Haryana State Agricultural Marketing Board
13.Panchkula - Haryana Marketing Board
13.Panchkula - Haryana Marketing Board
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
1) H - 1708 Khatauli To Rehwar Panchkula<br />
4.30 km.<br />
60474 31-Dec-13<br />
7876 03-Oct-11<br />
10929 30-Jul-11<br />
D/E technically sanctioned for Rs. 79,20,926/-. (2nd priority).<br />
Transferred to PWD. PWD RoadID : 9267<br />
Constructed 1995. Path 6 karam. Crust 150mm. (30m) CC + PC<br />
(rest) done 2/2007.<br />
2) H - 1711 National Highway To Kammi Road Via Naggal Panchkula<br />
1.20 km.<br />
60477 31-Dec-13<br />
43335 19-Mar-13<br />
7875 03-Oct-11<br />
10930 30-Jul-11<br />
D/E technically sanctioned for Rs. 79,20,926/-. (2nd priority).<br />
PWD executing / has executed work worth 41.56 lacs.<br />
Transferred to PWD. PWD RoadID : 9264<br />
Constructed 2001. Path 8 karam. Crust 150mm. PC done 4/2007.<br />
3) H - 1767 Firozpur To Hangola Kalka<br />
4.02 km.<br />
13972 31-Oct-11<br />
10935 30-Jul-11<br />
There was a proposal to shift alignment of 320m due to court case.<br />
AA was also granted. The approval was arranged as High Court<br />
ordered shifting the road portion on actual alignment. The Court<br />
case has been withdrawn. We need to ensure that AA is<br />
withdrawn. Whatever is to be done it would be done by PWD.<br />
Constructed 3/1990. Path 6 karam. Crust 150mm. PC done 2002.<br />
Transferred to PWD. PWD RoadID : 9269<br />
4) H - 1770 Islamnagar To Bakshiwala Kalka<br />
1.40 km.<br />
7788 03-Oct-11<br />
10937 30-Jul-11<br />
Transferred to PWD. PWD RoadID : 8344<br />
Constructed 1993. Path 6 karam. Crust 150mm. PC done 2002.<br />
Sub Total:<br />
10.92 km.<br />
Transferred to PWD (Individual)<br />
1) H - 1760 Hangoli To Sanmanva Kalka<br />
1.29 km.<br />
22909 03-May-12<br />
10925 30-Jul-11<br />
Part of PWD road added casuse mis match reported by SDE Dhillion<br />
Constructed 12/1997. Path 6 karam. Crust 150mm. PC done 2001.<br />
PWD Road ID 8605. PWD length mismatch.<br />
2) H - 1769 Manak Tabra To Toka Kalka<br />
3.60 km.<br />
22910 03-May-12<br />
10926 30-Jul-11<br />
Part of PWD road added casuse mis match reported by SDE Dhillion<br />
Constructed 5/1991. Path 6 karam. Crust 150mm. PWD Road ID<br />
2815. PWD length mismatch.<br />
6. Other<br />
Sub Total:<br />
4.89 km.<br />
Dropped<br />
1) H - 1765 Karanpur To Johluwal Kalka<br />
0.91 km.<br />
2854 30-Aug-11<br />
2836 25-Aug-11<br />
AA for Rs. 8.19 lacs in 1996. Work could not be started. Path not<br />
available. No money spent. Close the case for cancellation. The<br />
road be deleted from the database.<br />
No consolidation path exists. No expenditure done. EE to move the<br />
case for de-sanctioned.<br />
Monday, January 20, 2014 Page 22 of 24