21.09.2015 Views

Haryana State Agricultural Marketing Board

13.Panchkula - Haryana Marketing Board

13.Panchkula - Haryana Marketing Board

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

1) H - 1708 Khatauli To Rehwar Panchkula<br />

4.30 km.<br />

60474 31-Dec-13<br />

7876 03-Oct-11<br />

10929 30-Jul-11<br />

D/E technically sanctioned for Rs. 79,20,926/-. (2nd priority).<br />

Transferred to PWD. PWD RoadID : 9267<br />

Constructed 1995. Path 6 karam. Crust 150mm. (30m) CC + PC<br />

(rest) done 2/2007.<br />

2) H - 1711 National Highway To Kammi Road Via Naggal Panchkula<br />

1.20 km.<br />

60477 31-Dec-13<br />

43335 19-Mar-13<br />

7875 03-Oct-11<br />

10930 30-Jul-11<br />

D/E technically sanctioned for Rs. 79,20,926/-. (2nd priority).<br />

PWD executing / has executed work worth 41.56 lacs.<br />

Transferred to PWD. PWD RoadID : 9264<br />

Constructed 2001. Path 8 karam. Crust 150mm. PC done 4/2007.<br />

3) H - 1767 Firozpur To Hangola Kalka<br />

4.02 km.<br />

13972 31-Oct-11<br />

10935 30-Jul-11<br />

There was a proposal to shift alignment of 320m due to court case.<br />

AA was also granted. The approval was arranged as High Court<br />

ordered shifting the road portion on actual alignment. The Court<br />

case has been withdrawn. We need to ensure that AA is<br />

withdrawn. Whatever is to be done it would be done by PWD.<br />

Constructed 3/1990. Path 6 karam. Crust 150mm. PC done 2002.<br />

Transferred to PWD. PWD RoadID : 9269<br />

4) H - 1770 Islamnagar To Bakshiwala Kalka<br />

1.40 km.<br />

7788 03-Oct-11<br />

10937 30-Jul-11<br />

Transferred to PWD. PWD RoadID : 8344<br />

Constructed 1993. Path 6 karam. Crust 150mm. PC done 2002.<br />

Sub Total:<br />

10.92 km.<br />

Transferred to PWD (Individual)<br />

1) H - 1760 Hangoli To Sanmanva Kalka<br />

1.29 km.<br />

22909 03-May-12<br />

10925 30-Jul-11<br />

Part of PWD road added casuse mis match reported by SDE Dhillion<br />

Constructed 12/1997. Path 6 karam. Crust 150mm. PC done 2001.<br />

PWD Road ID 8605. PWD length mismatch.<br />

2) H - 1769 Manak Tabra To Toka Kalka<br />

3.60 km.<br />

22910 03-May-12<br />

10926 30-Jul-11<br />

Part of PWD road added casuse mis match reported by SDE Dhillion<br />

Constructed 5/1991. Path 6 karam. Crust 150mm. PWD Road ID<br />

2815. PWD length mismatch.<br />

6. Other<br />

Sub Total:<br />

4.89 km.<br />

Dropped<br />

1) H - 1765 Karanpur To Johluwal Kalka<br />

0.91 km.<br />

2854 30-Aug-11<br />

2836 25-Aug-11<br />

AA for Rs. 8.19 lacs in 1996. Work could not be started. Path not<br />

available. No money spent. Close the case for cancellation. The<br />

road be deleted from the database.<br />

No consolidation path exists. No expenditure done. EE to move the<br />

case for de-sanctioned.<br />

Monday, January 20, 2014 Page 22 of 24

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!