and brick on edge in CC left.<br />
Constructed 2001. Path 4 karam. Crust 150mm. 50m CC and in rest<br />
PC sanctioned on 14/1/2008, allotted on 11/4/2008 (Inder Pal).<br />
Only 132m PC done. Tenders to be received on 31/10/2011.<br />
17) H - 1727 Rattewali To Kanauli Kalka<br />
1.83 km.<br />
60441 31-Dec-13<br />
60272 21-Dec-13<br />
50984 04-Jul-13<br />
50973 03-Jul-13<br />
45839 18-Apr-13<br />
43813 25-Mar-13<br />
8137 03-Oct-11<br />
10932 30-Jul-11<br />
D/E sanctioned for Rs. 84,54,164/-. (5th priority)<br />
D/E tech. sanctioned for Rs. 8454164/- for a group of 1724, 1712,<br />
1725, 1726, 1714, 1727, 1715, 1716, 1717, 1718, 1719, 1720, 1721,<br />
1722 & 1723.<br />
AR work for 2013 - 14 to be done. Work allotted on 29/5/2013.<br />
138 Sqm patch done from 25/6/2013 to 28/6/2013 (Exp 30k).<br />
Transferred back from PWD on 17.4.2013 within a list of 550<br />
(76+474) roads.<br />
HSAMB roads likely back from PWD B&R.<br />
Transferred to PWD. PWD RoadID : 9263<br />
Constructed 1999. Path 6 karam. Crust 150mm. PC done 2002.<br />
18) H - 1729 Kammi Road To Shamshan Ghat Panchkula<br />
0.40 km.<br />
44586 09-Apr-13<br />
40849 13-Feb-13<br />
14050 02-Nov-11<br />
10908 14-Oct-11<br />
Road is motorable except some skin patches.<br />
Road is motorable except some patches will complete in A/R 2012-<br />
13.<br />
Constructed 8/2002. Path 4 karam. Crust 150mm. 75mm WBM + PC<br />
done in 12/2010.<br />
Patches 25 sqm done on 6/9/2011 (Expenditure done 7K).<br />
19) H - 1730 Bhoria To Jatwal Kalka<br />
0.94 km.<br />
44587 09-Apr-13<br />
43770 25-Mar-13<br />
40850 13-Feb-13<br />
39987 16-Jan-13<br />
22027 04-Apr-12<br />
18385 17-Feb-12<br />
Patch work completed on 05.12.12 in AR 2012-13 Exp. 0.33 lacs.<br />
Patch work completed on 05.12.2012 in A/R.<br />
Taken in A/R 2012-13.<br />
A/R done on 05.12.2012.<br />
EE reported, road is patchless.<br />
WBM patches done. PC patches left due to cold weather will be<br />
completed upto 15.03.2012<br />
Monday, January 20, 2014 Page 6 of 24
10887 30-Jul-11<br />
Constructed 1994. Path 4 karam. Crust 150mm. PC done in 4/2010.<br />
Small patches to be done.<br />
20) H - 1731 Chikken Road To Raowala Kalka<br />
0.41 km.<br />
44588 09-Apr-13<br />
40851 13-Feb-13<br />
18089 14-Feb-12<br />
14051 02-Nov-11<br />
10909 14-Oct-11<br />
Patch work completed in AR 2012-13 Exp. 0.052 lacs.<br />
Work complete in A/R 2012-13.<br />
E.E reported road is patchless.<br />
Constructed 8/1995. Path 4 karam. Crust 150mm. PC done in<br />
12/2010.<br />
Patches 31 sqm done on 11/8/2011 (Expenditure done 7K).<br />
21) H - 1732 Chiken Road To Pattan Kalka<br />
0.43 km.<br />
44589 09-Apr-13<br />
40852 13-Feb-13<br />
18361 17-Feb-12<br />
18090 14-Feb-12<br />
14072 02-Nov-11<br />
Patch work completed in AR 2012-13 Exp. 0.19 lacs.<br />
Work completed in A/R 2012-13.<br />
Constructed 1996 crust 150mm, Path 4 karam S/R 2001, patch + PC<br />
in 2010<br />
E.E reported road is patchless.<br />
(41 sqm) patches done from 13/10/2011 to 16/10/2011<br />
(Expenditure 09K).<br />
22) H - 1733 Bagwali To Bagwala Nariangarh<br />
1.75 km.<br />
44590 09-Apr-13<br />
43771 25-Mar-13<br />
40853 13-Feb-13<br />
14052 02-Nov-11<br />
10906 14-Oct-11<br />
Patch work completed on 20.03.13 in AR 2012-13. Exp. 0.485 lacs.<br />
Patch work completed on 20.03.2013 in A/R.<br />
Patch work will be taken up in A/R 2013-14.<br />
Constructed 6/2002. Path 4 karam. Crust 150mm. PC done in<br />
12/2010.<br />
Patches 145 sqm done from 11/8/2011 to 20/9/2011 (Expenditure<br />
98K).<br />
23) H - 1734 Main Road To Balouti Panchkula<br />
1.50 km.<br />
22028 04-Apr-12<br />
18386 17-Feb-12<br />
10924 30-Jul-11<br />
EE reported, road is patchless.<br />
WBM patches done. PC patches left due to cold weather will be<br />
completed upto 15.03.2012<br />
Constructed 2001. Path 4 karam. Crust 150mm. PC done 6/2009.<br />
Patch work required (EC 44 K)<br />
24) H - 1735 Main Road To Shahajanpur Kalka<br />
2.70 km.<br />
58105 18-Nov-13<br />
57758 13-Nov-13<br />
57095 30-Oct-13<br />
56179 10-Oct-13<br />
55898 01-Oct-13<br />
50985 04-Jul-13<br />
45840 18-Apr-13<br />
43814 25-Mar-13<br />
7790 03-Oct-11<br />
EE reported, Work completed.<br />
Laying of stone metal in progress.<br />
Work allotted on 17.10.2013 ( Sh. Divesh Goyal cont.) and work<br />
started.<br />
Tender approved on 20.09.2013. A/A Rs. 2,69,800/-on 09.10.2013.<br />
Tender in approval process at H.O.<br />
AR work for 2013 - 14 to be done. Work allotted on 29/5/2013.<br />
Transferred back from PWD on 17.4.2013 within a list of 550<br />
(76+474) roads.<br />
HSAMB roads likely back from PWD B&R.<br />
Transferred to PWD. PWD RoadID : 9270<br />
Monday, January 20, 2014 Page 7 of 24
10933 30-Jul-11<br />
Constructed 2002. Path 6 karam. Crust 150mm. No S/R done.<br />
25) H - 1736 Main Road To Madhawala Kalka<br />
0.22 km.<br />
50969 03-Jul-13<br />
44592 09-Apr-13<br />
18091 14-Feb-12<br />
14053 02-Nov-11<br />
10907 14-Oct-11<br />
176.26 Sqm patch done from 20/5/2013 to 22/5/2013 (Exp 44 k).<br />
Road is patch less.<br />
E.E reported road is patchless.<br />
Constructed 6/2002. Path 4 karam. Crust 150mm. 75mm WBM + PC<br />
done in 12/2010.<br />
Patches 21 sqm done on 11/10/2011 to 15/10/2011 (Expenditure<br />
4K).<br />
26) H - 1737 Barwala School To Bhareli Road. Panchkula<br />
0.17 km.<br />
44593 09-Apr-13<br />
40856 13-Feb-13<br />
10888 30-Jul-11<br />
Patch work completed on 23.03.13 in AR 2012-13. Exp. 1.31 lacs.<br />
Patch work requires will be done in A/R 2012-13.<br />
Constructed 1994. Path 4 karam. Crust 150mm. PC done in 8/2011.<br />
27) H - 1738 Punjab Bordar To Sangrana Panchkula<br />
0.25 km.<br />
44594 09-Apr-13<br />
40857 13-Feb-13<br />
10968 30-Jul-11<br />
Patch work completed on 22.03.13 in AR 2012-13. Exp. 0.67 lacs.<br />
Patch work will be done in A/R 2012-13.<br />
Constructed 1994. Path 4 karam. Crust 150mm. PC done in 8/2011.<br />
28) H - 1740 <strong>State</strong> Highway To Kammi. Panchkula<br />
4.24 km.<br />
50963 03-Jul-13<br />
44596 09-Apr-13<br />
40859 13-Feb-13<br />
23671 22-May-12<br />
10970 30-Jul-11<br />
1259.36 Sqm patch done from 30/5/2013 to 2/6/2013 (Exp 285 k).<br />
Road is in good condition.<br />
some patches exist will be repaired in A/R 2013-14.<br />
Work completed on 15.04.2012<br />
Constructed 1994. Path 4 karam. Crust 150mm. Patches + PC<br />
sanctioned on 31/7/2009, allotted on 04/02/2010. 1.7 km PC done<br />
(Sarvan Kumar). Work is proceeding. Likely completion by<br />
15/11/2011.<br />
29) H - 1741 Gogga Mari To Parwala. Kalka<br />
0.37 km.<br />
50811 03-Jul-13<br />
44597 09-Apr-13<br />
40860 13-Feb-13<br />
18092 14-Feb-12<br />
10971 30-Jul-11<br />
241.31 Sqm patch done from 1/6/2013 to 4/6/2013 (Exp 45 k).<br />
Patch work completed on 23.03.13 in AR 2012-13. Exp. 0.06 lacs.<br />
Taken in A/R 2012-13.<br />
E.E reported road is patchless.<br />
Constructed 2001. Path 4 karam. Crust 150mm. PC done in 4/2011.<br />
No patch.<br />
30) H - 1742 Manak Tabra To Rurki Kalka<br />
1.82 km.<br />
50958 03-Jul-13<br />
44598 09-Apr-13<br />
40861 13-Feb-13<br />
22149 04-Apr-12<br />
10972 30-Jul-11<br />
1058.48 Sqm patch done from 8/6/2013 to 11/6/2013 (Exp 233 k).<br />
Road is motorable/Pot hole free<br />
Patch work will be done 2012-13.<br />
Work completed on 31.03.2012<br />
Constructed 1994. Path 4 karam. 720m CC (RD 1100 - 1820m in vill.<br />
Manak Tabra )+ rest PC sanctioned in 2009. CC done in 4/2010. PC<br />
remains.<br />
Monday, January 20, 2014 Page 8 of 24
31) H - 1743 Main Road To Basti Rampur Jangi Kalka<br />
0.76 km.<br />
44599 09-Apr-13<br />
39990 16-Jan-13<br />
37990 07-Dec-12<br />
33223 25-Sep-12<br />
10973 30-Jul-11<br />
S/R in 8th priority completed on 30.11.12.<br />
P.C completed in 690mtr, Final bill under process.<br />
work completed on 30.11.2012.<br />
Work allotted to Sh. Gulshan Kumar & E.M. Forfeated & tender<br />
reinvited on 30.09.2012<br />
Constructed 2001. Path 3 karam. Crust 150m. Patch + PC<br />
sanctioned on 27/9/2010. Tender received on 25/11/2011. AA Rs.<br />
4.68 lacs. Patches be done first.<br />
32) H - 1749 Shamtoo To Amrala Panchkula<br />
1.61 km.<br />
60453 31-Dec-13<br />
50961 03-Jul-13<br />
44602 09-Apr-13<br />
31769 23-Aug-12<br />
10941 30-Jul-11<br />
2860 23-Jan-08<br />
D/E sanctioned for Rs. 1,53,71,100/-.<br />
93.34 Sqm patch done from 11/6/2013 to 11/6/2013 (Exp 17 k).<br />
Road is in good condition.<br />
Cause way still is in damaged condition.<br />
SE Proposes: Repair of cause way required (EC 70 K)<br />
AA for Rs. 22.37 lacs on 23/1/2008. Allotted on 10/4/2008. Road<br />
does not have any patch. Take over the road and final the<br />
measurements. Causeway portion has got damaged. Path 4 karam.<br />
Crust 225mm.<br />
33) H - 1750 Sultan Pur To Jaloli Panchkula<br />
0.80 km.<br />
60454 31-Dec-13<br />
50964 03-Jul-13<br />
44603 09-Apr-13<br />
40863 13-Feb-13<br />
18357 17-Feb-12<br />
D/E sanctioned for Rs. 1,53,71,100/-.<br />
38.34 Sqm patch done from 28/5/2013 to 29/5/2013 (Exp 7k).<br />
Road is in good condition.<br />
Taken in A/R 2012-13.<br />
A/A for Rs. 14.59 lacs on 23.01.2008. Allotted on 10.04.2008 0.8 km<br />
road completed on 04/2010, Crust 225mm, path 4 karam. Out of<br />
0.98 km the dispute/encroachment in 0.18 km in village phirni not<br />
solved, work finalized as it is. Road is through. This road falls in<br />
group of 6 no. new link roads against combined A/A of Rs. 157.01<br />
Lacs vide no. 3825 dated 23.01.08,<br />
34) H - 1751 Shampur To Kazmpur Kalka<br />
0.98 km.<br />
60455 31-Dec-13<br />
50809 03-Jul-13<br />
44604 09-Apr-13<br />
40864 13-Feb-13<br />
21378 22-Mar-12<br />
2863 30-Aug-11<br />
D/E sanctioned for Rs. 1,53,71,100/-.<br />
180.09 Sqm patch done from 1/6/2013 to 4/6/2013 (Exp 51 k).<br />
Patch work completed on 23.03.13. Exp. 0.45 lacs<br />
Taken in A/R 2012-13.<br />
EE reported, road is in Good Condition.<br />
AA for Rs. 16.56 lacs on 23/1/2008. Allotted on 10/4/2008. Road<br />
was completed on 3/2010. Actual length is 0.98km. Measurements<br />
be finalled. 2 patches have appeared on the side of culvert. This be<br />
patched.<br />
35) H - 1752 Chiken Marg To Barahmanwas Kalka<br />
0.14 km.<br />
60456 31-Dec-13<br />
44605 09-Apr-13<br />
40865 13-Feb-13<br />
18093 14-Feb-12<br />
D/E sanctioned for Rs. 1,53,71,100/-.<br />
CC road is in good condition<br />
Taken in A/R 2012-13.<br />
E.E reported road is patchless.<br />
Monday, January 20, 2014 Page 9 of 24
2864 30-Aug-11<br />
AA for Rs. 4.26 lacs on 23/1/2008. Allotted on 10/4/2008.<br />
Completed on 10/2009. It is concrete road. No patches. No problem.<br />
36) H - 1762 Sultan Pur To School Panchkula<br />
0.38 km.<br />
44621 09-Apr-13<br />
44608 09-Apr-13<br />
37979 07-Dec-12<br />
33226 25-Sep-12<br />
23281 15-May-12<br />
10921 14-Oct-11<br />
10897 30-Jul-11<br />
Road is motorable/Patch free<br />
S/R work plan 2012-13 completed on 30.11.12. Exp. 14.63 lacs<br />
Work completed on 30.11.12 paver block laid in 392 mtr, drain in<br />
300 mtr.<br />
Work awarded on 30.05.2012 to Sh. Rajesh Contractor.<br />
AA on 14/5/2012 for Rs. 14.12 lacs.<br />
SE proposes: Pavers on entire length (18 lacs).<br />
Constructed 2001. Crust 150mm. No S/R done. It is village street.<br />
37) H - 1763 Jatwal To Chopehar Kalka<br />
0.90 km.<br />
44609 09-Apr-13<br />
40867 13-Feb-13<br />
39791 16-Jan-13<br />
36355 26-Oct-12<br />
34479 10-Oct-12<br />
10915 14-Oct-11<br />
10893 30-Jul-11<br />
S/R work completed on 05.12.12. Exp. 4.21 lacs<br />
Taken in A/R 2012-13.<br />
PC completed in 622m. Wire carpet left.<br />
Work awarded on 19.10.12 to Sh. Amrit Pal.<br />
AA for Rs. 5.48 lacs on 9/10/2012.<br />
SE proposes: Patch + PC (5 lacs).<br />
Constructed 1996. Crust 150mm. No S/R done. Panchayat has done<br />
CC in 210m.<br />
38) H - 1764 Sotwala To Himachal Border Kalka<br />
0.22 km.<br />
44610 09-Apr-13<br />
37996 07-Dec-12<br />
37889 27-Nov-12<br />
32061 11-Sep-12<br />
23680 22-May-12<br />
22266 06-Apr-12<br />
2853 14-Oct-11<br />
Const.work completed on 24.03.2013. Exp. 5.19 lacs<br />
Work alloted to Sh. Sushil sehgal on 10.09.2012. PC complete. Berm<br />
and stone pitching pending due to dispute of villagers.<br />
SE says: All work complete except stone pitching. Length of about<br />
100m. SE to review if pitching required and get implemented as per<br />
his decision.<br />
Revised AA on 5/9/2012 for Rs. 8.79 lacs. Tender approved on<br />
5/9/2012 (SH. Sushil Kumar Contractor).<br />
The old final payment of contrator to be settled. Estimate under<br />
process for T/S in circle office.<br />
AA on 2.4.2012 (Rs. 7.70 lacs).<br />
AA for Rs 0.99 lacs on 31/3/1994. Allotted on 19/5/1994. WBM<br />
stone was taken (67 cum + 16 cum) and Rs. 15,180/- were paid.<br />
Then a court case was done and Panchayat did not give any<br />
resolution. Court case decided. Panchayat has given resolution<br />
now. Sajra is being taken.<br />
No stone is seen at site.<br />
A fresh estimate be made incorporating the Rs. 15,180/- to be<br />
written off and to make the road after resolution of Panchayat. No<br />
issue is with the contractor.<br />
Road leads to Chitkara University.<br />
39) H - 1766 NH-21 To Tanda Johluwal Kalka<br />
0.61 km.<br />
44629 09-Apr-13<br />
40875 13-Feb-13<br />
Work allotted to Sh. Rajesh Kumar on 8.02.2013. Work completed<br />
on 06.04.13.<br />
Work allotted to Sh. Rajesh kumar on 08.02.2013.<br />
Monday, January 20, 2014 Page 10 of 24
23681 22-May-12<br />
10914 14-Oct-11<br />
10886 30-Jul-11<br />
T/A on 24.02.2012 (Rs. 4.01 lacs). No tender received on 20.03.2012<br />
& 27.04.2012.<br />
SE proposes: Patch + PC (4 lacs).<br />
Constructed 1994. Crust 150mm. No S/R done.<br />
40) H - 1771 NH-21 To Shahpur Kalka<br />
0.59 km.<br />
44611 09-Apr-13<br />
37980 07-Dec-12<br />
33228 25-Sep-12<br />
10920 14-Oct-11<br />
10889 30-Jul-11<br />
S/R work plan 2012-13 completed on 05.12.12. Exp. 14.94 lacs<br />
Work completed on 05.12.12 paver block laid in 490 mtr.<br />
AA on 14/5/2012 for Rs. 19.68 lacs. Work awarded ton 17.05.2012<br />
to Sh. Rahul Sehgel.<br />
SE proposes: Paver blocks on entire (18 lacs).<br />
Constructed 1994. PC done in 1999.<br />
41) H - 4519 Const. Of H.L Bridge 1 Span 12 Mtr Over Tributary Of Panchkula<br />
km.<br />
Sabilpur On Link Road From Sabilpur To Khetpurali<br />
57103 30-Oct-13<br />
56523 17-Oct-13<br />
50807 03-Jul-13<br />
49380 17-Jun-13<br />
44631 09-Apr-13<br />
43819 25-Mar-13<br />
40878 13-Feb-13<br />
2714 24-Aug-11<br />
work completed on 25.10.2013.<br />
Protection work completed.<br />
work allotted on 21.06.2013 and in progress.<br />
A/A on 14.06.2013 for Rs. 20.50 lacs.<br />
Work completed upto slab , balance work in progress. Exp. 32.44<br />
lacs<br />
Work stands allotted to Sh. Varinder Kumar on 01.01.201. The sub<br />
structure work completed and super structure work is in progress.<br />
The tentative date of completeion 15.04.2013.<br />
Work allotted to Sh. Virender kumar at the risk & cost of Sh. Rajat<br />
Punia. Work in progress sinking well 'A' is complete and sinking<br />
well be is in progress.<br />
SDE (Sh. Dhillon) reported that it is part of RoadID 1707. This<br />
proposal has been approved against existing / damaged bridge.<br />
The bridge was washed away due to flood.<br />
42) H - 4723 Approach Road Of Paploha Stadium Kalka<br />
0.39 km.<br />
44612 09-Apr-13<br />
39998 16-Jan-13<br />
37998 07-Dec-12<br />
2857 30-Aug-11<br />
Const.work completed on 26.12.12. Exp. 1.08 lacs<br />
PC completed.<br />
work alloted to Sh. Sunil kumar on 26.10.2012 at risk and cost of<br />
Sh. Sourav Gupta. Yet to start.<br />
AA of Rs. 8.07 lacs on 17/11/2008. Allotted on 18/2/2009. Path = 4<br />
karam. WBM is complete on entire road. Only PC is left. Stadium is<br />
not yet complete. Stadium structure has been made. Risk and cost<br />
work is being done. Risk & cost tenders be called.<br />
43) H - 4725 Approach Road Of Natwal Stadium Panchkula<br />
0.24 km.<br />
44613 09-Apr-13<br />
37999 07-Dec-12<br />
23892 22-May-12<br />
18358 17-Feb-12<br />
const. work completed on 10.10.12. Exp. 4.76 lacs<br />
Work completed on 10.10.12<br />
Work allotted (Sh. Rajesh Kumar) on 14.03.2012.<br />
A/A for Rs. 4.26 lacs onn 04.03.2010, allotted on 29.08.2011<br />
(Bhajan Singh), E/M forfieted. Now tender received on 27.01.2012 ,<br />
under process of allotment.<br />
44) H - 4939 Charnia Bargodam Road To Kheranwali Kalka<br />
0.25 km.<br />
Monday, January 20, 2014 Page 11 of 24
44614 09-Apr-13<br />
40868 13-Feb-13<br />
18094 14-Feb-12<br />
10884 30-Jul-11<br />
CC road is in good condition<br />
Taken in A/R 2012-13.<br />
E.E reported road is patchless.<br />
Constructed 1994. Crust 150mm. PC done in 2001. PC done in 2008<br />
again. No patches.<br />
Sub Total:<br />
36.07 km.<br />
SR Awarded<br />
1) H - 1745 Bhiwar Zohri To Bhiwar Kalka<br />
0.21 km.<br />
61831 17-Jan-14<br />
57759 13-Nov-13<br />
55902 01-Oct-13<br />
53206 14-Aug-13<br />
51383 11-Jul-13<br />
50805 03-Jul-13<br />
47296 16-May-13<br />
44615 09-Apr-13<br />
10975 30-Jul-11<br />
D/E revised with paver blocks and sent to SE (P)<br />
work will be complted upto 30.11.2013.<br />
Work recently started & will be completed by 15.10.2013<br />
The road is beyoud morni and 1km way in between is katcha forest.<br />
Hence the work would be taken up only after rain.<br />
Work not started. Likely completion by 31.7.2013.<br />
Work allotted on 05.06.2013 to Ballu Ram contractor.<br />
Tender was called on 25.04.2013, work allotted, E/M forefieted.<br />
Tender recalled on 17.05.2013.<br />
Work allotted to Sh. Rajiv Sharma on 26.10.12. S/R in 8th priority<br />
will be completed by 15.04.13.<br />
Constructed 2002. Path 4 karam. Crust 150m. Patch + PC<br />
sanctioned on 27/9/2010. Tender received. Recalled. Patches be<br />
done first (EC 1.65 lacs).<br />
2) H - 1757 Bhareli School To Bhagwan Pur Kalka<br />
1.09 km.<br />
61832 17-Jan-14<br />
61608 13-Jan-14<br />
60960 06-Jan-14<br />
57756 13-Nov-13<br />
57235 31-Oct-13<br />
57102 30-Oct-13<br />
51619 18-Jul-13<br />
50986 04-Jul-13<br />
45511 18-Apr-13<br />
43815 25-Mar-13<br />
8138 03-Oct-11<br />
10934 30-Jul-11<br />
Work allotted on 13.01.14. Contractor refused in writing to do the<br />
work and asked for forfeiture of E/M. Tender recalled for 05.02.14.<br />
Tender approved in favour of Sh. Sarvan Kumar contractor. A/A<br />
accorded for Rs. 5.44 lacs.<br />
Returned back to EE, Panchkula on 24.12.2013.<br />
Tender of PC portion (Except Phirni portion) sent to SE for approval<br />
of rates and phirni portion estimate (under phirni development<br />
programme) sent to CE office for administrative approval.<br />
Tender received on 30.10.2013 & under process in division office.<br />
Tender invited for 30.10.2013 for PC work only. Phirni case sent to<br />
Head Office for A/A.<br />
AR work completed.<br />
AR work for 2013 - 14 to be done. Work allotted on 29/5/2013.<br />
Transferred back from PWD on 17.4.2013 within a list of 550<br />
(76+474) roads.<br />
HSAMB roads likely back from PWD B&R.<br />
Transferred to PWD. PWD RoadID : 9265<br />
Constructed 2/1994. Path 6 karam. Crust 150mm. PC done 2000.<br />
3) H - 1761 Rampur To Meer Pur Kalka<br />
1.63 km.<br />
57760 13-Nov-13<br />
57096 30-Oct-13<br />
Supply of metal , earth work in berms in progress.<br />
Work allotted on 17.10.2013 (Sh. Ballu ram cont.) and work started.<br />
Monday, January 20, 2014 Page 12 of 24
56178 10-Oct-13<br />
55899 01-Oct-13<br />
50810 03-Jul-13<br />
44607 09-Apr-13<br />
40866 13-Feb-13<br />
31784 23-Aug-12<br />
22030 04-Apr-12<br />
10896 30-Jul-11<br />
Tender approved on 20.09.2013. A/A Rs. 12,05,200/- and rates also<br />
approved on 10.10.2013.<br />
Tender in approval process at H.O.<br />
675.69 Sqm patch done from 1/6/2013 to 4/6/2013 (Exp 1.30 lacs).<br />
Patch work completed on 23.03.13 in AR 2012-13. Exp. 0.90 lacs.<br />
Taken in A/R 2012-13.<br />
S/R required in 1373 mtr. Balance portion not constructed due to<br />
dispute.<br />
EE reported, road is patchless.<br />
Constructed 2001. Crust 150mm. No S/R done.<br />
Sub Total:<br />
2.93 km.<br />
SR sanctioned but yet to be awarded<br />
1) H - 1698 Pinjore Nalagarh Road To Nanakpur Via Tibbi Kalka<br />
0.67 km.<br />
61830 17-Jan-14<br />
60465 31-Dec-13<br />
58106 18-Nov-13<br />
57237 31-Oct-13<br />
57098 30-Oct-13<br />
50966 03-Jul-13<br />
47794 30-May-13<br />
44619 09-Apr-13<br />
40837 13-Feb-13<br />
39979 16-Jan-13<br />
31782 23-Aug-12<br />
18082 14-Feb-12<br />
10980 14-Oct-11<br />
Tender recalled due to higher rates as per order of Chief Engineer,<br />
for 05.02.14 .<br />
D/E technically sanctioned for Rs. 79,20,926/-. (2nd priority).<br />
Tender received on 15.11.2013.<br />
No tender received on 30.10.2013 , now re-invited and due to be<br />
received on 15.11.2013.<br />
Tender invited for 30.10.2013.<br />
235.83 Sqm patch done from 7/6/2013 to 8/6/2013 (Exp 62 k).<br />
AR tender on 29.05.2013 received and work allotted on 29.05.2013.<br />
Patch work done on 31.03.13. Exp. 1.25 lacs<br />
Taken in A/R 2012-13.<br />
S/R required.<br />
Road is motorable but strengthening repair required due to<br />
villagers street portion , last S/R completed in 06, 2008.<br />
E.E reported road is patchless.<br />
Constructed 1994. Path 4 karam. Crust 150mm. Patches (62 sqm)<br />
done on 10/8/2011 to 6/9/2011 (14 K).<br />
Sub Total:<br />
0.67 km.<br />
SR Un-awarded<br />
1) H - 1699 Pinjore Nalagarh Road To Sito Majra Kalka<br />
1.03 km.<br />
61827 17-Jan-14<br />
60466 31-Dec-13<br />
58107 18-Nov-13<br />
57238 31-Oct-13<br />
57099 30-Oct-13<br />
47795 30-May-13<br />
44620 09-Apr-13<br />
40838 13-Feb-13<br />
Tender with Chief Engineer for decision of rates.<br />
D/E technically sanctioned for Rs. 79,20,926/-. (2nd priority).<br />
Tender received on 15.11.2013.<br />
No tender received on 30.10.2013 , now re-invited and due to be<br />
received on 15.11.2013.<br />
Tender invited for 30.10.2013.<br />
AR tender on 29.05.2013 received and work allotted on 29.05.2013.<br />
SR required.<br />
In 60 mtr length village Panchayat is laying sewrage line in<br />
centered road<br />
Taken in A/R 2012-13.<br />
Monday, January 20, 2014 Page 13 of 24
39980 16-Jan-13<br />
31775 23-Aug-12<br />
22025 04-Apr-12<br />
18383 17-Feb-12<br />
10922 30-Jul-11<br />
50'+40' portion damaged need repair. R/C/E under preparation.<br />
Repair required due to gradient, last repair was done in 03, 2008<br />
EE reported, road is patchless.<br />
WBM patches done. PC patches left due to cold weather will be<br />
completed upto 15.03.2012<br />
Constructed 1994. Path 4 karam. Crust 150mm. PC done 3/2008.<br />
Patch required (EC 45 K)<br />
2) H - 1704 Kalka Bar Godam Road To Pargian Kalka<br />
0.89 km.<br />
61828 17-Jan-14<br />
60923 06-Jan-14<br />
60573 02-Jan-14<br />
60471 31-Dec-13<br />
57236 31-Oct-13<br />
57100 30-Oct-13<br />
47798 30-May-13<br />
44577 09-Apr-13<br />
40871 13-Feb-13<br />
36352 26-Oct-12<br />
10919 14-Oct-11<br />
10890 30-Jul-11<br />
Tender with Chief Engineer for decision of rates.<br />
Returned for reduction of rates.<br />
Work Plan-2: Tender in head office with C.E.<br />
D/E technically sanctioned for Rs. 79,20,926/-. (2nd priority).<br />
No tender received on 30.10.2013 , now re-invited and due to be<br />
received on 15.11.2013.<br />
Tender invited for 30.10.2013.<br />
Balance work will be got completed upto 20.06.2013.<br />
paver blocks in 280 mtr laid on 23.3.13 ,Heavy patch work required<br />
in 610 mtr. Exp. 8.36 lacs<br />
Paver block laid in 240m out of 280m.<br />
AA for Rs. 9.30 lacs on 9/10/2012. Work awarded on 19.10.12 to<br />
Sh. Rahul Sahgal.<br />
SE proposes: Paver blocks in 300 m (cost 8.60 lacs).<br />
Constructed 1995. Crust 150mm. 75mm WBM + PC done in 8/2008.<br />
3) H - 1710 Bataur To H.M.T Colony Panchkula<br />
2.10 km.<br />
61829 17-Jan-14<br />
57755 13-Nov-13<br />
57101 30-Oct-13<br />
55897 01-Oct-13<br />
44623 09-Apr-13<br />
44836 09-Apr-13<br />
40876 13-Feb-13<br />
31797 23-Aug-12<br />
10983 14-Oct-11<br />
Rates approved on 06.01.14. Work allotted on 08.1.14.<br />
Sent to CE office for approval of rates.<br />
Tender case sent to CE for approval of rates.<br />
Tender re-invited for 15.10.2013<br />
Patch work done on 24.03.13 in A/R 2012-13. Good condition in 1<br />
km and motorable in 1.1 km. Exp. 1.47 lacs.<br />
EE reported, Road is patchless.<br />
Taken in A/R 2012-13.<br />
under transfer to MC.<br />
Constructed 2001. Path 4 karam. Crust 150mm. Patch + PC done in<br />
2/2007. Patches (400 sqm) done on 10/8/2011 to 6/9/2011 (30k).<br />
2. New Construction<br />
Sub Total:<br />
4.02 km.<br />
New Construction - Awarded<br />
1) H - 4724 Approach Road Of Naggal Stadium Panchkula<br />
0.76 km.<br />
61835 17-Jan-14<br />
59776 11-Dec-13<br />
E/M of Ashwani Kumar forfeited and tender called on 15.01.14. No<br />
tender received on 15.01.14. now tender to be recalled on 05.02.14.<br />
Earth not available.<br />
Monday, January 20, 2014 Page 14 of 24
57097 30-Oct-13<br />
56568 23-Oct-13<br />
56541 22-Oct-13<br />
56526 17-Oct-13<br />
55905 01-Oct-13<br />
50808 03-Jul-13<br />
44634 09-Apr-13<br />
39999 16-Jan-13<br />
37890 27-Nov-12<br />
36370 26-Oct-12<br />
33214 25-Sep-12<br />
2851 02-Mar-10<br />
Work allotted on 25.10.2013 (Sh. Ashwani Kumar cont.) and yet to<br />
start.<br />
R/A/A granted for Rs. 13,89,500/-<br />
RAA for Rs. 13.89 lacs on dated 22.10.2013 and tender also<br />
approved on dated 22.10.2013.<br />
Tender under process in HQ.<br />
Tender submitted in H.O. for approval of rates<br />
Tender to be received on 08.07.2013.<br />
Trees removed by Secretary MC PKL. Area is under Municipal corp.<br />
PKL. Earth not available nearby , MC asked to intimate source of<br />
earth.<br />
XEN met D.C. PKL to direct E.O-cum-Secretary municipal<br />
corporation, PKL to remove trees.<br />
Discussed with SE. SE says there is land dispute. When land is not<br />
handed over, close the contract because we do not want disputes<br />
with contractor. Land be arranged trees removed and then tenders<br />
be invited.<br />
D.C. ordered on 12.09.2012 to EO MC to get the tree cut. Action<br />
still awaited.<br />
95 no trees are in the alingment, D.C. Panchkula ordered E.O<br />
muncipal corporation to cut the trees to be allot on 27.12.11 to Sh.<br />
Balla Contractor.<br />
AA for Rs. 8.91 lacs on 2/3/2010. Allotted on 17/1/2011. Path -4<br />
karam. Work not started. Earnest Money forfieted. Tenders on<br />
6/9/2011.<br />
Sub Total:<br />
0.76 km.<br />
New Construction - Unawarded<br />
1) H - 1747 Taparian To Rattewali Panchkula<br />
2.91 km.<br />
61833 17-Jan-14<br />
60451 31-Dec-13<br />
59777 11-Dec-13<br />
44632 09-Apr-13<br />
2830 25-Aug-11<br />
2858 23-Jan-08<br />
Rates approved and work allotted on 10.01.14.<br />
D/E sanctioned for Rs. 1,53,71,100/-.<br />
EE told that agency called for reduction of rates.<br />
Tenders re-invited on 25.04.2013 for balance work i.e. Const. of 6<br />
no. Link roads.<br />
PC 1.50 km in 3/2010. WBM 2.7km. Action under clause II and III<br />
taken on 21/10/2009, 4/1/2011. Final bill measurment taken on<br />
16/7/2011.<br />
AA for Rs. 51.41 lacs on 23/1/2008. Allotted on 10/4/2008.<br />
Path=4karam. 1.5km road is totally complete. Work involves<br />
150mm WBM. In 1.21km WBM is complete. Agency is G. J. Singh. In<br />
rest 200m, there was land dispute which has been settled. There is<br />
a culvert (slab) of 3m span.<br />
2) H - 1748 Rattewali Tibbi To Khetpurali Panchkula<br />
3.15 km.<br />
61834 17-Jan-14<br />
60452 31-Dec-13<br />
59778 11-Dec-13<br />
57762 13-Nov-13<br />
44633 09-Apr-13<br />
Rates approved and work allotted on 10.01.14.<br />
D/E sanctioned for Rs. 1,53,71,100/-.<br />
EE told that agency called for reduction of rates.<br />
Tender case sent to CE office for approval.<br />
Tenders re-invited on 25.04.2013 for balance work i.e. Const. of 6<br />
no. Link roads.<br />
Monday, January 20, 2014 Page 15 of 24
2859 30-Aug-11<br />
AA for Rs. 47.82 lacs of 23/1/2008. Allotted on 10/4/2008. Path - 4<br />
karam. 1.5km WBM is complete. In rest of the road, the<br />
specifications are not appropriate. SDE, EE, SE are of conclusion<br />
that the present specification would be a waste in the rest of the<br />
road. Contract be curtailed to 1.5km and for rest revised AA and<br />
detailed estimate technical sanction be initiated immediately.<br />
Detailed estimate & Revised AA case to be submitted by 5/9/2011.<br />
No work has been done beyond 1.5km.<br />
3. Under Planning<br />
Sub Total:<br />
6.06 km.<br />
PR with AM Office<br />
1) H - 6822 Thandon to Nimwala Kalka<br />
5.50 km.<br />
46719 03-May-13<br />
42198 13-Mar-13<br />
41700 06-Mar-13<br />
41699 06-Mar-13<br />
41491 28-Feb-13<br />
Case sent to Hon'ble AM vide PSA no.698 dated 11/04/2013<br />
Case sent to PSA on 13.03.2013.<br />
Upward of EIC on 6.3.2013 for appropriate decision of the<br />
Government.<br />
Path Nil. No distance shortened. Does not falls in the policy of the<br />
board.<br />
On the request of Garm Panchayat Nimawal Hon'ble CM for<br />
examine and take necessary action.<br />
2) H - 7133 Rehoar phirni to vill. Rehoar bandh Panchkula<br />
0.86 km.<br />
59003 03-Dec-13<br />
57974 15-Nov-13<br />
53728 29-Aug-13<br />
51585 16-Jul-13<br />
Case sent to Hon'ble A.M. vide PSA Memo No. 2777 dated<br />
06.11.2013.<br />
Case sent to PSA vide CA memo no. 669 dated 31.10.2013.<br />
PR sent to CA on 29.8.2013.<br />
Request of Gram Panchayat Batour Hon'ble CM forwarded for<br />
appropriate action . Path is 6 karam kila cut.<br />
3) H - 7134 Bataur High School to vill. Mouli Panchkula<br />
3.12 km.<br />
59099 03-Dec-13<br />
57998 15-Nov-13<br />
53726 29-Aug-13<br />
51586 16-Jul-13<br />
Case sent to Hon'ble A.M. vide PSA Memo No. 2885 dated<br />
06.11.2013.<br />
Case sent to PSA vide CA memo no. 644 dated 31.10.2013.<br />
PR sent to CA on 29.8.2013.<br />
Request of Gram Panchayat Batour Hon'ble CM forwarded for<br />
appropriate action . Path is 7 karam angled kila cut.<br />
4) H - 7231 NH-73 to Village Naggal Panchkula<br />
0.60 km.<br />
58985 03-Dec-13<br />
57981 15-Nov-13<br />
57173 31-Oct-13<br />
56112 08-Oct-13<br />
55267 18-Sep-13<br />
Case sent to Hon'ble A.M. vide PSA Memo No. 2758 dated<br />
06.11.2013.<br />
Case sent to PSA vide CA memo no. 662 dated 31.10.2013.<br />
P/R sent to CA vide EIC memo no. 2768 dated 14.10.2013.<br />
EE reported that road is to be constructed on Samlat land and no<br />
distance shortened with the const. of this road.<br />
On the request of Sh. Ram Kishan Gujjar, CPS Industuries & IT<br />
Hon'ble CM ordered on 11.04.2013 that the feasibility report<br />
alongwith estimate be submitted to hime for his consideration. No<br />
revenue path available.<br />
Monday, January 20, 2014 Page 16 of 24
5. Transferred<br />
Sub Total:<br />
10.08 km.<br />
Transferred to MC<br />
1) H - 1694 Dharampur To Kanguwal Kalka<br />
2.97 km.<br />
60461 31-Dec-13<br />
56579 24-Oct-13<br />
50991 04-Jul-13<br />
43808 25-Mar-13<br />
40869 13-Feb-13<br />
39977 16-Jan-13<br />
33225 25-Sep-12<br />
27914 20-Jul-12<br />
10911 14-Oct-11<br />
10892 30-Jul-11<br />
D/E technically sanctioned for Rs. 79,20,926/-. (2nd priority).<br />
EE reported: Road transter to MC on 21.10.2013.<br />
AR work for 2013-14 allotted to M/s Dynamic Constn. Co. on<br />
16/5/2013 shown transferred to MC but not taken over by MC so<br />
far.<br />
Transfer to MC vide his office memo no. 715 dated 07.02.2013.<br />
PC done in 730m out of 800m.<br />
Paver block laid in 400mtr, Brick on edge paving on berms<br />
completed. P.C on patch over a Stretch of 800 mtr in progress.<br />
Work awarded 16.07.2012 to Sushel Kumar, 200m paver block layer.<br />
AA on 11/7/2012 for Rs. 23.36 lacs. SR allotted on 16.07.12 (Sh.<br />
Sushil kumar).<br />
SE proposes: 400m paver blocks (20 lacs).<br />
Constructed 1996. Crust 150mm. In 460m, committee had laid<br />
paver block. PC done in 6/2008 in 2.51 km. In about 400m<br />
additional paver through colonies. Rest of the road is without<br />
patches.<br />
2) H - 1702 Kalka Bar Godown Road To Tagra Kaliram Kalka<br />
0.19 km.<br />
60469 31-Dec-13<br />
56610 24-Oct-13<br />
50992 04-Jul-13<br />
43810 25-Mar-13<br />
31796 23-Aug-12<br />
22143 04-Apr-12<br />
18363 17-Feb-12<br />
D/E technically sanctioned for Rs. 79,20,926/-. (2nd priority).<br />
EE reported: Road transter to MC on 23.10.2013.<br />
AR work for 2013-14 allotted to M/s Dynamic Constn. Co. on<br />
16/5/2013 shown transferred to MC but not taken over by MC so<br />
far.<br />
Transfer to MC vide his office memo no. 715 dated 07.02.2013.<br />
under transfer to MC.<br />
Work completed on 31.03.2012.<br />
Constructed 6/1996, path 4 karam. Crust 150mm. PC done in 2001,<br />
patches +PC sanction 15.05.2006 allotted on 19.06.2006<br />
3) H - 1703 Kalka Bar Godam Road To Tagra Sahu. Kalka<br />
0.58 km.<br />
60470 31-Dec-13<br />
56611 24-Oct-13<br />
50993 04-Jul-13<br />
22141 04-Apr-12<br />
18382 17-Feb-12<br />
18362 17-Feb-12<br />
18108 14-Feb-12<br />
D/E technically sanctioned for Rs. 79,20,926/-. (2nd priority).<br />
EE reported: Road transter to MC on 23.10.2013.<br />
AR work for 2013-14 allotted to M/s Dynamic Constn. Co. on<br />
16/5/2013 shown transferred to MC but not taken over by MC so<br />
far.<br />
Transferred to MC.<br />
The matter for damaged crushed of the road is being taken up with<br />
PH department for its restrotion.<br />
Constructed 5/1996. Path 4 karam, Crust 150mm. PC done in 2001.<br />
Patches +PC sanction 18.05.2006, allotted on 19.09.2006<br />
Likely date 31.03.2012.<br />
Monday, January 20, 2014 Page 17 of 24
17363 11-Jan-12<br />
Before the Tenders Previous Agency has promised to execute and<br />
complete the work. But the XEN, PKL has informed that PHED has<br />
laid the water supply pipe line and has completely damaged the<br />
crust of the road in entire length.<br />
4) H - 1709 National Highway To Chhota Bhanu Panchkula<br />
1.07 km.<br />
60475 31-Dec-13<br />
56606 24-Oct-13<br />
44579 09-Apr-13<br />
40842 13-Feb-13<br />
10982 14-Oct-11<br />
D/E technically sanctioned for Rs. 79,20,926/-. (2nd priority).<br />
EE reported: Road transter to MC on 22.10.2013.<br />
Patch work completed on 24.03.13. Exp. 0.63 lacs.<br />
Patch work in A/R 2012-13.<br />
Constructed 2001. Path 4 karam. Crust 150mm. Patches (405 sqm)<br />
done on 10/8/2011 to 6/9/2011 (20k).<br />
5) H - 1712 Mansa Devi Mandir Road To Saketri Panchkula<br />
0.38 km.<br />
60436 31-Dec-13<br />
60268 21-Dec-13<br />
56602 24-Oct-13<br />
47800 30-May-13<br />
44580 09-Apr-13<br />
10984 14-Oct-11<br />
D/E sanctioned for Rs. 84,54,164/-. (5th priority)<br />
D/E tech. sanctioned for Rs. 8454164/- for a group of 1724, 1712,<br />
1725, 1726, 1714, 1727, 1715, 1716, 1717, 1718, 1719, 1720, 1721,<br />
1722 & 1723.<br />
EE reported: Road transter to MC on 22.10.2013.<br />
AR tender on 29.05.2013 received and work allotted on 29.05.2013.<br />
Road is patch less.<br />
Constructed 1994. Path 4 karam. Crust 150mm. Patch + PC in<br />
9/2010. Patches (37sqm) done on 21/10/2011 to 23/10/2011 (07K).<br />
6) H - 1713 Kalka Chandigarh Road To Beer Ghaggar Panchkula<br />
0.80 km.<br />
60438 31-Dec-13<br />
56601 24-Oct-13<br />
47801 30-May-13<br />
44581 09-Apr-13<br />
43766 25-Mar-13<br />
40843 13-Feb-13<br />
39982 16-Jan-13<br />
37988 07-Dec-12<br />
31802 23-Aug-12<br />
10985 14-Oct-11<br />
D/E sanctioned for Rs. 84,54,164/-. (5th priority)<br />
EE reported: Road transter to MC on 21.10.2013.<br />
AR tender on 29.05.2013 received and work allotted on 29.05.2013.<br />
Patch work completed on 10.12.12 Exp. 0.22 lacs.<br />
Patch work completed on 10.12.2012 in A/R.<br />
patch work done in A/R 2012-13.<br />
A/R done on 10.12.2012.<br />
work completed on 26.11.2012.<br />
under transfer to MC. But road portion dismantled by PWD /PH is<br />
being taken up against the funds deposited by P.H.<br />
Constructed 1996. Path 4 karam. Crust 150mm. Patch + PC in<br />
4/2009. Patches (78sqm) done on 21/10/2011 to 23/10/2011 (15K).<br />
7) H - 1716 National Highway To Alipur Town Panchkula<br />
0.31 km.<br />
60443 31-Dec-13<br />
60274 21-Dec-13<br />
56607 24-Oct-13<br />
50962 03-Jul-13<br />
44582 09-Apr-13<br />
40844 13-Feb-13<br />
D/E sanctioned for Rs. 84,54,164/-. (5th priority)<br />
D/E tech. sanctioned for Rs. 8454164/- for a group of 1724, 1712,<br />
1725, 1726, 1714, 1727, 1715, 1716, 1717, 1718, 1719, 1720, 1721,<br />
1722 & 1723.<br />
EE reported: Road transter to MC on 22.10.2013.<br />
208.65 Sqm patch done from 26/5/2013 to 27/5/2013 (Exp 39 k).<br />
Road is in good condition<br />
Patch work taken in A/R 2012-13. A/R required will be done in 2013-<br />
14.<br />
Monday, January 20, 2014 Page 18 of 24
31783 23-Aug-12<br />
10986 14-Oct-11<br />
Road is motorable condition.<br />
Constructed 1995. Path 4 karam. Crust 150mm. Patch + PC in<br />
4/2009. Patches (25 sqm) done in 10/8/2011 to 6/9/2011 (3.6K).<br />
8) H - 1718 Kalka Ramgarh Road To Nada Panchkula<br />
0.46 km.<br />
60445 31-Dec-13<br />
60276 21-Dec-13<br />
56604 24-Oct-13<br />
50994 04-Jul-13<br />
43806 25-Mar-13<br />
40877 13-Feb-13<br />
31795 23-Aug-12<br />
404 31-Jul-11<br />
10939 30-Jul-11<br />
D/E sanctioned for Rs. 84,54,164/-. (5th priority)<br />
D/E tech. sanctioned for Rs. 8454164/- for a group of 1724, 1712,<br />
1725, 1726, 1714, 1727, 1715, 1716, 1717, 1718, 1719, 1720, 1721,<br />
1722 & 1723.<br />
EE reported: Road transter to MC on 22.10.2013.<br />
AR work for 2013-14 allotted to M/s Dynamic Constn. Co. on<br />
16/5/2013 shown transferred to MC but not taken over by MC so<br />
far.<br />
Transfer to MC vide his office memo no. 715 dated 07.02.2013.<br />
Taken in A/R 2012-13.<br />
Under transfer to M.C.<br />
EE Reported, Road is in Good Condition.<br />
Constructed 6/1993. Path 4 karam. Crust 150mm. PC done 5/2010.<br />
No patches.<br />
9) H - 1722 Ram Bagh Road To Bahiaron Ki Sair Kalka<br />
0.70 km.<br />
60449 31-Dec-13<br />
60280 21-Dec-13<br />
56598 24-Oct-13<br />
50989 04-Jul-13<br />
44625 09-Apr-13<br />
31798 23-Aug-12<br />
18086 14-Feb-12<br />
10989 14-Oct-11<br />
D/E sanctioned for Rs. 84,54,164/-. (5th priority)<br />
D/E tech. sanctioned for Rs. 8454164/- for a group of 1724, 1712,<br />
1725, 1726, 1714, 1727, 1715, 1716, 1717, 1718, 1719, 1720, 1721,<br />
1722 & 1723.<br />
EE reported: Road transter to MC on 21.10.2013.<br />
E.O./Xen, MC requested to take over this road but not taken over<br />
so far. However AR work for 2013-14 allotted on 29/5/2013.<br />
Road is patch less.<br />
Under transfer to MC.<br />
E.E reported road is patchless.<br />
Constructed 1996. Path 4 karam. Crust 150mm. Patch + PC in<br />
6/2009. Patches (68 sqm) done in 11/10/2011 to 13/10/2011 (15K).<br />
10) H - 1725 Pinjore Tipra Marg To Ghatiwala Harijan Basti Kalka<br />
0.37 km.<br />
60437 31-Dec-13<br />
60269 21-Dec-13<br />
44635 24-Oct-13<br />
44626 09-Apr-13<br />
31799 23-Aug-12<br />
18087 14-Feb-12<br />
14069 02-Nov-11<br />
10990 14-Oct-11<br />
D/E sanctioned for Rs. 84,54,164/-. (5th priority)<br />
D/E tech. sanctioned for Rs. 8454164/- for a group of 1724, 1712,<br />
1725, 1726, 1714, 1727, 1715, 1716, 1717, 1718, 1719, 1720, 1721,<br />
1722 & 1723.<br />
EE reported: Road transter to MC on 21.10.2013.<br />
Patch work completed on 22.03.13 in AR 2012-13. Exp. 0.18 lacs.<br />
under transfer to MC.<br />
E.E reported road is patchless.<br />
(36 sqm) patches done from 21/10/2011 to 23/10/2011<br />
(Expenditure 7K).<br />
Constructed 1996. Path 4 karam. Crust 150mm. Patch + PC in<br />
10/2009.<br />
11) H - 1726 Housing <strong>Board</strong> Colony Kalka To Karari Kalka<br />
0.33 km.<br />
Monday, January 20, 2014 Page 19 of 24
60439 31-Dec-13<br />
60270 21-Dec-13<br />
56612 24-Oct-13<br />
50990 04-Jul-13<br />
44630 09-Apr-13<br />
31800 23-Aug-12<br />
18088 14-Feb-12<br />
14070 02-Nov-11<br />
10991 14-Oct-11<br />
D/E sanctioned for Rs. 84,54,164/-. (5th priority)<br />
D/E tech. sanctioned for Rs. 8454164/- for a group of 1724, 1712,<br />
1725, 1726, 1714, 1727, 1715, 1716, 1717, 1718, 1719, 1720, 1721,<br />
1722 & 1723.<br />
EE reported: Road transter to MC on 23.10.2013.<br />
E.O./Xen, MC requested to take over this road but not taken over<br />
so far. However AR work for 2013-14 allotted on 29/5/2013.<br />
Road is in good condition.<br />
Under transfer to MC.<br />
E.E reported road is patchless.<br />
(32 sqm) patches done from 21/10/2011 to 23/10/2011<br />
(Expenditure 6K).<br />
Constructed 1996. Path 4 karam. Crust 150mm. Patch + PC in<br />
6/2009.<br />
12) H - 1728 Main Road To Shukhdarshanpur Panchkula<br />
1.12 km.<br />
56608 24-Oct-13<br />
44585 09-Apr-13<br />
43769 25-Mar-13<br />
40848 13-Feb-13<br />
31780 23-Aug-12<br />
22026 04-Apr-12<br />
18384 17-Feb-12<br />
10923 30-Jul-11<br />
EE reported: Road transter to MC on 22.10.2013.<br />
Patch work completed on 23.03.13 in AR 2012-13. Exp. 0.82 lacs.<br />
Patch work completed on 23.03.2013 in A/R.<br />
Taken in A/R 2012-13 in the year 2013-14.<br />
Road is mortorable condition, small patch work is being taken in<br />
A/R.<br />
EE reported, road is patchless.<br />
WBM patches done. PC patches left due to cold weather will be<br />
completed upto 15.03.2012<br />
Constructed 2001. Path 4 karam. Crust 150mm. PC done 6/2009.<br />
Patch work required (EC 50 K)<br />
13) H - 1739 Billa To Assrewali. Panchkula<br />
0.50 km.<br />
56609 24-Oct-13<br />
44595 09-Apr-13<br />
40858 13-Feb-13<br />
10969 30-Jul-11<br />
EE reported: Road transter to MC on 21.10.2013.<br />
Patch work completed on 18.03.13 in AR 2012-13. Exp. 0.61 lacs.<br />
Taken in A/R 2012-13.<br />
Constructed 1994. Path 4 karam. Crust 150mm. PC done in 8/2011.<br />
No patch.<br />
14) H - 1744 Kalka Bargodam Road To Majra Mehtab. Kalka<br />
0.16 km.<br />
56613 24-Oct-13<br />
44600 09-Apr-13<br />
39991 16-Jan-13<br />
37991 07-Dec-12<br />
33224 25-Sep-12<br />
10974 30-Jul-11<br />
EE reported: Road transter to MC on 23.10.2013.<br />
S/R in 8th priority completed on 05.12.12. Exp. 1.46 lacs<br />
P.C completed in 160mtr.<br />
work completed on 05.12.2012.<br />
Work allotted to Sh. Gulshan Kumar, work not allotted E.M.<br />
forfeated & tender was received on 30.09.2012<br />
Constructed 1994. Path 4 karam. Crust 150m. Patch + PC<br />
sanctioned on 27/9/2010. Work yet to be done. Tender received.<br />
Recalled patches be done first (E/C 1.15 lacs).<br />
15) H - 1746 National Highway To Village Kisangarh Panchkula<br />
0.18 km.<br />
56605 24-Oct-13<br />
EE reported: Road transter to MC on 22.10.2013.<br />
Monday, January 20, 2014 Page 20 of 24
44601 09-Apr-13<br />
39992 16-Jan-13<br />
37993 07-Dec-12<br />
10976 30-Jul-11<br />
S/R in 8th priority completed on 26.11.12 Exp. 1.57 lacs<br />
P.C completed in 187mtr.<br />
Work completed on 26.11.2012.<br />
Constructed 2001. Path 4 karam. Crust 150m. Patch + PC<br />
sanctioned in 2010. Tender received. Falls in MC area.<br />
16) H - 1756 Kalka Chandigarh Road To Chandi & Chandi Kotla Kalka<br />
1.26 km.<br />
56599 24-Oct-13<br />
44606 09-Apr-13<br />
37978 07-Dec-12<br />
33227 25-Sep-12<br />
29055 20-Jul-12<br />
11061 17-Oct-11<br />
10891 30-Jul-11<br />
EE reported: Road transter to MC on 21.10.2013.<br />
S/R work plan 2012-13 completed on 10.10.12. Exp. 8.65 lacs<br />
Work completed on 10.10.12 paver block in 230 mtr.<br />
Work awarded to Sushel Sedgal on 16.07.2012. 230m Paver Block<br />
complete, likely date 15.10.2012<br />
AA on 11/7/2012 for Rs. 12.23 lacs.<br />
SE proposes: 300m paver block over GSB and in 200m hard<br />
shouldering with paver block (EC: 12 lacs).<br />
Constructed 1995. Crust 150mm. PC done in 2002. Panchayat has<br />
done CC in 750m. CC has also broken.<br />
17) H - 1758 Kalka Chandigarh Road To Bhagwanpur Kalka<br />
1.61 km.<br />
56600 24-Oct-13<br />
50970 03-Jul-13<br />
43807 25-Mar-13<br />
31801 23-Aug-12<br />
22029 04-Apr-12<br />
18388 17-Feb-12<br />
10894 30-Jul-11<br />
EE reported: Road transter to MC on 21.10.2013.<br />
1256.87 Sqm patch done from 23/5/2013 to 26/5/2013 (Exp 308 k).<br />
Transfer to MC vide his office memo no. 715 dated 07.02.2013.<br />
under transfer to MC.<br />
EE reported, road is patchless.<br />
WBM patches done. PC patches left due to cold weather will be<br />
completed upto 15.03.2012<br />
Constructed 1996. Crust 150mm. PC done in 2006.<br />
18) H - 1759 Uprli Kundi To Nichli Kundi Kalka<br />
1.48 km.<br />
56603 24-Oct-13<br />
43809 25-Mar-13<br />
10927 30-Jul-11<br />
EE reported: Road transter to MC on 22.10.2013.<br />
Transfer to MC vide his office memo no. 715 dated 07.02.2013.<br />
Constructed 8/1995. Path 4 karam. Crust 150mm. MC Panchkula<br />
taken over road in 2005, CC done (entire).<br />
19) H - 1768 <strong>State</strong> Bank Kalka To Tipra Kalka<br />
1.31 km.<br />
56597 24-Oct-13<br />
50987 04-Jul-13<br />
45510 18-Apr-13<br />
43817 25-Mar-13<br />
43336 19-Mar-13<br />
7791 03-Oct-11<br />
10936 30-Jul-11<br />
EE reported: Road transter to MC on 21.10.2013.<br />
E.O/XEN MC, requested to take over the road but not AR work for<br />
2013 - 14 to be done. Work allotted on 29/5/2013.<br />
Transferred back from PWD on 17.4.2013 within a list of 550<br />
(76+474) roads.<br />
HSAMB roads likely back from PWD B&R.<br />
PWD executing / has executed work worth 57 lacs.<br />
Transferred to PWD. PWD RoadID : 9261<br />
Constructed 1/1990. Path 6 karam. Crust 150mm. No record of S/R.<br />
Sub Total:<br />
15.78 km.<br />
Transferred to PWD (938 roads)<br />
Panchkula<br />
Monday, January 20, 2014 Page 21 of 24
1) H - 1708 Khatauli To Rehwar Panchkula<br />
4.30 km.<br />
60474 31-Dec-13<br />
7876 03-Oct-11<br />
10929 30-Jul-11<br />
D/E technically sanctioned for Rs. 79,20,926/-. (2nd priority).<br />
Transferred to PWD. PWD RoadID : 9267<br />
Constructed 1995. Path 6 karam. Crust 150mm. (30m) CC + PC<br />
(rest) done 2/2007.<br />
2) H - 1711 National Highway To Kammi Road Via Naggal Panchkula<br />
1.20 km.<br />
60477 31-Dec-13<br />
43335 19-Mar-13<br />
7875 03-Oct-11<br />
10930 30-Jul-11<br />
D/E technically sanctioned for Rs. 79,20,926/-. (2nd priority).<br />
PWD executing / has executed work worth 41.56 lacs.<br />
Transferred to PWD. PWD RoadID : 9264<br />
Constructed 2001. Path 8 karam. Crust 150mm. PC done 4/2007.<br />
3) H - 1767 Firozpur To Hangola Kalka<br />
4.02 km.<br />
13972 31-Oct-11<br />
10935 30-Jul-11<br />
There was a proposal to shift alignment of 320m due to court case.<br />
AA was also granted. The approval was arranged as High Court<br />
ordered shifting the road portion on actual alignment. The Court<br />
case has been withdrawn. We need to ensure that AA is<br />
withdrawn. Whatever is to be done it would be done by PWD.<br />
Constructed 3/1990. Path 6 karam. Crust 150mm. PC done 2002.<br />
Transferred to PWD. PWD RoadID : 9269<br />
4) H - 1770 Islamnagar To Bakshiwala Kalka<br />
1.40 km.<br />
7788 03-Oct-11<br />
10937 30-Jul-11<br />
Transferred to PWD. PWD RoadID : 8344<br />
Constructed 1993. Path 6 karam. Crust 150mm. PC done 2002.<br />
Sub Total:<br />
10.92 km.<br />
Transferred to PWD (Individual)<br />
1) H - 1760 Hangoli To Sanmanva Kalka<br />
1.29 km.<br />
22909 03-May-12<br />
10925 30-Jul-11<br />
Part of PWD road added casuse mis match reported by SDE Dhillion<br />
Constructed 12/1997. Path 6 karam. Crust 150mm. PC done 2001.<br />
PWD Road ID 8605. PWD length mismatch.<br />
2) H - 1769 Manak Tabra To Toka Kalka<br />
3.60 km.<br />
22910 03-May-12<br />
10926 30-Jul-11<br />
Part of PWD road added casuse mis match reported by SDE Dhillion<br />
Constructed 5/1991. Path 6 karam. Crust 150mm. PWD Road ID<br />
2815. PWD length mismatch.<br />
6. Other<br />
Sub Total:<br />
4.89 km.<br />
Dropped<br />
1) H - 1765 Karanpur To Johluwal Kalka<br />
0.91 km.<br />
2854 30-Aug-11<br />
2836 25-Aug-11<br />
AA for Rs. 8.19 lacs in 1996. Work could not be started. Path not<br />
available. No money spent. Close the case for cancellation. The<br />
road be deleted from the database.<br />
No consolidation path exists. No expenditure done. EE to move the<br />
case for de-sanctioned.<br />
Monday, January 20, 2014 Page 22 of 24
2) H - 4527 Shifting And Reconstruction Of Road Along Disputed<br />
Kalka<br />
0.32 km.<br />
Portion On Vill. Firozpur To Hangola.<br />
2855 30-Aug-11<br />
2713 24-Aug-11<br />
When court case has been withdrawn, there is no need. Let this AA<br />
be closed and this ID be deleted.<br />
SDE (Sh. Dhillon) reported that it is part of RoadID 1767. There is<br />
some dispute in road alignment. This approval was arranged as per<br />
High Court orders to shift the road portion on actual alignment. EE<br />
should get de-sanction this road.<br />
3) H - 7185 Main road to vill. Garhi Kotaha Panchkula<br />
0.50 km.<br />
57350 06-Nov-13<br />
53735 29-Aug-13<br />
52520 06-Aug-13<br />
CA ordered on 27.08.2013, road does not fall in the policy of the<br />
<strong>Board</strong>. Case may be file.<br />
PR sent to CA on 29.8.2013.<br />
Request of gram panchayat garhri kotha path is 0 to 182m = 22',<br />
182 to 231m = 14' - 2". 231 to 320m = 18' - 11", 320 to 360m = 22',<br />
36 to 485m = 19' - 8".<br />
Sub Total:<br />
1.73 km.<br />
Rejected by Government<br />
1) H - 6821 Thandog to Samlana Ghat (HP) Kalka<br />
4.50 km.<br />
59164 04-Dec-13<br />
46718 03-May-13<br />
42202 13-Mar-13<br />
41698 06-Mar-13<br />
41490 28-Feb-13<br />
Hon'ble CM has not approved the construction of this road due to<br />
non-availablitity of consolidation path on dated 25.11.2013.<br />
Case sent to Hon'ble AM vide PSA no. 694 dated 11/04/2013<br />
Case sent to PSA on 13.03.2013.<br />
CP-Nil. Land belongs to forest deptt. Upward of EIC on 6.3.2013 for<br />
appropriate decision of the Government.<br />
On the request of Rajesh Kona Chairman Z.P. Hon'ble CM ordered<br />
for examine and take necessary action. Path not available. No<br />
distance shortened. Road does not falls in the policy of the board.<br />
Sub Total:<br />
4.50 km.<br />
Relates to other department<br />
1) H - 7259 Dakra Sahib Patshahi to Narayanpur<br />
Panchkula<br />
km.<br />
55505 27-Sep-13<br />
55305 18-Sep-13<br />
Road taken up by PWD B&R for construction. R/C/E submitted by<br />
EE Road-I B&R vide memo no. 48043 dated 12.08.2013 to SE Road<br />
B&R.<br />
Demanded by various Gram Panchayat and Guruduwara<br />
committee, Dakra Sahib & rececommended by Sh. D.K. Bansal, MLA<br />
Panchkula. On 06.09.2013, Hon'ble CM has asked to examine and<br />
do the needfull.<br />
Sub Total:<br />
km.<br />
Monday, January 20, 2014 Page 23 of 24
Grand Total:<br />
98.41 km.<br />
Monday, January 20, 2014 Page 24 of 24