21.09.2015 Views

Haryana State Agricultural Marketing Board

13.Panchkula - Haryana Marketing Board

13.Panchkula - Haryana Marketing Board

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

10933 30-Jul-11<br />

Constructed 2002. Path 6 karam. Crust 150mm. No S/R done.<br />

25) H - 1736 Main Road To Madhawala Kalka<br />

0.22 km.<br />

50969 03-Jul-13<br />

44592 09-Apr-13<br />

18091 14-Feb-12<br />

14053 02-Nov-11<br />

10907 14-Oct-11<br />

176.26 Sqm patch done from 20/5/2013 to 22/5/2013 (Exp 44 k).<br />

Road is patch less.<br />

E.E reported road is patchless.<br />

Constructed 6/2002. Path 4 karam. Crust 150mm. 75mm WBM + PC<br />

done in 12/2010.<br />

Patches 21 sqm done on 11/10/2011 to 15/10/2011 (Expenditure<br />

4K).<br />

26) H - 1737 Barwala School To Bhareli Road. Panchkula<br />

0.17 km.<br />

44593 09-Apr-13<br />

40856 13-Feb-13<br />

10888 30-Jul-11<br />

Patch work completed on 23.03.13 in AR 2012-13. Exp. 1.31 lacs.<br />

Patch work requires will be done in A/R 2012-13.<br />

Constructed 1994. Path 4 karam. Crust 150mm. PC done in 8/2011.<br />

27) H - 1738 Punjab Bordar To Sangrana Panchkula<br />

0.25 km.<br />

44594 09-Apr-13<br />

40857 13-Feb-13<br />

10968 30-Jul-11<br />

Patch work completed on 22.03.13 in AR 2012-13. Exp. 0.67 lacs.<br />

Patch work will be done in A/R 2012-13.<br />

Constructed 1994. Path 4 karam. Crust 150mm. PC done in 8/2011.<br />

28) H - 1740 <strong>State</strong> Highway To Kammi. Panchkula<br />

4.24 km.<br />

50963 03-Jul-13<br />

44596 09-Apr-13<br />

40859 13-Feb-13<br />

23671 22-May-12<br />

10970 30-Jul-11<br />

1259.36 Sqm patch done from 30/5/2013 to 2/6/2013 (Exp 285 k).<br />

Road is in good condition.<br />

some patches exist will be repaired in A/R 2013-14.<br />

Work completed on 15.04.2012<br />

Constructed 1994. Path 4 karam. Crust 150mm. Patches + PC<br />

sanctioned on 31/7/2009, allotted on 04/02/2010. 1.7 km PC done<br />

(Sarvan Kumar). Work is proceeding. Likely completion by<br />

15/11/2011.<br />

29) H - 1741 Gogga Mari To Parwala. Kalka<br />

0.37 km.<br />

50811 03-Jul-13<br />

44597 09-Apr-13<br />

40860 13-Feb-13<br />

18092 14-Feb-12<br />

10971 30-Jul-11<br />

241.31 Sqm patch done from 1/6/2013 to 4/6/2013 (Exp 45 k).<br />

Patch work completed on 23.03.13 in AR 2012-13. Exp. 0.06 lacs.<br />

Taken in A/R 2012-13.<br />

E.E reported road is patchless.<br />

Constructed 2001. Path 4 karam. Crust 150mm. PC done in 4/2011.<br />

No patch.<br />

30) H - 1742 Manak Tabra To Rurki Kalka<br />

1.82 km.<br />

50958 03-Jul-13<br />

44598 09-Apr-13<br />

40861 13-Feb-13<br />

22149 04-Apr-12<br />

10972 30-Jul-11<br />

1058.48 Sqm patch done from 8/6/2013 to 11/6/2013 (Exp 233 k).<br />

Road is motorable/Pot hole free<br />

Patch work will be done 2012-13.<br />

Work completed on 31.03.2012<br />

Constructed 1994. Path 4 karam. 720m CC (RD 1100 - 1820m in vill.<br />

Manak Tabra )+ rest PC sanctioned in 2009. CC done in 4/2010. PC<br />

remains.<br />

Monday, January 20, 2014 Page 8 of 24

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!