Summary of Road Network<br />

Chronology of roads constructed by HSAMB in Panchkula Division:<br />

Roads Completed before 1-9-1999 50 roads 54.17 km<br />

Roads Completed between 1-9-1999 and 31-3-2005 17 roads 15.61 km<br />

Roads Sanctioned prior to 1-4-2005 and Completed after 1-4-2005 1 roads 1.12 km<br />

Roads Sanctioned between 1-4-2005 and 24-9-2009 7 roads 9.98 km<br />

Roads Sanctioned after 24-9-2009 4 roads 1.22 km<br />

Panchkula<br />

Completed Roads under Maintenance<br />

HSAMB Constructed Roads<br />

Total: 79 roads 82.10 km<br />

No SR envisaged 44 roads<br />

36.07<br />

SR Awarded 3 roads<br />

2.93<br />

SR sanctioned but yet to be awarded 1 roads<br />

0.67<br />

SR Un-awarded 3 roads<br />

4.02<br />

New Construction going on<br />

Panchkula<br />

km<br />

km<br />

km<br />

km<br />

Group Total: 51 roads 43.69 km<br />

New Construction - Awarded 1 roads<br />

0.76<br />

New Construction - Unawarded 2 roads<br />

6.06<br />

km<br />

km<br />

Group Total: 3 roads 6.82 km<br />

Other<br />

Dropped 3 roads<br />

1.73<br />

Rejected by Government 1 roads<br />

4.50<br />

Relates to other department 1 roads km<br />

km<br />

km<br />

Group Total: 5 roads 6.23 km<br />

Planned - New Construction<br />

Transferred<br />

PR with AM Office 4 roads<br />

10.08<br />

km<br />

Group Total: 4 roads 10.08 km<br />

Transferred to MC 19 roads<br />

15.78<br />

Transferred to PWD (938 roads) 4 roads<br />

10.92<br />

Transferred to PWD (Individual) 2 roads<br />

4.89<br />

No SR envisaged<br />

km<br />

km<br />

km<br />

Group Total: 25 roads 31.59 km<br />

Division Total: 88 roads 98.41 km<br />

1. Maintenance<br />

1) H - 1695 Barh To Barh Harijan Basti Kalka<br />

0.34 km.<br />

Monday, January 20, 2014 Page 1 of 24


60462 31-Dec-13<br />

47792 30-May-13<br />

44575 09-Apr-13<br />

18360 17-Feb-12<br />

D/E technically sanctioned for Rs. 79,20,926/-. (2nd priority).<br />

AR tender on 29.05.2013 received and work allotted on 29.05.2013.<br />

C.C road in good condition.<br />

Constructed 05/1997 path 3 karam crust 150mm. CC entire done<br />

02/2008. No patches. Good condition<br />

2) H - 1696 Pinjore Nalagarh Road To Kona Harijan Basti Kalka<br />

0.87 km.<br />

60463 31-Dec-13<br />

57757 13-Nov-13<br />

55901 01-Oct-13<br />

53205 14-Aug-13<br />

44627 09-Apr-13<br />

40873 13-Feb-13<br />

32801 17-Sep-12<br />

10910 14-Oct-11<br />

10883 30-Jul-11<br />

D/E technically sanctioned for Rs. 79,20,926/-. (2nd priority).<br />

Work completed except 90 mtr disputed portion (court case)<br />

Work completed except 90mtr due to Hon'ble court stay<br />

400m already completed (Paver block). In rest court case next date<br />

on 21.08.2013. contempt on stay on 09.09.2013.<br />

Work delayed due to dispute. Dispute settled with Distt.<br />

Admistration helps & work started on 21.03.2013.<br />

Work allotted to SH. Mohit Bansal on 01.02.2013.<br />

AA on 14.9.2012 for Rs. 33.43 lacs for pavers and drain in full<br />

length.<br />

SE proposes: 150m paver blocks (7 lacs).<br />

Constructed 1990. Crust 150mm. 100m CC + rest PC done in 2/2008.<br />

3) H - 1697 Pinjore Nalagarh Road To Kholi Rakhwala Kalka<br />

0.48 km.<br />

60464 31-Dec-13<br />

50965 03-Jul-13<br />

47793 30-May-13<br />

36351 26-Oct-12<br />

10895 30-Jul-11<br />

D/E technically sanctioned for Rs. 79,20,926/-. (2nd priority).<br />

477.53 Sqm patch done from 5/6/2013 to 7/6/2013 (Exp 125 k).<br />

AR tender on 29.05.2013 received and work allotted on 29.05.2013.<br />

AA on 17.10.2012 for Rs. 5.52 lacs. Work allotted on 23.10.2012 to<br />

Sh. Krishan kumar.<br />

Constructed 1997. Crust 150mm. PC done in 9/2008. Culvert was<br />

made by Panchayat at a place.on 5/12/2012, pavers laid in 100m<br />

length in 505m width (5.07 lacs).<br />

4) H - 1700 Pinjore Nalagarh Road To Charnia Kalka<br />

0.56 km.<br />

60467 31-Dec-13<br />

50967 03-Jul-13<br />

47796 30-May-13<br />

44835 09-Apr-13<br />

43763 25-Mar-13<br />

31781 23-Aug-12<br />

18083 14-Feb-12<br />

10981 14-Oct-11<br />

D/E technically sanctioned for Rs. 79,20,926/-. (2nd priority).<br />

609.86 Sqm patch done from 2/6/2013 to 4/6/2013 (Exp 148 k).<br />

AR tender on 29.05.2013 received and work allotted on 29.05.2013.<br />

SR required.<br />

EE reported, Road is patchless.<br />

Work allotted on 14.02.2013 for A/R and will be completed upto<br />

31.03.2013.<br />

Road is motorable but repair required due to non disposal of water<br />

and topography , last S/R done in 07, 2008.<br />

E.E reported road is patchless.<br />

Constructed 1994. Path 4 karam. Crust 150mm. Patches (53 sqm)<br />

done on 10/8/2011 to 6/9/2011 (12.2k).<br />

5) H - 1701 Pinjore Nalagarh Road To Khokhran Kalka<br />

0.41 km.<br />

60468 31-Dec-13<br />

47797 30-May-13<br />

D/E technically sanctioned for Rs. 79,20,926/-. (2nd priority).<br />

AR tender on 29.05.2013 received and work allotted on 29.05.2013.<br />

SR required.<br />

Monday, January 20, 2014 Page 2 of 24


44622 09-Apr-13<br />

40840 13-Feb-13<br />

31777 23-Aug-12<br />

22142 04-Apr-12<br />

10942 30-Jul-11<br />

Patch work done on 31.03.13 in A/R 2012-13<br />

Patch work taken in A/R 2012-13.<br />

Road is in good condition upto 0.33 km . Balance length is disputed.<br />

Work completed on 31.03.2012.<br />

Constructed 6/1996. Path 4 karam. Crust 150mm. PC done 2002.<br />

Patch + PC sanctioned on 18/5/2006, allotted on 19/9/2006.<br />

Tender (R & C) on 31/10/11.<br />

6) H - 1705 Kalka Bar Godown Road To Khuda Baksh & Dora Kalka<br />

2.35 km.<br />

60472 31-Dec-13<br />

50982 04-Jul-13<br />

50971 03-Jul-13<br />

45838 18-Apr-13<br />

43811 25-Mar-13<br />

7789 03-Oct-11<br />

10928 30-Jul-11<br />

D/E technically sanctioned for Rs. 79,20,926/-. (2nd priority).<br />

AR work for 2013 - 14 to be done. Work allotted on 29/5/2013.<br />

924.12 Sqm patch done from 3/6/2013 to 11/6/2013 (Exp 240k).<br />

Transferred back from PWD on 17.4.2013 within a list of 550<br />

(76+474) roads.<br />

HSAMB roads likely back from PWD B&R.<br />

Transferred to PWD. PWD RoadID : 9260<br />

Constructed 8/1994. Path 6 karam. Crust 150mm. PC done 4/2008.<br />

7) H - 1706 Kalka Bar Godam Road To Kheranwali Kalka<br />

0.50 km.<br />

60473 31-Dec-13<br />

47799 30-May-13<br />

43793 25-Mar-13<br />

40872 13-Feb-13<br />

36353 26-Oct-12<br />

10913 14-Oct-11<br />

10885 30-Jul-11<br />

D/E technically sanctioned for Rs. 79,20,926/-. (2nd priority).<br />

AR tender on 29.05.2013 received and work allotted on 29.05.2013.<br />

S/R work completed on 21.03.2013.<br />

Tender received on 09.01.2013. work allotted to Sh. Rajesh Kumar<br />

on 08.02.2013.<br />

AA on 23.10.2012 for RS. 3.32 lacs. Work awarded on 25.10.2012 to<br />

Sh. Amritpal.<br />

SE proposes: Patch + PC (3.2 lacs).<br />

Constructed 1994. Crust 150mm. PC done in 6/1999.<br />

8) H - 1707 Khetpurali To Sabilpur Panchkula<br />

0.57 km.<br />

44578 09-Apr-13<br />

39674 01-Jan-13<br />

31778 23-Aug-12<br />

18356 17-Feb-12<br />

10900 30-Jul-11<br />

Road is in good condition.<br />

Tender approved on 28/12/2012 (Sh. Varinder Kumar).<br />

Road is in motorable condition except fH.L. bridge portion.<br />

75mm WBM +PC sanctioned on 18.05.2006 allotted on 19.09.2006,<br />

falls in 2nd priority against combined A/A of Rs. 83.38 lacs dated<br />

18.05.2006. Now previous agency resumed the work & promised to<br />

complete upto 31.03.2012.<br />

Constructed 3/1994. Path 6 karam. Crust 150mm. PC done in 1999.<br />

9) H - 1714 Rehawar To School Panchkula<br />

0.41 km.<br />

60440 31-Dec-13<br />

60271 21-Dec-13<br />

47802 30-May-13<br />

44925 10-Apr-13<br />

D/E sanctioned for Rs. 84,54,164/-. (5th priority)<br />

D/E tech. sanctioned for Rs. 8454164/- for a group of 1724, 1712,<br />

1725, 1726, 1714, 1727, 1715, 1716, 1717, 1718, 1719, 1720, 1721,<br />

1722 & 1723.<br />

AR tender on 29.05.2013 received and work allotted on 29.05.2013.<br />

No need of brick on edge nor any place. The AR of the road be<br />

done. Work be closed, EIC decided.<br />

Monday, January 20, 2014 Page 3 of 24


44616 09-Apr-13<br />

39983 16-Jan-13<br />

31771 23-Aug-12<br />

10879 14-Oct-11<br />

10881 30-Jul-11<br />

Tender received on 04.02.13 for balance work in 5th priority.<br />

Tender in approval process. CC Road in 410 m is in good condition.<br />

Brick on edge on berms is pending.<br />

Tender to be received on 04.02.2013 at risk and cost of Inderpal<br />

and co.<br />

Good condition, C.C. laid , berms pending.<br />

75mm WBM + Cement concrete in entire length was sanctioned on<br />

14/1/2008 (5th priority), allotted on 11/4/2008 (Inder Pal). Work<br />

done except brick on edge on the side. Tenders for brick on edge on<br />

31/10/2011.<br />

Constructed 1/1997. Path 4 karam. Crust 150mm. PC done in 2001.<br />

10) H - 1715 Symtoo To Kanauli Panchkula<br />

1.35 km.<br />

60442 31-Dec-13<br />

60273 21-Dec-13<br />

47803 30-May-13<br />

44926 10-Apr-13<br />

44617 09-Apr-13<br />

40870 13-Feb-13<br />

39984 16-Jan-13<br />

37887 27-Nov-12<br />

31770 23-Aug-12<br />

18364 17-Feb-12<br />

10899 30-Jul-11<br />

D/E sanctioned for Rs. 84,54,164/-. (5th priority)<br />

D/E tech. sanctioned for Rs. 8454164/- for a group of 1724, 1712,<br />

1725, 1726, 1714, 1727, 1715, 1716, 1717, 1718, 1719, 1720, 1721,<br />

1722 & 1723.<br />

AR tender on 29.05.2013 received and work allotted on 29.05.2013.<br />

No need of brick on edge. AR be done. Work be closed.<br />

Tender received on 04.02.13 for balance work in 5th priority.<br />

Tender in approval process. Brick on edge on berms is pending.<br />

Taken in A/R 2012-13.<br />

Tender to be received on 04.02.2013 on risk and cost.<br />

The history of memos shows that officers are misrepresenting<br />

about progress. SE to visit site on 30th Nov. give correct picture<br />

and settle issues regarding need of remains works.<br />

Good condition, C.C. in some portion and berms pending.<br />

In 465m CC (RD885-1350m in vill. Kanauli) and rest PC sanctioned<br />

on 14.01.2008 allotted on 11.04.2008(Inder Pal).<br />

Constructed 3/1989. Path 5 karam. Crust 150mm. PC done in 2002.<br />

11) H - 1717 Tibbi To Shiv Mandir Panchkula<br />

0.46 km.<br />

60444 31-Dec-13<br />

60275 21-Dec-13<br />

50956 03-Jul-13<br />

44583 09-Apr-13<br />

40845 13-Feb-13<br />

31776 23-Aug-12<br />

10987 14-Oct-11<br />

D/E sanctioned for Rs. 84,54,164/-. (5th priority)<br />

D/E tech. sanctioned for Rs. 8454164/- for a group of 1724, 1712,<br />

1725, 1726, 1714, 1727, 1715, 1716, 1717, 1718, 1719, 1720, 1721,<br />

1722 & 1723.<br />

193.42 Sqm patch done from 24/5/2013 to 26/5/2013 (Exp 79 k).<br />

Road is in good condition except 30 mtr stretch is where there are<br />

skin patches and village drain water flows over the road.<br />

Taken in A/R 2012-13. A/R will be done 2013-14.<br />

Repair required in half portion due to street reach , last S/R done in<br />

04, 2010.<br />

Constructed 2001. Path 4 karam. Crust 150mm. Patch + PC in<br />

8/2009. Patches (45 sqm) done in 14/8/2011 to 20/9/2011 (9.8K).<br />

12) H - 1719 Kalka Bargodam Road To Paploha Kalka<br />

0.16 km.<br />

60446 31-Dec-13<br />

60277 21-Dec-13<br />

D/E sanctioned for Rs. 84,54,164/-. (5th priority)<br />

D/E tech. sanctioned for Rs. 8454164/- for a group of 1724, 1712,<br />

1725, 1726, 1714, 1727, 1715, 1716, 1717, 1718, 1719, 1720, 1721,<br />

1722 & 1723.<br />

Monday, January 20, 2014 Page 4 of 24


47804 30-May-13<br />

44584 09-Apr-13<br />

31779 23-Aug-12<br />

18359 17-Feb-12<br />

AR tender on 29.05.2013 received and work allotted on 29.05.2013.<br />

Road is motorable<br />

Road is in motorable position, last S/R done in 08, 2009.<br />

Constructed 03/1994 path 4 karam crust 150mm. PC done 8/2009.<br />

No patches. Good condition<br />

13) H - 1720 Ganeshpur To Bhoriya Mandir Kalka<br />

0.35 km.<br />

60447 31-Dec-13<br />

60278 21-Dec-13<br />

47805 30-May-13<br />

44624 09-Apr-13<br />

18085 14-Feb-12<br />

10988 14-Oct-11<br />

D/E sanctioned for Rs. 84,54,164/-. (5th priority)<br />

D/E tech. sanctioned for Rs. 8454164/- for a group of 1724, 1712,<br />

1725, 1726, 1714, 1727, 1715, 1716, 1717, 1718, 1719, 1720, 1721,<br />

1722 & 1723.<br />

AR tender on 29.05.2013 received and work allotted on 29.05.2013.<br />

Road is in good condition.<br />

E.E reported road is patchless.<br />

Constructed 2001. Path 4 karam. Crust 150mm. Patch + PC in<br />

8/2009. Patches (30 sqm) done in 11/10/2011 to 13/10/2011 (6K).<br />

14) H - 1721 Bhareli To Sangrana Kalka<br />

1.10 km.<br />

60448 31-Dec-13<br />

60279 21-Dec-13<br />

51618 18-Jul-13<br />

50983 04-Jul-13<br />

45509 18-Apr-13<br />

43812 25-Mar-13<br />

8136 03-Oct-11<br />

10931 30-Jul-11<br />

D/E sanctioned for Rs. 84,54,164/-. (5th priority)<br />

D/E tech. sanctioned for Rs. 8454164/- for a group of 1724, 1712,<br />

1725, 1726, 1714, 1727, 1715, 1716, 1717, 1718, 1719, 1720, 1721,<br />

1722 & 1723.<br />

AR Work completed.<br />

AR work for 2013 - 14 to be done. Work allotted on 29/5/2013.<br />

Transferred back from PWD on 17.4.2013 within a list of 550<br />

(76+474) roads.<br />

HSAMB roads likely back from PWD B&R.<br />

Transferred to PWD. PWD RoadID : 9266<br />

Constructed 1997. Path 6 karam. Crust 150mm. PC done 2001.<br />

15) H - 1723 Nanakpur To Sotwala Kalka<br />

0.93 km.<br />

60450 31-Dec-13<br />

60281 21-Dec-13<br />

47298 16-May-13<br />

44628 09-Apr-13<br />

40874 13-Feb-13<br />

24947 14-Jun-12<br />

10918 14-Oct-11<br />

10882 30-Jul-11<br />

D/E sanctioned for Rs. 84,54,164/-. (5th priority)<br />

D/E tech. sanctioned for Rs. 8454164/- for a group of 1724, 1712,<br />

1725, 1726, 1714, 1727, 1715, 1716, 1717, 1718, 1719, 1720, 1721,<br />

1722 & 1723.<br />

Work completed on 30.04.2013, final payment will be paid with in<br />

10 days.<br />

Work allotted to Sh. Rajiv Sharma on 21.01.2013. WBM completed<br />

in 840 mtr (5.48 width) on 24.03.2013 work is in progress and work<br />

will be completed by 15.04.13. Exp. 14.73 lacs<br />

Work allotted on 21.01.2013 & yet to be started.<br />

AA on 11/6/2012 for Rs. 28.48 lacs<br />

SE proposes: Paver Block in 200m (4.67 lacs).<br />

Constructed 1989. Crust 150mm. PC done in 3/2010.<br />

16) H - 1724 Main Road To Basti Naya Nagar Nanak Chand Kalka<br />

0.33 km.<br />

60435 31-Dec-13<br />

60380 30-Dec-13<br />

D/E sanctioned for Rs. 84,54,164/-. (5th priority)<br />

SE reported: work completed on 30.12.2013.<br />

Monday, January 20, 2014 Page 5 of 24


60267 21-Dec-13<br />

57754 13-Nov-13<br />

55900 01-Oct-13<br />

51384 11-Jul-13<br />

50806 03-Jul-13<br />

46906 08-May-13<br />

44927 10-Apr-13<br />

31773 23-Aug-12<br />

22147 04-Apr-12<br />

10898 30-Jul-11<br />

D/E tech. sanctioned for Rs. 8454164/- for a group of 1724, 1712,<br />

1725, 1726, 1714, 1727, 1715, 1716, 1717, 1718, 1719, 1720, 1721,<br />

1722 & 1723.<br />

Previous agency resume the work. WBM in progress. PC completed<br />

upto 16.11.2013.<br />

The original agency resumed the work & work in progress, will be<br />

completed by 15.10.2013<br />

Tenders not received due to technical fault. Now, tenders to be<br />

received on 29.7.2013.<br />

Tender to be received 08.07.2013.<br />

Tender rejected on account of higher rates. Tender to be recalled.<br />

EE reported: 130m PC left.<br />

No brick on edge required.<br />

Premix pending on 130 mtr.<br />

50mtr PC balance and brick on edge in CC left.<br />

Constructed 2001. Path 4 karam. Crust 150mm. 50m CC and in rest<br />

PC sanctioned on 14/1/2008, allotted on 11/4/2008 (Inder Pal).<br />

Only 132m PC done. Tenders to be received on 31/10/2011.<br />

17) H - 1727 Rattewali To Kanauli Kalka<br />

1.83 km.<br />

60441 31-Dec-13<br />

60272 21-Dec-13<br />

50984 04-Jul-13<br />

50973 03-Jul-13<br />

45839 18-Apr-13<br />

43813 25-Mar-13<br />

8137 03-Oct-11<br />

10932 30-Jul-11<br />

D/E sanctioned for Rs. 84,54,164/-. (5th priority)<br />

D/E tech. sanctioned for Rs. 8454164/- for a group of 1724, 1712,<br />

1725, 1726, 1714, 1727, 1715, 1716, 1717, 1718, 1719, 1720, 1721,<br />

1722 & 1723.<br />

AR work for 2013 - 14 to be done. Work allotted on 29/5/2013.<br />

138 Sqm patch done from 25/6/2013 to 28/6/2013 (Exp 30k).<br />

Transferred back from PWD on 17.4.2013 within a list of 550<br />

(76+474) roads.<br />

HSAMB roads likely back from PWD B&R.<br />

Transferred to PWD. PWD RoadID : 9263<br />

Constructed 1999. Path 6 karam. Crust 150mm. PC done 2002.<br />

18) H - 1729 Kammi Road To Shamshan Ghat Panchkula<br />

0.40 km.<br />

44586 09-Apr-13<br />

40849 13-Feb-13<br />

14050 02-Nov-11<br />

10908 14-Oct-11<br />

Road is motorable except some skin patches.<br />

Road is motorable except some patches will complete in A/R 2012-<br />

13.<br />

Constructed 8/2002. Path 4 karam. Crust 150mm. 75mm WBM + PC<br />

done in 12/2010.<br />

Patches 25 sqm done on 6/9/2011 (Expenditure done 7K).<br />

19) H - 1730 Bhoria To Jatwal Kalka<br />

0.94 km.<br />

44587 09-Apr-13<br />

43770 25-Mar-13<br />

40850 13-Feb-13<br />

39987 16-Jan-13<br />

22027 04-Apr-12<br />

18385 17-Feb-12<br />

Patch work completed on 05.12.12 in AR 2012-13 Exp. 0.33 lacs.<br />

Patch work completed on 05.12.2012 in A/R.<br />

Taken in A/R 2012-13.<br />

A/R done on 05.12.2012.<br />

EE reported, road is patchless.<br />

WBM patches done. PC patches left due to cold weather will be<br />

completed upto 15.03.2012<br />

Monday, January 20, 2014 Page 6 of 24


10887 30-Jul-11<br />

Constructed 1994. Path 4 karam. Crust 150mm. PC done in 4/2010.<br />

Small patches to be done.<br />

20) H - 1731 Chikken Road To Raowala Kalka<br />

0.41 km.<br />

44588 09-Apr-13<br />

40851 13-Feb-13<br />

18089 14-Feb-12<br />

14051 02-Nov-11<br />

10909 14-Oct-11<br />

Patch work completed in AR 2012-13 Exp. 0.052 lacs.<br />

Work complete in A/R 2012-13.<br />

E.E reported road is patchless.<br />

Constructed 8/1995. Path 4 karam. Crust 150mm. PC done in<br />

12/2010.<br />

Patches 31 sqm done on 11/8/2011 (Expenditure done 7K).<br />

21) H - 1732 Chiken Road To Pattan Kalka<br />

0.43 km.<br />

44589 09-Apr-13<br />

40852 13-Feb-13<br />

18361 17-Feb-12<br />

18090 14-Feb-12<br />

14072 02-Nov-11<br />

Patch work completed in AR 2012-13 Exp. 0.19 lacs.<br />

Work completed in A/R 2012-13.<br />

Constructed 1996 crust 150mm, Path 4 karam S/R 2001, patch + PC<br />

in 2010<br />

E.E reported road is patchless.<br />

(41 sqm) patches done from 13/10/2011 to 16/10/2011<br />

(Expenditure 09K).<br />

22) H - 1733 Bagwali To Bagwala Nariangarh<br />

1.75 km.<br />

44590 09-Apr-13<br />

43771 25-Mar-13<br />

40853 13-Feb-13<br />

14052 02-Nov-11<br />

10906 14-Oct-11<br />

Patch work completed on 20.03.13 in AR 2012-13. Exp. 0.485 lacs.<br />

Patch work completed on 20.03.2013 in A/R.<br />

Patch work will be taken up in A/R 2013-14.<br />

Constructed 6/2002. Path 4 karam. Crust 150mm. PC done in<br />

12/2010.<br />

Patches 145 sqm done from 11/8/2011 to 20/9/2011 (Expenditure<br />

98K).<br />

23) H - 1734 Main Road To Balouti Panchkula<br />

1.50 km.<br />

22028 04-Apr-12<br />

18386 17-Feb-12<br />

10924 30-Jul-11<br />

EE reported, road is patchless.<br />

WBM patches done. PC patches left due to cold weather will be<br />

completed upto 15.03.2012<br />

Constructed 2001. Path 4 karam. Crust 150mm. PC done 6/2009.<br />

Patch work required (EC 44 K)<br />

24) H - 1735 Main Road To Shahajanpur Kalka<br />

2.70 km.<br />

58105 18-Nov-13<br />

57758 13-Nov-13<br />

57095 30-Oct-13<br />

56179 10-Oct-13<br />

55898 01-Oct-13<br />

50985 04-Jul-13<br />

45840 18-Apr-13<br />

43814 25-Mar-13<br />

7790 03-Oct-11<br />

EE reported, Work completed.<br />

Laying of stone metal in progress.<br />

Work allotted on 17.10.2013 ( Sh. Divesh Goyal cont.) and work<br />

started.<br />

Tender approved on 20.09.2013. A/A Rs. 2,69,800/-on 09.10.2013.<br />

Tender in approval process at H.O.<br />

AR work for 2013 - 14 to be done. Work allotted on 29/5/2013.<br />

Transferred back from PWD on 17.4.2013 within a list of 550<br />

(76+474) roads.<br />

HSAMB roads likely back from PWD B&R.<br />

Transferred to PWD. PWD RoadID : 9270<br />

Monday, January 20, 2014 Page 7 of 24


10933 30-Jul-11<br />

Constructed 2002. Path 6 karam. Crust 150mm. No S/R done.<br />

25) H - 1736 Main Road To Madhawala Kalka<br />

0.22 km.<br />

50969 03-Jul-13<br />

44592 09-Apr-13<br />

18091 14-Feb-12<br />

14053 02-Nov-11<br />

10907 14-Oct-11<br />

176.26 Sqm patch done from 20/5/2013 to 22/5/2013 (Exp 44 k).<br />

Road is patch less.<br />

E.E reported road is patchless.<br />

Constructed 6/2002. Path 4 karam. Crust 150mm. 75mm WBM + PC<br />

done in 12/2010.<br />

Patches 21 sqm done on 11/10/2011 to 15/10/2011 (Expenditure<br />

4K).<br />

26) H - 1737 Barwala School To Bhareli Road. Panchkula<br />

0.17 km.<br />

44593 09-Apr-13<br />

40856 13-Feb-13<br />

10888 30-Jul-11<br />

Patch work completed on 23.03.13 in AR 2012-13. Exp. 1.31 lacs.<br />

Patch work requires will be done in A/R 2012-13.<br />

Constructed 1994. Path 4 karam. Crust 150mm. PC done in 8/2011.<br />

27) H - 1738 Punjab Bordar To Sangrana Panchkula<br />

0.25 km.<br />

44594 09-Apr-13<br />

40857 13-Feb-13<br />

10968 30-Jul-11<br />

Patch work completed on 22.03.13 in AR 2012-13. Exp. 0.67 lacs.<br />

Patch work will be done in A/R 2012-13.<br />

Constructed 1994. Path 4 karam. Crust 150mm. PC done in 8/2011.<br />

28) H - 1740 <strong>State</strong> Highway To Kammi. Panchkula<br />

4.24 km.<br />

50963 03-Jul-13<br />

44596 09-Apr-13<br />

40859 13-Feb-13<br />

23671 22-May-12<br />

10970 30-Jul-11<br />

1259.36 Sqm patch done from 30/5/2013 to 2/6/2013 (Exp 285 k).<br />

Road is in good condition.<br />

some patches exist will be repaired in A/R 2013-14.<br />

Work completed on 15.04.2012<br />

Constructed 1994. Path 4 karam. Crust 150mm. Patches + PC<br />

sanctioned on 31/7/2009, allotted on 04/02/2010. 1.7 km PC done<br />

(Sarvan Kumar). Work is proceeding. Likely completion by<br />

15/11/2011.<br />

29) H - 1741 Gogga Mari To Parwala. Kalka<br />

0.37 km.<br />

50811 03-Jul-13<br />

44597 09-Apr-13<br />

40860 13-Feb-13<br />

18092 14-Feb-12<br />

10971 30-Jul-11<br />

241.31 Sqm patch done from 1/6/2013 to 4/6/2013 (Exp 45 k).<br />

Patch work completed on 23.03.13 in AR 2012-13. Exp. 0.06 lacs.<br />

Taken in A/R 2012-13.<br />

E.E reported road is patchless.<br />

Constructed 2001. Path 4 karam. Crust 150mm. PC done in 4/2011.<br />

No patch.<br />

30) H - 1742 Manak Tabra To Rurki Kalka<br />

1.82 km.<br />

50958 03-Jul-13<br />

44598 09-Apr-13<br />

40861 13-Feb-13<br />

22149 04-Apr-12<br />

10972 30-Jul-11<br />

1058.48 Sqm patch done from 8/6/2013 to 11/6/2013 (Exp 233 k).<br />

Road is motorable/Pot hole free<br />

Patch work will be done 2012-13.<br />

Work completed on 31.03.2012<br />

Constructed 1994. Path 4 karam. 720m CC (RD 1100 - 1820m in vill.<br />

Manak Tabra )+ rest PC sanctioned in 2009. CC done in 4/2010. PC<br />

remains.<br />

Monday, January 20, 2014 Page 8 of 24


31) H - 1743 Main Road To Basti Rampur Jangi Kalka<br />

0.76 km.<br />

44599 09-Apr-13<br />

39990 16-Jan-13<br />

37990 07-Dec-12<br />

33223 25-Sep-12<br />

10973 30-Jul-11<br />

S/R in 8th priority completed on 30.11.12.<br />

P.C completed in 690mtr, Final bill under process.<br />

work completed on 30.11.2012.<br />

Work allotted to Sh. Gulshan Kumar & E.M. Forfeated & tender<br />

reinvited on 30.09.2012<br />

Constructed 2001. Path 3 karam. Crust 150m. Patch + PC<br />

sanctioned on 27/9/2010. Tender received on 25/11/2011. AA Rs.<br />

4.68 lacs. Patches be done first.<br />

32) H - 1749 Shamtoo To Amrala Panchkula<br />

1.61 km.<br />

60453 31-Dec-13<br />

50961 03-Jul-13<br />

44602 09-Apr-13<br />

31769 23-Aug-12<br />

10941 30-Jul-11<br />

2860 23-Jan-08<br />

D/E sanctioned for Rs. 1,53,71,100/-.<br />

93.34 Sqm patch done from 11/6/2013 to 11/6/2013 (Exp 17 k).<br />

Road is in good condition.<br />

Cause way still is in damaged condition.<br />

SE Proposes: Repair of cause way required (EC 70 K)<br />

AA for Rs. 22.37 lacs on 23/1/2008. Allotted on 10/4/2008. Road<br />

does not have any patch. Take over the road and final the<br />

measurements. Causeway portion has got damaged. Path 4 karam.<br />

Crust 225mm.<br />

33) H - 1750 Sultan Pur To Jaloli Panchkula<br />

0.80 km.<br />

60454 31-Dec-13<br />

50964 03-Jul-13<br />

44603 09-Apr-13<br />

40863 13-Feb-13<br />

18357 17-Feb-12<br />

D/E sanctioned for Rs. 1,53,71,100/-.<br />

38.34 Sqm patch done from 28/5/2013 to 29/5/2013 (Exp 7k).<br />

Road is in good condition.<br />

Taken in A/R 2012-13.<br />

A/A for Rs. 14.59 lacs on 23.01.2008. Allotted on 10.04.2008 0.8 km<br />

road completed on 04/2010, Crust 225mm, path 4 karam. Out of<br />

0.98 km the dispute/encroachment in 0.18 km in village phirni not<br />

solved, work finalized as it is. Road is through. This road falls in<br />

group of 6 no. new link roads against combined A/A of Rs. 157.01<br />

Lacs vide no. 3825 dated 23.01.08,<br />

34) H - 1751 Shampur To Kazmpur Kalka<br />

0.98 km.<br />

60455 31-Dec-13<br />

50809 03-Jul-13<br />

44604 09-Apr-13<br />

40864 13-Feb-13<br />

21378 22-Mar-12<br />

2863 30-Aug-11<br />

D/E sanctioned for Rs. 1,53,71,100/-.<br />

180.09 Sqm patch done from 1/6/2013 to 4/6/2013 (Exp 51 k).<br />

Patch work completed on 23.03.13. Exp. 0.45 lacs<br />

Taken in A/R 2012-13.<br />

EE reported, road is in Good Condition.<br />

AA for Rs. 16.56 lacs on 23/1/2008. Allotted on 10/4/2008. Road<br />

was completed on 3/2010. Actual length is 0.98km. Measurements<br />

be finalled. 2 patches have appeared on the side of culvert. This be<br />

patched.<br />

35) H - 1752 Chiken Marg To Barahmanwas Kalka<br />

0.14 km.<br />

60456 31-Dec-13<br />

44605 09-Apr-13<br />

40865 13-Feb-13<br />

18093 14-Feb-12<br />

D/E sanctioned for Rs. 1,53,71,100/-.<br />

CC road is in good condition<br />

Taken in A/R 2012-13.<br />

E.E reported road is patchless.<br />

Monday, January 20, 2014 Page 9 of 24


2864 30-Aug-11<br />

AA for Rs. 4.26 lacs on 23/1/2008. Allotted on 10/4/2008.<br />

Completed on 10/2009. It is concrete road. No patches. No problem.<br />

36) H - 1762 Sultan Pur To School Panchkula<br />

0.38 km.<br />

44621 09-Apr-13<br />

44608 09-Apr-13<br />

37979 07-Dec-12<br />

33226 25-Sep-12<br />

23281 15-May-12<br />

10921 14-Oct-11<br />

10897 30-Jul-11<br />

Road is motorable/Patch free<br />

S/R work plan 2012-13 completed on 30.11.12. Exp. 14.63 lacs<br />

Work completed on 30.11.12 paver block laid in 392 mtr, drain in<br />

300 mtr.<br />

Work awarded on 30.05.2012 to Sh. Rajesh Contractor.<br />

AA on 14/5/2012 for Rs. 14.12 lacs.<br />

SE proposes: Pavers on entire length (18 lacs).<br />

Constructed 2001. Crust 150mm. No S/R done. It is village street.<br />

37) H - 1763 Jatwal To Chopehar Kalka<br />

0.90 km.<br />

44609 09-Apr-13<br />

40867 13-Feb-13<br />

39791 16-Jan-13<br />

36355 26-Oct-12<br />

34479 10-Oct-12<br />

10915 14-Oct-11<br />

10893 30-Jul-11<br />

S/R work completed on 05.12.12. Exp. 4.21 lacs<br />

Taken in A/R 2012-13.<br />

PC completed in 622m. Wire carpet left.<br />

Work awarded on 19.10.12 to Sh. Amrit Pal.<br />

AA for Rs. 5.48 lacs on 9/10/2012.<br />

SE proposes: Patch + PC (5 lacs).<br />

Constructed 1996. Crust 150mm. No S/R done. Panchayat has done<br />

CC in 210m.<br />

38) H - 1764 Sotwala To Himachal Border Kalka<br />

0.22 km.<br />

44610 09-Apr-13<br />

37996 07-Dec-12<br />

37889 27-Nov-12<br />

32061 11-Sep-12<br />

23680 22-May-12<br />

22266 06-Apr-12<br />

2853 14-Oct-11<br />

Const.work completed on 24.03.2013. Exp. 5.19 lacs<br />

Work alloted to Sh. Sushil sehgal on 10.09.2012. PC complete. Berm<br />

and stone pitching pending due to dispute of villagers.<br />

SE says: All work complete except stone pitching. Length of about<br />

100m. SE to review if pitching required and get implemented as per<br />

his decision.<br />

Revised AA on 5/9/2012 for Rs. 8.79 lacs. Tender approved on<br />

5/9/2012 (SH. Sushil Kumar Contractor).<br />

The old final payment of contrator to be settled. Estimate under<br />

process for T/S in circle office.<br />

AA on 2.4.2012 (Rs. 7.70 lacs).<br />

AA for Rs 0.99 lacs on 31/3/1994. Allotted on 19/5/1994. WBM<br />

stone was taken (67 cum + 16 cum) and Rs. 15,180/- were paid.<br />

Then a court case was done and Panchayat did not give any<br />

resolution. Court case decided. Panchayat has given resolution<br />

now. Sajra is being taken.<br />

No stone is seen at site.<br />

A fresh estimate be made incorporating the Rs. 15,180/- to be<br />

written off and to make the road after resolution of Panchayat. No<br />

issue is with the contractor.<br />

Road leads to Chitkara University.<br />

39) H - 1766 NH-21 To Tanda Johluwal Kalka<br />

0.61 km.<br />

44629 09-Apr-13<br />

40875 13-Feb-13<br />

Work allotted to Sh. Rajesh Kumar on 8.02.2013. Work completed<br />

on 06.04.13.<br />

Work allotted to Sh. Rajesh kumar on 08.02.2013.<br />

Monday, January 20, 2014 Page 10 of 24


23681 22-May-12<br />

10914 14-Oct-11<br />

10886 30-Jul-11<br />

T/A on 24.02.2012 (Rs. 4.01 lacs). No tender received on 20.03.2012<br />

& 27.04.2012.<br />

SE proposes: Patch + PC (4 lacs).<br />

Constructed 1994. Crust 150mm. No S/R done.<br />

40) H - 1771 NH-21 To Shahpur Kalka<br />

0.59 km.<br />

44611 09-Apr-13<br />

37980 07-Dec-12<br />

33228 25-Sep-12<br />

10920 14-Oct-11<br />

10889 30-Jul-11<br />

S/R work plan 2012-13 completed on 05.12.12. Exp. 14.94 lacs<br />

Work completed on 05.12.12 paver block laid in 490 mtr.<br />

AA on 14/5/2012 for Rs. 19.68 lacs. Work awarded ton 17.05.2012<br />

to Sh. Rahul Sehgel.<br />

SE proposes: Paver blocks on entire (18 lacs).<br />

Constructed 1994. PC done in 1999.<br />

41) H - 4519 Const. Of H.L Bridge 1 Span 12 Mtr Over Tributary Of Panchkula<br />

km.<br />

Sabilpur On Link Road From Sabilpur To Khetpurali<br />

57103 30-Oct-13<br />

56523 17-Oct-13<br />

50807 03-Jul-13<br />

49380 17-Jun-13<br />

44631 09-Apr-13<br />

43819 25-Mar-13<br />

40878 13-Feb-13<br />

2714 24-Aug-11<br />

work completed on 25.10.2013.<br />

Protection work completed.<br />

work allotted on 21.06.2013 and in progress.<br />

A/A on 14.06.2013 for Rs. 20.50 lacs.<br />

Work completed upto slab , balance work in progress. Exp. 32.44<br />

lacs<br />

Work stands allotted to Sh. Varinder Kumar on 01.01.201. The sub<br />

structure work completed and super structure work is in progress.<br />

The tentative date of completeion 15.04.2013.<br />

Work allotted to Sh. Virender kumar at the risk & cost of Sh. Rajat<br />

Punia. Work in progress sinking well 'A' is complete and sinking<br />

well be is in progress.<br />

SDE (Sh. Dhillon) reported that it is part of RoadID 1707. This<br />

proposal has been approved against existing / damaged bridge.<br />

The bridge was washed away due to flood.<br />

42) H - 4723 Approach Road Of Paploha Stadium Kalka<br />

0.39 km.<br />

44612 09-Apr-13<br />

39998 16-Jan-13<br />

37998 07-Dec-12<br />

2857 30-Aug-11<br />

Const.work completed on 26.12.12. Exp. 1.08 lacs<br />

PC completed.<br />

work alloted to Sh. Sunil kumar on 26.10.2012 at risk and cost of<br />

Sh. Sourav Gupta. Yet to start.<br />

AA of Rs. 8.07 lacs on 17/11/2008. Allotted on 18/2/2009. Path = 4<br />

karam. WBM is complete on entire road. Only PC is left. Stadium is<br />

not yet complete. Stadium structure has been made. Risk and cost<br />

work is being done. Risk & cost tenders be called.<br />

43) H - 4725 Approach Road Of Natwal Stadium Panchkula<br />

0.24 km.<br />

44613 09-Apr-13<br />

37999 07-Dec-12<br />

23892 22-May-12<br />

18358 17-Feb-12<br />

const. work completed on 10.10.12. Exp. 4.76 lacs<br />

Work completed on 10.10.12<br />

Work allotted (Sh. Rajesh Kumar) on 14.03.2012.<br />

A/A for Rs. 4.26 lacs onn 04.03.2010, allotted on 29.08.2011<br />

(Bhajan Singh), E/M forfieted. Now tender received on 27.01.2012 ,<br />

under process of allotment.<br />

44) H - 4939 Charnia Bargodam Road To Kheranwali Kalka<br />

0.25 km.<br />

Monday, January 20, 2014 Page 11 of 24


44614 09-Apr-13<br />

40868 13-Feb-13<br />

18094 14-Feb-12<br />

10884 30-Jul-11<br />

CC road is in good condition<br />

Taken in A/R 2012-13.<br />

E.E reported road is patchless.<br />

Constructed 1994. Crust 150mm. PC done in 2001. PC done in 2008<br />

again. No patches.<br />

Sub Total:<br />

36.07 km.<br />

SR Awarded<br />

1) H - 1745 Bhiwar Zohri To Bhiwar Kalka<br />

0.21 km.<br />

61831 17-Jan-14<br />

57759 13-Nov-13<br />

55902 01-Oct-13<br />

53206 14-Aug-13<br />

51383 11-Jul-13<br />

50805 03-Jul-13<br />

47296 16-May-13<br />

44615 09-Apr-13<br />

10975 30-Jul-11<br />

D/E revised with paver blocks and sent to SE (P)<br />

work will be complted upto 30.11.2013.<br />

Work recently started & will be completed by 15.10.2013<br />

The road is beyoud morni and 1km way in between is katcha forest.<br />

Hence the work would be taken up only after rain.<br />

Work not started. Likely completion by 31.7.2013.<br />

Work allotted on 05.06.2013 to Ballu Ram contractor.<br />

Tender was called on 25.04.2013, work allotted, E/M forefieted.<br />

Tender recalled on 17.05.2013.<br />

Work allotted to Sh. Rajiv Sharma on 26.10.12. S/R in 8th priority<br />

will be completed by 15.04.13.<br />

Constructed 2002. Path 4 karam. Crust 150m. Patch + PC<br />

sanctioned on 27/9/2010. Tender received. Recalled. Patches be<br />

done first (EC 1.65 lacs).<br />

2) H - 1757 Bhareli School To Bhagwan Pur Kalka<br />

1.09 km.<br />

61832 17-Jan-14<br />

61608 13-Jan-14<br />

60960 06-Jan-14<br />

57756 13-Nov-13<br />

57235 31-Oct-13<br />

57102 30-Oct-13<br />

51619 18-Jul-13<br />

50986 04-Jul-13<br />

45511 18-Apr-13<br />

43815 25-Mar-13<br />

8138 03-Oct-11<br />

10934 30-Jul-11<br />

Work allotted on 13.01.14. Contractor refused in writing to do the<br />

work and asked for forfeiture of E/M. Tender recalled for 05.02.14.<br />

Tender approved in favour of Sh. Sarvan Kumar contractor. A/A<br />

accorded for Rs. 5.44 lacs.<br />

Returned back to EE, Panchkula on 24.12.2013.<br />

Tender of PC portion (Except Phirni portion) sent to SE for approval<br />

of rates and phirni portion estimate (under phirni development<br />

programme) sent to CE office for administrative approval.<br />

Tender received on 30.10.2013 & under process in division office.<br />

Tender invited for 30.10.2013 for PC work only. Phirni case sent to<br />

Head Office for A/A.<br />

AR work completed.<br />

AR work for 2013 - 14 to be done. Work allotted on 29/5/2013.<br />

Transferred back from PWD on 17.4.2013 within a list of 550<br />

(76+474) roads.<br />

HSAMB roads likely back from PWD B&R.<br />

Transferred to PWD. PWD RoadID : 9265<br />

Constructed 2/1994. Path 6 karam. Crust 150mm. PC done 2000.<br />

3) H - 1761 Rampur To Meer Pur Kalka<br />

1.63 km.<br />

57760 13-Nov-13<br />

57096 30-Oct-13<br />

Supply of metal , earth work in berms in progress.<br />

Work allotted on 17.10.2013 (Sh. Ballu ram cont.) and work started.<br />

Monday, January 20, 2014 Page 12 of 24


56178 10-Oct-13<br />

55899 01-Oct-13<br />

50810 03-Jul-13<br />

44607 09-Apr-13<br />

40866 13-Feb-13<br />

31784 23-Aug-12<br />

22030 04-Apr-12<br />

10896 30-Jul-11<br />

Tender approved on 20.09.2013. A/A Rs. 12,05,200/- and rates also<br />

approved on 10.10.2013.<br />

Tender in approval process at H.O.<br />

675.69 Sqm patch done from 1/6/2013 to 4/6/2013 (Exp 1.30 lacs).<br />

Patch work completed on 23.03.13 in AR 2012-13. Exp. 0.90 lacs.<br />

Taken in A/R 2012-13.<br />

S/R required in 1373 mtr. Balance portion not constructed due to<br />

dispute.<br />

EE reported, road is patchless.<br />

Constructed 2001. Crust 150mm. No S/R done.<br />

Sub Total:<br />

2.93 km.<br />

SR sanctioned but yet to be awarded<br />

1) H - 1698 Pinjore Nalagarh Road To Nanakpur Via Tibbi Kalka<br />

0.67 km.<br />

61830 17-Jan-14<br />

60465 31-Dec-13<br />

58106 18-Nov-13<br />

57237 31-Oct-13<br />

57098 30-Oct-13<br />

50966 03-Jul-13<br />

47794 30-May-13<br />

44619 09-Apr-13<br />

40837 13-Feb-13<br />

39979 16-Jan-13<br />

31782 23-Aug-12<br />

18082 14-Feb-12<br />

10980 14-Oct-11<br />

Tender recalled due to higher rates as per order of Chief Engineer,<br />

for 05.02.14 .<br />

D/E technically sanctioned for Rs. 79,20,926/-. (2nd priority).<br />

Tender received on 15.11.2013.<br />

No tender received on 30.10.2013 , now re-invited and due to be<br />

received on 15.11.2013.<br />

Tender invited for 30.10.2013.<br />

235.83 Sqm patch done from 7/6/2013 to 8/6/2013 (Exp 62 k).<br />

AR tender on 29.05.2013 received and work allotted on 29.05.2013.<br />

Patch work done on 31.03.13. Exp. 1.25 lacs<br />

Taken in A/R 2012-13.<br />

S/R required.<br />

Road is motorable but strengthening repair required due to<br />

villagers street portion , last S/R completed in 06, 2008.<br />

E.E reported road is patchless.<br />

Constructed 1994. Path 4 karam. Crust 150mm. Patches (62 sqm)<br />

done on 10/8/2011 to 6/9/2011 (14 K).<br />

Sub Total:<br />

0.67 km.<br />

SR Un-awarded<br />

1) H - 1699 Pinjore Nalagarh Road To Sito Majra Kalka<br />

1.03 km.<br />

61827 17-Jan-14<br />

60466 31-Dec-13<br />

58107 18-Nov-13<br />

57238 31-Oct-13<br />

57099 30-Oct-13<br />

47795 30-May-13<br />

44620 09-Apr-13<br />

40838 13-Feb-13<br />

Tender with Chief Engineer for decision of rates.<br />

D/E technically sanctioned for Rs. 79,20,926/-. (2nd priority).<br />

Tender received on 15.11.2013.<br />

No tender received on 30.10.2013 , now re-invited and due to be<br />

received on 15.11.2013.<br />

Tender invited for 30.10.2013.<br />

AR tender on 29.05.2013 received and work allotted on 29.05.2013.<br />

SR required.<br />

In 60 mtr length village Panchayat is laying sewrage line in<br />

centered road<br />

Taken in A/R 2012-13.<br />

Monday, January 20, 2014 Page 13 of 24


39980 16-Jan-13<br />

31775 23-Aug-12<br />

22025 04-Apr-12<br />

18383 17-Feb-12<br />

10922 30-Jul-11<br />

50'+40' portion damaged need repair. R/C/E under preparation.<br />

Repair required due to gradient, last repair was done in 03, 2008<br />

EE reported, road is patchless.<br />

WBM patches done. PC patches left due to cold weather will be<br />

completed upto 15.03.2012<br />

Constructed 1994. Path 4 karam. Crust 150mm. PC done 3/2008.<br />

Patch required (EC 45 K)<br />

2) H - 1704 Kalka Bar Godam Road To Pargian Kalka<br />

0.89 km.<br />

61828 17-Jan-14<br />

60923 06-Jan-14<br />

60573 02-Jan-14<br />

60471 31-Dec-13<br />

57236 31-Oct-13<br />

57100 30-Oct-13<br />

47798 30-May-13<br />

44577 09-Apr-13<br />

40871 13-Feb-13<br />

36352 26-Oct-12<br />

10919 14-Oct-11<br />

10890 30-Jul-11<br />

Tender with Chief Engineer for decision of rates.<br />

Returned for reduction of rates.<br />

Work Plan-2: Tender in head office with C.E.<br />

D/E technically sanctioned for Rs. 79,20,926/-. (2nd priority).<br />

No tender received on 30.10.2013 , now re-invited and due to be<br />

received on 15.11.2013.<br />

Tender invited for 30.10.2013.<br />

Balance work will be got completed upto 20.06.2013.<br />

paver blocks in 280 mtr laid on 23.3.13 ,Heavy patch work required<br />

in 610 mtr. Exp. 8.36 lacs<br />

Paver block laid in 240m out of 280m.<br />

AA for Rs. 9.30 lacs on 9/10/2012. Work awarded on 19.10.12 to<br />

Sh. Rahul Sahgal.<br />

SE proposes: Paver blocks in 300 m (cost 8.60 lacs).<br />

Constructed 1995. Crust 150mm. 75mm WBM + PC done in 8/2008.<br />

3) H - 1710 Bataur To H.M.T Colony Panchkula<br />

2.10 km.<br />

61829 17-Jan-14<br />

57755 13-Nov-13<br />

57101 30-Oct-13<br />

55897 01-Oct-13<br />

44623 09-Apr-13<br />

44836 09-Apr-13<br />

40876 13-Feb-13<br />

31797 23-Aug-12<br />

10983 14-Oct-11<br />

Rates approved on 06.01.14. Work allotted on 08.1.14.<br />

Sent to CE office for approval of rates.<br />

Tender case sent to CE for approval of rates.<br />

Tender re-invited for 15.10.2013<br />

Patch work done on 24.03.13 in A/R 2012-13. Good condition in 1<br />

km and motorable in 1.1 km. Exp. 1.47 lacs.<br />

EE reported, Road is patchless.<br />

Taken in A/R 2012-13.<br />

under transfer to MC.<br />

Constructed 2001. Path 4 karam. Crust 150mm. Patch + PC done in<br />

2/2007. Patches (400 sqm) done on 10/8/2011 to 6/9/2011 (30k).<br />

2. New Construction<br />

Sub Total:<br />

4.02 km.<br />

New Construction - Awarded<br />

1) H - 4724 Approach Road Of Naggal Stadium Panchkula<br />

0.76 km.<br />

61835 17-Jan-14<br />

59776 11-Dec-13<br />

E/M of Ashwani Kumar forfeited and tender called on 15.01.14. No<br />

tender received on 15.01.14. now tender to be recalled on 05.02.14.<br />

Earth not available.<br />

Monday, January 20, 2014 Page 14 of 24


57097 30-Oct-13<br />

56568 23-Oct-13<br />

56541 22-Oct-13<br />

56526 17-Oct-13<br />

55905 01-Oct-13<br />

50808 03-Jul-13<br />

44634 09-Apr-13<br />

39999 16-Jan-13<br />

37890 27-Nov-12<br />

36370 26-Oct-12<br />

33214 25-Sep-12<br />

2851 02-Mar-10<br />

Work allotted on 25.10.2013 (Sh. Ashwani Kumar cont.) and yet to<br />

start.<br />

R/A/A granted for Rs. 13,89,500/-<br />

RAA for Rs. 13.89 lacs on dated 22.10.2013 and tender also<br />

approved on dated 22.10.2013.<br />

Tender under process in HQ.<br />

Tender submitted in H.O. for approval of rates<br />

Tender to be received on 08.07.2013.<br />

Trees removed by Secretary MC PKL. Area is under Municipal corp.<br />

PKL. Earth not available nearby , MC asked to intimate source of<br />

earth.<br />

XEN met D.C. PKL to direct E.O-cum-Secretary municipal<br />

corporation, PKL to remove trees.<br />

Discussed with SE. SE says there is land dispute. When land is not<br />

handed over, close the contract because we do not want disputes<br />

with contractor. Land be arranged trees removed and then tenders<br />

be invited.<br />

D.C. ordered on 12.09.2012 to EO MC to get the tree cut. Action<br />

still awaited.<br />

95 no trees are in the alingment, D.C. Panchkula ordered E.O<br />

muncipal corporation to cut the trees to be allot on 27.12.11 to Sh.<br />

Balla Contractor.<br />

AA for Rs. 8.91 lacs on 2/3/2010. Allotted on 17/1/2011. Path -4<br />

karam. Work not started. Earnest Money forfieted. Tenders on<br />

6/9/2011.<br />

Sub Total:<br />

0.76 km.<br />

New Construction - Unawarded<br />

1) H - 1747 Taparian To Rattewali Panchkula<br />

2.91 km.<br />

61833 17-Jan-14<br />

60451 31-Dec-13<br />

59777 11-Dec-13<br />

44632 09-Apr-13<br />

2830 25-Aug-11<br />

2858 23-Jan-08<br />

Rates approved and work allotted on 10.01.14.<br />

D/E sanctioned for Rs. 1,53,71,100/-.<br />

EE told that agency called for reduction of rates.<br />

Tenders re-invited on 25.04.2013 for balance work i.e. Const. of 6<br />

no. Link roads.<br />

PC 1.50 km in 3/2010. WBM 2.7km. Action under clause II and III<br />

taken on 21/10/2009, 4/1/2011. Final bill measurment taken on<br />

16/7/2011.<br />

AA for Rs. 51.41 lacs on 23/1/2008. Allotted on 10/4/2008.<br />

Path=4karam. 1.5km road is totally complete. Work involves<br />

150mm WBM. In 1.21km WBM is complete. Agency is G. J. Singh. In<br />

rest 200m, there was land dispute which has been settled. There is<br />

a culvert (slab) of 3m span.<br />

2) H - 1748 Rattewali Tibbi To Khetpurali Panchkula<br />

3.15 km.<br />

61834 17-Jan-14<br />

60452 31-Dec-13<br />

59778 11-Dec-13<br />

57762 13-Nov-13<br />

44633 09-Apr-13<br />

Rates approved and work allotted on 10.01.14.<br />

D/E sanctioned for Rs. 1,53,71,100/-.<br />

EE told that agency called for reduction of rates.<br />

Tender case sent to CE office for approval.<br />

Tenders re-invited on 25.04.2013 for balance work i.e. Const. of 6<br />

no. Link roads.<br />

Monday, January 20, 2014 Page 15 of 24


2859 30-Aug-11<br />

AA for Rs. 47.82 lacs of 23/1/2008. Allotted on 10/4/2008. Path - 4<br />

karam. 1.5km WBM is complete. In rest of the road, the<br />

specifications are not appropriate. SDE, EE, SE are of conclusion<br />

that the present specification would be a waste in the rest of the<br />

road. Contract be curtailed to 1.5km and for rest revised AA and<br />

detailed estimate technical sanction be initiated immediately.<br />

Detailed estimate & Revised AA case to be submitted by 5/9/2011.<br />

No work has been done beyond 1.5km.<br />

3. Under Planning<br />

Sub Total:<br />

6.06 km.<br />

PR with AM Office<br />

1) H - 6822 Thandon to Nimwala Kalka<br />

5.50 km.<br />

46719 03-May-13<br />

42198 13-Mar-13<br />

41700 06-Mar-13<br />

41699 06-Mar-13<br />

41491 28-Feb-13<br />

Case sent to Hon'ble AM vide PSA no.698 dated 11/04/2013<br />

Case sent to PSA on 13.03.2013.<br />

Upward of EIC on 6.3.2013 for appropriate decision of the<br />

Government.<br />

Path Nil. No distance shortened. Does not falls in the policy of the<br />

board.<br />

On the request of Garm Panchayat Nimawal Hon'ble CM for<br />

examine and take necessary action.<br />

2) H - 7133 Rehoar phirni to vill. Rehoar bandh Panchkula<br />

0.86 km.<br />

59003 03-Dec-13<br />

57974 15-Nov-13<br />

53728 29-Aug-13<br />

51585 16-Jul-13<br />

Case sent to Hon'ble A.M. vide PSA Memo No. 2777 dated<br />

06.11.2013.<br />

Case sent to PSA vide CA memo no. 669 dated 31.10.2013.<br />

PR sent to CA on 29.8.2013.<br />

Request of Gram Panchayat Batour Hon'ble CM forwarded for<br />

appropriate action . Path is 6 karam kila cut.<br />

3) H - 7134 Bataur High School to vill. Mouli Panchkula<br />

3.12 km.<br />

59099 03-Dec-13<br />

57998 15-Nov-13<br />

53726 29-Aug-13<br />

51586 16-Jul-13<br />

Case sent to Hon'ble A.M. vide PSA Memo No. 2885 dated<br />

06.11.2013.<br />

Case sent to PSA vide CA memo no. 644 dated 31.10.2013.<br />

PR sent to CA on 29.8.2013.<br />

Request of Gram Panchayat Batour Hon'ble CM forwarded for<br />

appropriate action . Path is 7 karam angled kila cut.<br />

4) H - 7231 NH-73 to Village Naggal Panchkula<br />

0.60 km.<br />

58985 03-Dec-13<br />

57981 15-Nov-13<br />

57173 31-Oct-13<br />

56112 08-Oct-13<br />

55267 18-Sep-13<br />

Case sent to Hon'ble A.M. vide PSA Memo No. 2758 dated<br />

06.11.2013.<br />

Case sent to PSA vide CA memo no. 662 dated 31.10.2013.<br />

P/R sent to CA vide EIC memo no. 2768 dated 14.10.2013.<br />

EE reported that road is to be constructed on Samlat land and no<br />

distance shortened with the const. of this road.<br />

On the request of Sh. Ram Kishan Gujjar, CPS Industuries & IT<br />

Hon'ble CM ordered on 11.04.2013 that the feasibility report<br />

alongwith estimate be submitted to hime for his consideration. No<br />

revenue path available.<br />

Monday, January 20, 2014 Page 16 of 24


5. Transferred<br />

Sub Total:<br />

10.08 km.<br />

Transferred to MC<br />

1) H - 1694 Dharampur To Kanguwal Kalka<br />

2.97 km.<br />

60461 31-Dec-13<br />

56579 24-Oct-13<br />

50991 04-Jul-13<br />

43808 25-Mar-13<br />

40869 13-Feb-13<br />

39977 16-Jan-13<br />

33225 25-Sep-12<br />

27914 20-Jul-12<br />

10911 14-Oct-11<br />

10892 30-Jul-11<br />

D/E technically sanctioned for Rs. 79,20,926/-. (2nd priority).<br />

EE reported: Road transter to MC on 21.10.2013.<br />

AR work for 2013-14 allotted to M/s Dynamic Constn. Co. on<br />

16/5/2013 shown transferred to MC but not taken over by MC so<br />

far.<br />

Transfer to MC vide his office memo no. 715 dated 07.02.2013.<br />

PC done in 730m out of 800m.<br />

Paver block laid in 400mtr, Brick on edge paving on berms<br />

completed. P.C on patch over a Stretch of 800 mtr in progress.<br />

Work awarded 16.07.2012 to Sushel Kumar, 200m paver block layer.<br />

AA on 11/7/2012 for Rs. 23.36 lacs. SR allotted on 16.07.12 (Sh.<br />

Sushil kumar).<br />

SE proposes: 400m paver blocks (20 lacs).<br />

Constructed 1996. Crust 150mm. In 460m, committee had laid<br />

paver block. PC done in 6/2008 in 2.51 km. In about 400m<br />

additional paver through colonies. Rest of the road is without<br />

patches.<br />

2) H - 1702 Kalka Bar Godown Road To Tagra Kaliram Kalka<br />

0.19 km.<br />

60469 31-Dec-13<br />

56610 24-Oct-13<br />

50992 04-Jul-13<br />

43810 25-Mar-13<br />

31796 23-Aug-12<br />

22143 04-Apr-12<br />

18363 17-Feb-12<br />

D/E technically sanctioned for Rs. 79,20,926/-. (2nd priority).<br />

EE reported: Road transter to MC on 23.10.2013.<br />

AR work for 2013-14 allotted to M/s Dynamic Constn. Co. on<br />

16/5/2013 shown transferred to MC but not taken over by MC so<br />

far.<br />

Transfer to MC vide his office memo no. 715 dated 07.02.2013.<br />

under transfer to MC.<br />

Work completed on 31.03.2012.<br />

Constructed 6/1996, path 4 karam. Crust 150mm. PC done in 2001,<br />

patches +PC sanction 15.05.2006 allotted on 19.06.2006<br />

3) H - 1703 Kalka Bar Godam Road To Tagra Sahu. Kalka<br />

0.58 km.<br />

60470 31-Dec-13<br />

56611 24-Oct-13<br />

50993 04-Jul-13<br />

22141 04-Apr-12<br />

18382 17-Feb-12<br />

18362 17-Feb-12<br />

18108 14-Feb-12<br />

D/E technically sanctioned for Rs. 79,20,926/-. (2nd priority).<br />

EE reported: Road transter to MC on 23.10.2013.<br />

AR work for 2013-14 allotted to M/s Dynamic Constn. Co. on<br />

16/5/2013 shown transferred to MC but not taken over by MC so<br />

far.<br />

Transferred to MC.<br />

The matter for damaged crushed of the road is being taken up with<br />

PH department for its restrotion.<br />

Constructed 5/1996. Path 4 karam, Crust 150mm. PC done in 2001.<br />

Patches +PC sanction 18.05.2006, allotted on 19.09.2006<br />

Likely date 31.03.2012.<br />

Monday, January 20, 2014 Page 17 of 24


17363 11-Jan-12<br />

Before the Tenders Previous Agency has promised to execute and<br />

complete the work. But the XEN, PKL has informed that PHED has<br />

laid the water supply pipe line and has completely damaged the<br />

crust of the road in entire length.<br />

4) H - 1709 National Highway To Chhota Bhanu Panchkula<br />

1.07 km.<br />

60475 31-Dec-13<br />

56606 24-Oct-13<br />

44579 09-Apr-13<br />

40842 13-Feb-13<br />

10982 14-Oct-11<br />

D/E technically sanctioned for Rs. 79,20,926/-. (2nd priority).<br />

EE reported: Road transter to MC on 22.10.2013.<br />

Patch work completed on 24.03.13. Exp. 0.63 lacs.<br />

Patch work in A/R 2012-13.<br />

Constructed 2001. Path 4 karam. Crust 150mm. Patches (405 sqm)<br />

done on 10/8/2011 to 6/9/2011 (20k).<br />

5) H - 1712 Mansa Devi Mandir Road To Saketri Panchkula<br />

0.38 km.<br />

60436 31-Dec-13<br />

60268 21-Dec-13<br />

56602 24-Oct-13<br />

47800 30-May-13<br />

44580 09-Apr-13<br />

10984 14-Oct-11<br />

D/E sanctioned for Rs. 84,54,164/-. (5th priority)<br />

D/E tech. sanctioned for Rs. 8454164/- for a group of 1724, 1712,<br />

1725, 1726, 1714, 1727, 1715, 1716, 1717, 1718, 1719, 1720, 1721,<br />

1722 & 1723.<br />

EE reported: Road transter to MC on 22.10.2013.<br />

AR tender on 29.05.2013 received and work allotted on 29.05.2013.<br />

Road is patch less.<br />

Constructed 1994. Path 4 karam. Crust 150mm. Patch + PC in<br />

9/2010. Patches (37sqm) done on 21/10/2011 to 23/10/2011 (07K).<br />

6) H - 1713 Kalka Chandigarh Road To Beer Ghaggar Panchkula<br />

0.80 km.<br />

60438 31-Dec-13<br />

56601 24-Oct-13<br />

47801 30-May-13<br />

44581 09-Apr-13<br />

43766 25-Mar-13<br />

40843 13-Feb-13<br />

39982 16-Jan-13<br />

37988 07-Dec-12<br />

31802 23-Aug-12<br />

10985 14-Oct-11<br />

D/E sanctioned for Rs. 84,54,164/-. (5th priority)<br />

EE reported: Road transter to MC on 21.10.2013.<br />

AR tender on 29.05.2013 received and work allotted on 29.05.2013.<br />

Patch work completed on 10.12.12 Exp. 0.22 lacs.<br />

Patch work completed on 10.12.2012 in A/R.<br />

patch work done in A/R 2012-13.<br />

A/R done on 10.12.2012.<br />

work completed on 26.11.2012.<br />

under transfer to MC. But road portion dismantled by PWD /PH is<br />

being taken up against the funds deposited by P.H.<br />

Constructed 1996. Path 4 karam. Crust 150mm. Patch + PC in<br />

4/2009. Patches (78sqm) done on 21/10/2011 to 23/10/2011 (15K).<br />

7) H - 1716 National Highway To Alipur Town Panchkula<br />

0.31 km.<br />

60443 31-Dec-13<br />

60274 21-Dec-13<br />

56607 24-Oct-13<br />

50962 03-Jul-13<br />

44582 09-Apr-13<br />

40844 13-Feb-13<br />

D/E sanctioned for Rs. 84,54,164/-. (5th priority)<br />

D/E tech. sanctioned for Rs. 8454164/- for a group of 1724, 1712,<br />

1725, 1726, 1714, 1727, 1715, 1716, 1717, 1718, 1719, 1720, 1721,<br />

1722 & 1723.<br />

EE reported: Road transter to MC on 22.10.2013.<br />

208.65 Sqm patch done from 26/5/2013 to 27/5/2013 (Exp 39 k).<br />

Road is in good condition<br />

Patch work taken in A/R 2012-13. A/R required will be done in 2013-<br />

14.<br />

Monday, January 20, 2014 Page 18 of 24


31783 23-Aug-12<br />

10986 14-Oct-11<br />

Road is motorable condition.<br />

Constructed 1995. Path 4 karam. Crust 150mm. Patch + PC in<br />

4/2009. Patches (25 sqm) done in 10/8/2011 to 6/9/2011 (3.6K).<br />

8) H - 1718 Kalka Ramgarh Road To Nada Panchkula<br />

0.46 km.<br />

60445 31-Dec-13<br />

60276 21-Dec-13<br />

56604 24-Oct-13<br />

50994 04-Jul-13<br />

43806 25-Mar-13<br />

40877 13-Feb-13<br />

31795 23-Aug-12<br />

404 31-Jul-11<br />

10939 30-Jul-11<br />

D/E sanctioned for Rs. 84,54,164/-. (5th priority)<br />

D/E tech. sanctioned for Rs. 8454164/- for a group of 1724, 1712,<br />

1725, 1726, 1714, 1727, 1715, 1716, 1717, 1718, 1719, 1720, 1721,<br />

1722 & 1723.<br />

EE reported: Road transter to MC on 22.10.2013.<br />

AR work for 2013-14 allotted to M/s Dynamic Constn. Co. on<br />

16/5/2013 shown transferred to MC but not taken over by MC so<br />

far.<br />

Transfer to MC vide his office memo no. 715 dated 07.02.2013.<br />

Taken in A/R 2012-13.<br />

Under transfer to M.C.<br />

EE Reported, Road is in Good Condition.<br />

Constructed 6/1993. Path 4 karam. Crust 150mm. PC done 5/2010.<br />

No patches.<br />

9) H - 1722 Ram Bagh Road To Bahiaron Ki Sair Kalka<br />

0.70 km.<br />

60449 31-Dec-13<br />

60280 21-Dec-13<br />

56598 24-Oct-13<br />

50989 04-Jul-13<br />

44625 09-Apr-13<br />

31798 23-Aug-12<br />

18086 14-Feb-12<br />

10989 14-Oct-11<br />

D/E sanctioned for Rs. 84,54,164/-. (5th priority)<br />

D/E tech. sanctioned for Rs. 8454164/- for a group of 1724, 1712,<br />

1725, 1726, 1714, 1727, 1715, 1716, 1717, 1718, 1719, 1720, 1721,<br />

1722 & 1723.<br />

EE reported: Road transter to MC on 21.10.2013.<br />

E.O./Xen, MC requested to take over this road but not taken over<br />

so far. However AR work for 2013-14 allotted on 29/5/2013.<br />

Road is patch less.<br />

Under transfer to MC.<br />

E.E reported road is patchless.<br />

Constructed 1996. Path 4 karam. Crust 150mm. Patch + PC in<br />

6/2009. Patches (68 sqm) done in 11/10/2011 to 13/10/2011 (15K).<br />

10) H - 1725 Pinjore Tipra Marg To Ghatiwala Harijan Basti Kalka<br />

0.37 km.<br />

60437 31-Dec-13<br />

60269 21-Dec-13<br />

44635 24-Oct-13<br />

44626 09-Apr-13<br />

31799 23-Aug-12<br />

18087 14-Feb-12<br />

14069 02-Nov-11<br />

10990 14-Oct-11<br />

D/E sanctioned for Rs. 84,54,164/-. (5th priority)<br />

D/E tech. sanctioned for Rs. 8454164/- for a group of 1724, 1712,<br />

1725, 1726, 1714, 1727, 1715, 1716, 1717, 1718, 1719, 1720, 1721,<br />

1722 & 1723.<br />

EE reported: Road transter to MC on 21.10.2013.<br />

Patch work completed on 22.03.13 in AR 2012-13. Exp. 0.18 lacs.<br />

under transfer to MC.<br />

E.E reported road is patchless.<br />

(36 sqm) patches done from 21/10/2011 to 23/10/2011<br />

(Expenditure 7K).<br />

Constructed 1996. Path 4 karam. Crust 150mm. Patch + PC in<br />

10/2009.<br />

11) H - 1726 Housing <strong>Board</strong> Colony Kalka To Karari Kalka<br />

0.33 km.<br />

Monday, January 20, 2014 Page 19 of 24


60439 31-Dec-13<br />

60270 21-Dec-13<br />

56612 24-Oct-13<br />

50990 04-Jul-13<br />

44630 09-Apr-13<br />

31800 23-Aug-12<br />

18088 14-Feb-12<br />

14070 02-Nov-11<br />

10991 14-Oct-11<br />

D/E sanctioned for Rs. 84,54,164/-. (5th priority)<br />

D/E tech. sanctioned for Rs. 8454164/- for a group of 1724, 1712,<br />

1725, 1726, 1714, 1727, 1715, 1716, 1717, 1718, 1719, 1720, 1721,<br />

1722 & 1723.<br />

EE reported: Road transter to MC on 23.10.2013.<br />

E.O./Xen, MC requested to take over this road but not taken over<br />

so far. However AR work for 2013-14 allotted on 29/5/2013.<br />

Road is in good condition.<br />

Under transfer to MC.<br />

E.E reported road is patchless.<br />

(32 sqm) patches done from 21/10/2011 to 23/10/2011<br />

(Expenditure 6K).<br />

Constructed 1996. Path 4 karam. Crust 150mm. Patch + PC in<br />

6/2009.<br />

12) H - 1728 Main Road To Shukhdarshanpur Panchkula<br />

1.12 km.<br />

56608 24-Oct-13<br />

44585 09-Apr-13<br />

43769 25-Mar-13<br />

40848 13-Feb-13<br />

31780 23-Aug-12<br />

22026 04-Apr-12<br />

18384 17-Feb-12<br />

10923 30-Jul-11<br />

EE reported: Road transter to MC on 22.10.2013.<br />

Patch work completed on 23.03.13 in AR 2012-13. Exp. 0.82 lacs.<br />

Patch work completed on 23.03.2013 in A/R.<br />

Taken in A/R 2012-13 in the year 2013-14.<br />

Road is mortorable condition, small patch work is being taken in<br />

A/R.<br />

EE reported, road is patchless.<br />

WBM patches done. PC patches left due to cold weather will be<br />

completed upto 15.03.2012<br />

Constructed 2001. Path 4 karam. Crust 150mm. PC done 6/2009.<br />

Patch work required (EC 50 K)<br />

13) H - 1739 Billa To Assrewali. Panchkula<br />

0.50 km.<br />

56609 24-Oct-13<br />

44595 09-Apr-13<br />

40858 13-Feb-13<br />

10969 30-Jul-11<br />

EE reported: Road transter to MC on 21.10.2013.<br />

Patch work completed on 18.03.13 in AR 2012-13. Exp. 0.61 lacs.<br />

Taken in A/R 2012-13.<br />

Constructed 1994. Path 4 karam. Crust 150mm. PC done in 8/2011.<br />

No patch.<br />

14) H - 1744 Kalka Bargodam Road To Majra Mehtab. Kalka<br />

0.16 km.<br />

56613 24-Oct-13<br />

44600 09-Apr-13<br />

39991 16-Jan-13<br />

37991 07-Dec-12<br />

33224 25-Sep-12<br />

10974 30-Jul-11<br />

EE reported: Road transter to MC on 23.10.2013.<br />

S/R in 8th priority completed on 05.12.12. Exp. 1.46 lacs<br />

P.C completed in 160mtr.<br />

work completed on 05.12.2012.<br />

Work allotted to Sh. Gulshan Kumar, work not allotted E.M.<br />

forfeated & tender was received on 30.09.2012<br />

Constructed 1994. Path 4 karam. Crust 150m. Patch + PC<br />

sanctioned on 27/9/2010. Work yet to be done. Tender received.<br />

Recalled patches be done first (E/C 1.15 lacs).<br />

15) H - 1746 National Highway To Village Kisangarh Panchkula<br />

0.18 km.<br />

56605 24-Oct-13<br />

EE reported: Road transter to MC on 22.10.2013.<br />

Monday, January 20, 2014 Page 20 of 24


44601 09-Apr-13<br />

39992 16-Jan-13<br />

37993 07-Dec-12<br />

10976 30-Jul-11<br />

S/R in 8th priority completed on 26.11.12 Exp. 1.57 lacs<br />

P.C completed in 187mtr.<br />

Work completed on 26.11.2012.<br />

Constructed 2001. Path 4 karam. Crust 150m. Patch + PC<br />

sanctioned in 2010. Tender received. Falls in MC area.<br />

16) H - 1756 Kalka Chandigarh Road To Chandi & Chandi Kotla Kalka<br />

1.26 km.<br />

56599 24-Oct-13<br />

44606 09-Apr-13<br />

37978 07-Dec-12<br />

33227 25-Sep-12<br />

29055 20-Jul-12<br />

11061 17-Oct-11<br />

10891 30-Jul-11<br />

EE reported: Road transter to MC on 21.10.2013.<br />

S/R work plan 2012-13 completed on 10.10.12. Exp. 8.65 lacs<br />

Work completed on 10.10.12 paver block in 230 mtr.<br />

Work awarded to Sushel Sedgal on 16.07.2012. 230m Paver Block<br />

complete, likely date 15.10.2012<br />

AA on 11/7/2012 for Rs. 12.23 lacs.<br />

SE proposes: 300m paver block over GSB and in 200m hard<br />

shouldering with paver block (EC: 12 lacs).<br />

Constructed 1995. Crust 150mm. PC done in 2002. Panchayat has<br />

done CC in 750m. CC has also broken.<br />

17) H - 1758 Kalka Chandigarh Road To Bhagwanpur Kalka<br />

1.61 km.<br />

56600 24-Oct-13<br />

50970 03-Jul-13<br />

43807 25-Mar-13<br />

31801 23-Aug-12<br />

22029 04-Apr-12<br />

18388 17-Feb-12<br />

10894 30-Jul-11<br />

EE reported: Road transter to MC on 21.10.2013.<br />

1256.87 Sqm patch done from 23/5/2013 to 26/5/2013 (Exp 308 k).<br />

Transfer to MC vide his office memo no. 715 dated 07.02.2013.<br />

under transfer to MC.<br />

EE reported, road is patchless.<br />

WBM patches done. PC patches left due to cold weather will be<br />

completed upto 15.03.2012<br />

Constructed 1996. Crust 150mm. PC done in 2006.<br />

18) H - 1759 Uprli Kundi To Nichli Kundi Kalka<br />

1.48 km.<br />

56603 24-Oct-13<br />

43809 25-Mar-13<br />

10927 30-Jul-11<br />

EE reported: Road transter to MC on 22.10.2013.<br />

Transfer to MC vide his office memo no. 715 dated 07.02.2013.<br />

Constructed 8/1995. Path 4 karam. Crust 150mm. MC Panchkula<br />

taken over road in 2005, CC done (entire).<br />

19) H - 1768 <strong>State</strong> Bank Kalka To Tipra Kalka<br />

1.31 km.<br />

56597 24-Oct-13<br />

50987 04-Jul-13<br />

45510 18-Apr-13<br />

43817 25-Mar-13<br />

43336 19-Mar-13<br />

7791 03-Oct-11<br />

10936 30-Jul-11<br />

EE reported: Road transter to MC on 21.10.2013.<br />

E.O/XEN MC, requested to take over the road but not AR work for<br />

2013 - 14 to be done. Work allotted on 29/5/2013.<br />

Transferred back from PWD on 17.4.2013 within a list of 550<br />

(76+474) roads.<br />

HSAMB roads likely back from PWD B&R.<br />

PWD executing / has executed work worth 57 lacs.<br />

Transferred to PWD. PWD RoadID : 9261<br />

Constructed 1/1990. Path 6 karam. Crust 150mm. No record of S/R.<br />

Sub Total:<br />

15.78 km.<br />

Transferred to PWD (938 roads)<br />

Panchkula<br />

Monday, January 20, 2014 Page 21 of 24


1) H - 1708 Khatauli To Rehwar Panchkula<br />

4.30 km.<br />

60474 31-Dec-13<br />

7876 03-Oct-11<br />

10929 30-Jul-11<br />

D/E technically sanctioned for Rs. 79,20,926/-. (2nd priority).<br />

Transferred to PWD. PWD RoadID : 9267<br />

Constructed 1995. Path 6 karam. Crust 150mm. (30m) CC + PC<br />

(rest) done 2/2007.<br />

2) H - 1711 National Highway To Kammi Road Via Naggal Panchkula<br />

1.20 km.<br />

60477 31-Dec-13<br />

43335 19-Mar-13<br />

7875 03-Oct-11<br />

10930 30-Jul-11<br />

D/E technically sanctioned for Rs. 79,20,926/-. (2nd priority).<br />

PWD executing / has executed work worth 41.56 lacs.<br />

Transferred to PWD. PWD RoadID : 9264<br />

Constructed 2001. Path 8 karam. Crust 150mm. PC done 4/2007.<br />

3) H - 1767 Firozpur To Hangola Kalka<br />

4.02 km.<br />

13972 31-Oct-11<br />

10935 30-Jul-11<br />

There was a proposal to shift alignment of 320m due to court case.<br />

AA was also granted. The approval was arranged as High Court<br />

ordered shifting the road portion on actual alignment. The Court<br />

case has been withdrawn. We need to ensure that AA is<br />

withdrawn. Whatever is to be done it would be done by PWD.<br />

Constructed 3/1990. Path 6 karam. Crust 150mm. PC done 2002.<br />

Transferred to PWD. PWD RoadID : 9269<br />

4) H - 1770 Islamnagar To Bakshiwala Kalka<br />

1.40 km.<br />

7788 03-Oct-11<br />

10937 30-Jul-11<br />

Transferred to PWD. PWD RoadID : 8344<br />

Constructed 1993. Path 6 karam. Crust 150mm. PC done 2002.<br />

Sub Total:<br />

10.92 km.<br />

Transferred to PWD (Individual)<br />

1) H - 1760 Hangoli To Sanmanva Kalka<br />

1.29 km.<br />

22909 03-May-12<br />

10925 30-Jul-11<br />

Part of PWD road added casuse mis match reported by SDE Dhillion<br />

Constructed 12/1997. Path 6 karam. Crust 150mm. PC done 2001.<br />

PWD Road ID 8605. PWD length mismatch.<br />

2) H - 1769 Manak Tabra To Toka Kalka<br />

3.60 km.<br />

22910 03-May-12<br />

10926 30-Jul-11<br />

Part of PWD road added casuse mis match reported by SDE Dhillion<br />

Constructed 5/1991. Path 6 karam. Crust 150mm. PWD Road ID<br />

2815. PWD length mismatch.<br />

6. Other<br />

Sub Total:<br />

4.89 km.<br />

Dropped<br />

1) H - 1765 Karanpur To Johluwal Kalka<br />

0.91 km.<br />

2854 30-Aug-11<br />

2836 25-Aug-11<br />

AA for Rs. 8.19 lacs in 1996. Work could not be started. Path not<br />

available. No money spent. Close the case for cancellation. The<br />

road be deleted from the database.<br />

No consolidation path exists. No expenditure done. EE to move the<br />

case for de-sanctioned.<br />

Monday, January 20, 2014 Page 22 of 24


2) H - 4527 Shifting And Reconstruction Of Road Along Disputed<br />

Kalka<br />

0.32 km.<br />

Portion On Vill. Firozpur To Hangola.<br />

2855 30-Aug-11<br />

2713 24-Aug-11<br />

When court case has been withdrawn, there is no need. Let this AA<br />

be closed and this ID be deleted.<br />

SDE (Sh. Dhillon) reported that it is part of RoadID 1767. There is<br />

some dispute in road alignment. This approval was arranged as per<br />

High Court orders to shift the road portion on actual alignment. EE<br />

should get de-sanction this road.<br />

3) H - 7185 Main road to vill. Garhi Kotaha Panchkula<br />

0.50 km.<br />

57350 06-Nov-13<br />

53735 29-Aug-13<br />

52520 06-Aug-13<br />

CA ordered on 27.08.2013, road does not fall in the policy of the<br />

<strong>Board</strong>. Case may be file.<br />

PR sent to CA on 29.8.2013.<br />

Request of gram panchayat garhri kotha path is 0 to 182m = 22',<br />

182 to 231m = 14' - 2". 231 to 320m = 18' - 11", 320 to 360m = 22',<br />

36 to 485m = 19' - 8".<br />

Sub Total:<br />

1.73 km.<br />

Rejected by Government<br />

1) H - 6821 Thandog to Samlana Ghat (HP) Kalka<br />

4.50 km.<br />

59164 04-Dec-13<br />

46718 03-May-13<br />

42202 13-Mar-13<br />

41698 06-Mar-13<br />

41490 28-Feb-13<br />

Hon'ble CM has not approved the construction of this road due to<br />

non-availablitity of consolidation path on dated 25.11.2013.<br />

Case sent to Hon'ble AM vide PSA no. 694 dated 11/04/2013<br />

Case sent to PSA on 13.03.2013.<br />

CP-Nil. Land belongs to forest deptt. Upward of EIC on 6.3.2013 for<br />

appropriate decision of the Government.<br />

On the request of Rajesh Kona Chairman Z.P. Hon'ble CM ordered<br />

for examine and take necessary action. Path not available. No<br />

distance shortened. Road does not falls in the policy of the board.<br />

Sub Total:<br />

4.50 km.<br />

Relates to other department<br />

1) H - 7259 Dakra Sahib Patshahi to Narayanpur<br />

Panchkula<br />

km.<br />

55505 27-Sep-13<br />

55305 18-Sep-13<br />

Road taken up by PWD B&R for construction. R/C/E submitted by<br />

EE Road-I B&R vide memo no. 48043 dated 12.08.2013 to SE Road<br />

B&R.<br />

Demanded by various Gram Panchayat and Guruduwara<br />

committee, Dakra Sahib & rececommended by Sh. D.K. Bansal, MLA<br />

Panchkula. On 06.09.2013, Hon'ble CM has asked to examine and<br />

do the needfull.<br />

Sub Total:<br />

km.<br />

Monday, January 20, 2014 Page 23 of 24


Grand Total:<br />

98.41 km.<br />