Haryana State Agricultural Marketing Board
13.Panchkula - Haryana Marketing Board
13.Panchkula - Haryana Marketing Board
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
10933 30-Jul-11<br />
Constructed 2002. Path 6 karam. Crust 150mm. No S/R done.<br />
25) H - 1736 Main Road To Madhawala Kalka<br />
0.22 km.<br />
50969 03-Jul-13<br />
44592 09-Apr-13<br />
18091 14-Feb-12<br />
14053 02-Nov-11<br />
10907 14-Oct-11<br />
176.26 Sqm patch done from 20/5/2013 to 22/5/2013 (Exp 44 k).<br />
Road is patch less.<br />
E.E reported road is patchless.<br />
Constructed 6/2002. Path 4 karam. Crust 150mm. 75mm WBM + PC<br />
done in 12/2010.<br />
Patches 21 sqm done on 11/10/2011 to 15/10/2011 (Expenditure<br />
4K).<br />
26) H - 1737 Barwala School To Bhareli Road. Panchkula<br />
0.17 km.<br />
44593 09-Apr-13<br />
40856 13-Feb-13<br />
10888 30-Jul-11<br />
Patch work completed on 23.03.13 in AR 2012-13. Exp. 1.31 lacs.<br />
Patch work requires will be done in A/R 2012-13.<br />
Constructed 1994. Path 4 karam. Crust 150mm. PC done in 8/2011.<br />
27) H - 1738 Punjab Bordar To Sangrana Panchkula<br />
0.25 km.<br />
44594 09-Apr-13<br />
40857 13-Feb-13<br />
10968 30-Jul-11<br />
Patch work completed on 22.03.13 in AR 2012-13. Exp. 0.67 lacs.<br />
Patch work will be done in A/R 2012-13.<br />
Constructed 1994. Path 4 karam. Crust 150mm. PC done in 8/2011.<br />
28) H - 1740 <strong>State</strong> Highway To Kammi. Panchkula<br />
4.24 km.<br />
50963 03-Jul-13<br />
44596 09-Apr-13<br />
40859 13-Feb-13<br />
23671 22-May-12<br />
10970 30-Jul-11<br />
1259.36 Sqm patch done from 30/5/2013 to 2/6/2013 (Exp 285 k).<br />
Road is in good condition.<br />
some patches exist will be repaired in A/R 2013-14.<br />
Work completed on 15.04.2012<br />
Constructed 1994. Path 4 karam. Crust 150mm. Patches + PC<br />
sanctioned on 31/7/2009, allotted on 04/02/2010. 1.7 km PC done<br />
(Sarvan Kumar). Work is proceeding. Likely completion by<br />
15/11/2011.<br />
29) H - 1741 Gogga Mari To Parwala. Kalka<br />
0.37 km.<br />
50811 03-Jul-13<br />
44597 09-Apr-13<br />
40860 13-Feb-13<br />
18092 14-Feb-12<br />
10971 30-Jul-11<br />
241.31 Sqm patch done from 1/6/2013 to 4/6/2013 (Exp 45 k).<br />
Patch work completed on 23.03.13 in AR 2012-13. Exp. 0.06 lacs.<br />
Taken in A/R 2012-13.<br />
E.E reported road is patchless.<br />
Constructed 2001. Path 4 karam. Crust 150mm. PC done in 4/2011.<br />
No patch.<br />
30) H - 1742 Manak Tabra To Rurki Kalka<br />
1.82 km.<br />
50958 03-Jul-13<br />
44598 09-Apr-13<br />
40861 13-Feb-13<br />
22149 04-Apr-12<br />
10972 30-Jul-11<br />
1058.48 Sqm patch done from 8/6/2013 to 11/6/2013 (Exp 233 k).<br />
Road is motorable/Pot hole free<br />
Patch work will be done 2012-13.<br />
Work completed on 31.03.2012<br />
Constructed 1994. Path 4 karam. 720m CC (RD 1100 - 1820m in vill.<br />
Manak Tabra )+ rest PC sanctioned in 2009. CC done in 4/2010. PC<br />
remains.<br />
Monday, January 20, 2014 Page 8 of 24